Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jul 29, 2017 00:40:05 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jul 29, 2017 00:40:05 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by kruf2014
Page#    31 Blog Entries  next>>
  
★★★  General Travel
0 Followers
4925 views
May 26 2017 (11:41)   GR/Gulbarga (4 PFs)

skumarvkulkarni~   1695 blog posts
Entry# 2293605            Tags   Past Edits
Updates on Bidar Gulbarga New line at Sultanpur Station(Outskirts of Gulbarga)
- All platform works completed with FUB..
- LED lights are shining
- Huge Goods shed is almost ready( the existing Gulbarga station Goods shed will be shifted to Sultanpur Station soon)
-
...
more...
Once the Goods shed at Gulbarga is shifted to Sultanpur station(outskirts of gulbarga on Bidar line), there will be some space for stabling lines at GR station
- Sultanpur station looks to have 3 platforms (the third one may be used for Goods stabling)
- Overall works looks excellent as usual nothing to mention since its SCR line!

22 posts are hidden.

  
1883 views
May 30 2017 (13:55)
kruf2014   46 blog posts
Re# 2293605-23            Tags   Past Edits
not till GR outer..
Gulbarga to Khanapur (excluding)

2 posts are hidden.
  
★  Rail News
0 Followers
3101 views
New Facilities/TechnologySWR/South Western  -  
Apr 24 2017 (07:24)   Tirupati passenger will be express service from Aug.

rdb*^   130992 news posts
Entry# 2248059   News Entry# 300578         Tags   Past Edits
The highly patronized Chamarajanagar-Tirupati Fast Passenger will be converted into a mail or express service with change in the train number from August.
The Railways wanted to integrate the rake with the Taluguppa-Bengaluru passenger and the integrated rake upgraded to an express train, will also have higher punctuality compared to passenger trains, according to officials here.
Meanwhile, a release said Train No. 56213/56214, Chamarajanagar-Tirupati-Chamarajanagar Fast Passenger would be converted into Mail/Express with change in Train No. as 16219/16220.
The
...
more...
release said there was no change in existing stops, and the train composition and the converted service would commence from August 22 from Chamarajanagar and from August 23 from Tirupati end.
Accordingly, Train No. 16219 Chamarajanagar-Tirupati Express will depart from Chamarajanagar at 3.10 p.m, will arrive/depart from Nanjangud at 3.48 p.m/3.49 p.m. But there is no change in timings from Mysuru to Chandragiri, and the train will arrive at Tirupati at 5.25 a.m.
Return direction
In the return direction, there are no changes in the timings of Train No. 16220 Tirupati-Chamarajanagar Express from Tirupati to Nanjangud and the train will arrive at Chamarajanagar at 12.20 p.m.

12 posts are hidden.

  
1190 views
Apr 25 2017 (10:57)
kruf2014   46 blog posts
Re# 2248059-13            Tags   Past Edits
Express train, passenger timings..wowww..9 hours for a express night train from SBC to TPTY

3 posts are hidden.
  
★★  General Travel
0 Followers
1093 views
Apr 05 2017 (22:44)   Y/Yeliyur (2 PFs)

kruf2014   46 blog posts
Entry# 2224026            Tags   Past Edits
Ramanagram (RMGM) - Yeliyur (Y) Electrification - CRS inspection today morning (5 April 2017)
Inspection special spotted on PF 6 SBC at 6.55 am..Also seen staff decorating RPM E-loco.
New MEMU to Mandya from SBC or extension of existing RMGM Memu likely by month end
  
★★★  Rail Fanning
0 Followers
3199 views
Mar 01 2017 (12:26)   04715/Sri Ganganagar - Tiruchchirappalli - HumSafar Express Inaugural Special | SBH/Sulebhavi (1 PFs) | PUNE/WDM-3D/11406

दक्षिण पूर्व रेलवे^~   4315 blog posts   15745 correct pred (78% accurate)
Entry# 2182163            Tags   Past Edits
1 compliments
Good Awesome ...
Pune WDM3D hauling the First LHB train in PA-UBL section 04715 SGNR-TPJ HumSafar Exp on its Inagural Run
.
Pic By RF Kumar

7 posts are hidden.

  
2205 views
Mar 01 2017 (13:48)
kruf2014   46 blog posts
Re# 2182163-9            Tags   Past Edits
which place is this?

1 posts are hidden.

  
2413 views
Mar 01 2017 (14:04)
दक्षिण पूर्व रेलवे^~   4315 blog posts   15745 correct pred (78% accurate)
Re# 2182163-11            Tags   Past Edits
Will Tell You Later😊

3 posts are hidden.
  
★  Rail News
0 Followers
2940 views
Feb 22 2017 (09:21)   New Bengaluru-Hassan line commissioning next week; Prime Minister invited for inauguration

❤ WAP7 ❤~   1107 news posts
Entry# 2173862   News Entry# 294500         Tags   Past Edits
Hassan-Yeshwantpur Intercity Express is the first confirmed train to run after the formal inauguration, the date for which is yet to be announced
BANGALORE: Former Prime Minister and Hassan Lok Sabha member H.D. Deve Gowda will invite Prime Minister Narendra Modi to inaugurate the new Hassan-Bengaluru line. “The Railway Minister (Suresh Prabhu) desires that the line be opened by the Prime Minister and [has] requested me to extend a formal invitation. I’m going to Delhi tomorrow and try to speak the Prime Minister or intimate this to his office,” Mr. Deve Gowda told on Tuesday.
Immediately
...
more...
after coming to power, Mr.Modi had promised to complete the line on priority; it still took about three years. “I am not going to blame anyone for the inordinate delay of 22 years for the completion of the line,” said Mr. Deve Gowda, who had sanctioned the line when he was PM.
The 110-km Nelamangala-Shravanabelagola railway line, part of the new 166-km Bengaluru-Hassan line, is set to be commissioned by South Western Railway (SWR) on February 28. This follows authorisation given by A.K. Manoharan, Commissioner of Railway Safety, Southern Circle, who inspected the line and conducted speed trials between February 6 and 10. Ashok Gupta, chief administrative officer, Construction, SWR, told The Hindu that the commissioner on Monday issued authorisation to run passenger trains with a maximum speed of 80 kmph.
With this, the hope of the people of Hassan and coastal regions for the shortest rail route to Bengaluru has come true. The project had been announced by Deve Gowda way back in 1996, but the work progressed at a snail’s pace, partly owing to non-availability of land and mostly because of meagre fund allocation by the Railways.
Sharing the cost
In 2010, the then Chief Minister B.S. Yeddyurappa decided to share the cost of ongoing as well as new Railway projects to sped up the work. More funds from the Railways came when D.V. Sadananda Gowda was Railway Minister.
SWR’s chief public relations officer E. Vijaya said the commissioning would be done with a trial run of a passenger train on the section on February 28. The formal inauguration would be done depending upon the dates acceptable for the dignitaries.
New train
As of now, SWR has planned an intercity express between Hassan and Yeshwantpur, leaving Hassan at around 6 a.m. and reaching Yeshwantpur at 9.30 a.m. In the return direction, the train would leave Yeshwantpur at around 6 p.m. and reach Hassan at 9.30 p.m. It is tentatively scheduled to halt at Chikkabanavar, Kunigal, Yediyur, Balagangadhar Nagar, Shravanabelagola and Channarayapatna.
Meanwhile, the zone has sought the Railway Board’s permission to re-route the yet-to-be-introduced Train No. 16575/576 Bengaluru-Mangaluru Kudla Express via the new route. Mr. Sadananda Gowda had announced this train in 2014 to run via Mysuru.
Ms. Vijaya also said three goods trains between Mangaluru and Bengaluru would be diverted via the new section after February 28.
Manpower allocation
Since it is a large section, SWR requires at least 120 workers, including 60 tracks-men and about 35 stations masters. The zone is in the process of identifying personnel for posting and the process could take about a fortnight, Ms. Vijaya said.

4 posts are hidden.

  
Feb 22 2017 (13:34)
kruf2014   46 blog posts
Re# 2173862-5            Tags   Past Edits
Finallyyy!!! tentative timings for intercity is 3.5 hours...expected it to run faster..given that the line is without LC..i guess speed may be increased later..lets hope..SBC - ASK 166 km most Exp trains cover in 3 hours

1 posts are hidden.

  
1596 views
Feb 22 2017 (16:31)
Why not three languages in Aadhar~   4284 blog posts   324 correct pred (68% accurate)
Re# 2173862-7            Tags   Past Edits
We may also see few new north bound trains running via YPR-HAS-ASK-UBL, in future.

  
1313 views
Feb 22 2017 (16:34)
Venkat వెంకట్   3266 blog posts   1 correct pred (100% accurate)
Re# 2173862-8            Tags   Past Edits
how much time now it takes fro YPR-MANGLORE on this route ?

3 posts are hidden.
Page#    31 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Aug 8
Trains with ARP 15 Dep on: Sun Aug 13
Trains with ARP 30 Dep on: Mon Aug 28
Trains with ARP 120 Dep on: Sun Nov 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.