Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jul 27, 2017 20:22:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jul 27, 2017 20:22:49 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ramkumar
Page#    7 Blog Entries  next>>
  
Predictions: 25
confirm: 9
rac: 11
wl: 5
Journey: Fri Oct 11, 2013 @ 21:15
Class: Sleeper - SL   |   Tot Seats: Avbl 223
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   MDU/Madurai Junction   |   479 km / 776 km
16236/Mysuru - Tuticorin Express
Entry# 873599
 

Posted by: Ramkumar   7 blog posts   9 correct pred (83% accurate)
PNR: 415-xxxxxxx   |   Similar PNRs
Posted Status as of: Oct 10 2013 (18:00)
Passenger 1: Waitlist# 26 (Booking Status: W/L 61,RLGN)
Passenger 2: Waitlist# 27 (Booking Status: W/L 62,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 11 2013 (18:48)
Passenger 1: S11,71/Coach Position:17 (Booking Status: W/L 61,RLGN)
Passenger 2: S11,72/Coach Position:17 (Booking Status: W/L 62,RLGN)
Chart PREPARED

  
1030 views
Oct 11 2013 (17:29)
Tony Stark   9658 blog posts   102294 correct pred (88% accurate)
Re# 873599-1            Tags   Past Edits
#RACallocation 40 in SL from SBC to MDU (RLGN)

  
1272 views
Oct 11 2013 (18:44)
12633 34 Kanyakumari Exp 12623 24 LHB TVC Mail*^~   1513 blog posts   5657 correct pred (68% accurate)
Re# 873599-2            Tags   Past Edits
#RLRAC RAC 1-40
  
General Travel
0 Followers
958 views
Feb 19 2013 (16:58)  
 

Ramkumar   7 blog posts   9 correct pred (83% accurate)
Entry# 674454            Tags   Past Edits
Hi,
I am staying near KR puram railway station and working in ITC infotech near Bangalore East, Which is the best train to travel

  
460 views
Feb 19 2013 (16:59)
Guest: 3ef92a36   show all posts
Re# 674454-1            Tags   Past Edits
to whr?

1 posts are hidden.

  
560 views
Feb 26 2013 (12:48)
Ramkumar   7 blog posts   9 correct pred (83% accurate)
Re# 674454-3            Tags   Past Edits
Yes correct, KR to BNCE

  
590 views
Feb 26 2013 (12:49)
Guest: 7e6ae018   show all posts
Re# 674454-4            Tags   Past Edits
your suitable timings?

  
587 views
Feb 26 2013 (12:49)
ಅಶೋಕ್ अशोक Ashok*^~   18345 blog posts   38072 correct pred (65% accurate)
Re# 674454-5            Tags   Past Edits
good number of express train stops both at KJM and BNCE, but for return journey its not the same case as express trains skip BNCE.

  
591 views
Feb 26 2013 (12:49)
Guest: 7e6ae018   show all posts
Re# 674454-6            Tags   Past Edits
TRIP HAS ENDED.
Blog  Time-Table

  
797 views
Jul 13 2012 (17:46)
Ramkumar   7 blog posts   9 correct pred (83% accurate)
Re# 448434-1            Tags   Past Edits
Super, I got berth.... I will work another 2 hr in office
  
Predictions: 17
confirm: 11
rac: 0
wl: 6
Journey: Fri Jun 15, 2012 @ 21:15
Class: Sleeper - SL   |   Tot Seats: Avbl 223
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   MDU/Madurai Junction   |   479 km / 776 km
16236/Mysuru - Tuticorin Express
Entry# 453878
 

Posted by: Ramkumar   7 blog posts   9 correct pred (83% accurate)
PNR: 455-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 14 2012 (10:11)
Passenger 1: Waitlist# 17 (Booking Status: W/L 18,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 15 2012 (18:59)
Passenger 1: Waitlist# 12 (Booking Status: W/L 18,CK)
Chart PREPARED

  
755 views
Jun 15 2012 (17:43)
Ramkumar   7 blog posts   9 correct pred (83% accurate)
Re# 453878-1            Tags   Past Edits
At what time chart will prepare? i need to travel 1 hr to the station.
TRIP HAS ENDED.
Blog  Time-Table
Page#    7 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 6
Trains with ARP 15 Dep on: Fri Aug 11
Trains with ARP 30 Dep on: Sat Aug 26
Trains with ARP 120 Dep on: Fri Nov 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.