Search Trains
 ♦ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3E
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
2-month Availability Calendar
  Go  
Full Site Search
  Search  
 
Fri Jul 21, 2017 14:28:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jul 21, 2017 14:28:56 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Cost of Periodic Overhaul(POH)of one coach every 12 months  
1 Answers
Jan 14 2012 (17:50)
Coach Construction/Seating Arrangements

Entry# 941     
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~
Cost of Periodic Overhaul(POH)of one coach every 12 months

1 Followers
4325 views
Jan 14 2012 (16:08)
Blog Post# 327340-0     
AKGarg*   Added by: ® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~  Jan 14 2012 (17:50)
Cost of Periodic Overhaul(POH)of one coach every 12 months.
It costs the Indian Railways about 3-4 lakh Rupees for POH of each coach.
In a POH, the broken parts are repaired, light bulbs/tubes replaced, torn seats replaced, suspension overhauled, batteries replaced, wiring repaired if needed, additional charging plug points provided and the coach is repainted.
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.