Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Apr 19 07:47:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
***Faster chain considering the idle time provided for refreshment ***Weekly***Convenient & Sufficient transfer time***An alternative route for TPJ,TJ,MQ pax to enjoy the beauty of KR with almost the same travel time***

14997/Σ Mumbai-Mangalore-CBE-Trichy-TJ-MQ(Xfer@CBE)Weekly ΣChain


Created: Jun 05 2013 (18:58) by Ashwin Kumar M A

Change Departure Station:
Change Arrival Station:

14
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 243 blog entries  next>>
General Travel
19085 views
1

Feb 21 (21:53)   22629/Dadar Central - Tirunelveli SF Express (via Konkan) (PT) | KGQ/Kasaragod (3 PFs)
Rajeervp
Rajeervp   6 blog posts
Entry# 5975906            Tags   Past Edits
1 compliments
Thanks:Updated.
Dear Teams, Train No: 22629 Between Dadar To Tirunelveli has been allotted stops at Kasaragod Station KGQ

Return Trip added.

Verify and update it.
Translate to English
Translate to Hindi
Travelogue
38969 views
12

★★
Feb 07 (10:22)   22613/Shraddha Sethu Express (PT) | TJ/Thanjavur Junction (5 PFs)
PattasuBalu~
PattasuBalu~   1937 blog posts
Entry# 5963414            Tags   Past Edits
4 compliments
Useful Useful Useful Great
Part - 1 : Scenarios at early morning of Mondays at Thanjavur Jn.
.
It was a chill winter morning, and the sky was dark, left my place at 6 am for a train which is scheduled to depart Thanjavur Jn at 0610 hrs, anticipating that my train should arrive minimum by a delay of 20 minutes. The only fear I had was the link it is supposed to get from Tiruchirapalli Jn, reason being that this train is known for getting WAG - 9 as a link for majority of the distance
...
more...
this train travels, and if it gets the same, the maximum speed will be restricted to 90kmph against the MPS of the route, cannot enjoy a superfast run with limited stoppages. And i had these experience quite few times previously on the same train. Anyways, not expecting much about the scenario at Thanjavur Jn at the busy morning hours, went with an open mind to the railway station through platform - 5 entrance, 5 minutes later than the scheduled departure of my train.
.
By the time i reached, I could see some LHB train already departing from platform - 3, towards mayiladuthurai side. Though the train in which I am supposed to travel is also running with LHB rakes, comes and departs in the same platform towards the same direction, I was able to confirm that the train leaving platform 3 is not the train I am supposed to travel, by seeing lots of sleeper class in that one. Yes, it is occasionally late running Mayiladuthurai bound Express from Mysore departing late by an hour. Once upon a time, this delay used to be pretty common for mayiladuthurai express, but post electrification, the incidence of this train getting delayed at Thanjavur is greatly reduced.
.
Though it is by default that my train arrives at platform 3 in Thanjavur, but anyways, went to the front entrance and again, checked the platform which my train was supposed to arrive, and yes, the display board also showed the same. So, as of now, my train is delayed. Strolled slowly to my platform and stood near the coach position, and the platform had a good crowd for the train I am supposed to board. People kept asking about the train to the railway staff in platform 3, regarding the train, since there was no announcement till then, and it is already 0630 hours now.
.
Since that the Mysore - Mayiladuthurai is delayed, the entire lineup behind it also started getting delayed. And announcement were going on for Mannargudi bound chemmozhi express that is supposed to arrive on platform 3, and yes it arrived with a Vijayawada based WAP -4, which will be leading it till Nidamangalam. Already the platform had good crowd, in addition to that, the crowd deboarding from chemmozhi, platform 3 was now flooding with people, and some passengers were rushing amidst the crowd to take ticket for karaikkal bound DEMU from Thanjavur and board the same, which is supposed to depart from platform - 5 on that day (usually it departs from platform - 4), but still it will not be a cross platform transfer. As chemmozhi got starter after a halt of less than 2 minutes, heard a loud shrill honk from a distance, yes, empty rake of uzhavan parked at platform 1, made its departure towards trichy for its scheduled primary maintenance there. Wished that it was operated as an express special towards trichy bidirectionally, it could have been very helpful for a lot of people going for office/College/etc. and, in antiparallel fashion that chemmozhi express also made its departure, and at the back of luggage car at the rear end, an erode based WAP - 4 was taking nap since Trichy, will wake up post Nidamangalam and, tow chemmozhi express towards Mannargudi, it's destination. This arrangement of attaching locomotives at both sides was made for chemmozhi express to minimise the time taken for locomotive to reversal at Nidamangalam jn, blocking the traffic for a long time, affecting the road traffic.
.
By the time chemmozhi departed, took out my phone and checked the running status of my train, and WIMT showed that my train has already arrived outers of Thanjavur Jn, and waiting for the empty rake of uzhavan Express to clear the line. After some minutes, my train made a slow entry into platform, and it was a great sense of relief after seeing that a royapuram based WAP - 7 30680 was pulling my train. So, my train arrived Thanjavur Jn with a delay of 36 mts, and I boarded my train.
.
Thanks for reading it patiently.
.
Part - 2 : /blog/post/5963946

Translate to English
Translate to Hindi

More Posts
Info Update
210299 views
9

Jan 26 (17:53)   16729/Madurai - Punalur Express (PT) | SLY/Samalpatti (2 PFs)
sivaprakashofficial^~
sivaprakashofficial^~   5891 blog posts
Entry# 5953159            Tags   Past Edits
3 compliments
Useful Useful Useful
Continuation of Experiental Stoppages.
Translate to English
Translate to Hindi

More Posts
General Travel
59428 views
8

Dec 27 2023 (08:01)   16615/Chemmozhi Express (PT) | CBE/Coimbatore Junction (6 PFs)
sivaprakashofficial^~
sivaprakashofficial^~   5891 blog posts
Entry# 5923879            Tags   Past Edits
2 compliments
Useful Great
Chemmozhi Express Rake Sharing Arrangement With Coimbatore Pollachi UR Spl
Translate to English
Translate to Hindi

More Posts
General Travel
18633 views
4

Dec 30 2023 (09:31)   16616/Chemmozhi Express (PT) | CBE/Coimbatore Junction (6 PFs)
sivaprakashofficial^~
sivaprakashofficial^~   5891 blog posts
Entry# 5927288            Tags   Past Edits
1 compliments
Useful
16615/16616 Chemmozhi Express Rake Sharing Arrangement With Pollachi UR Specials 06419/06420/06421/06422
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 243 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy