News Super Search
 ♦ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 22:22:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 22:22:06 IST
Advanced Search
Trains in the News    Stations in the News   
<<prev entry    next entry>>
News Entry# 288690
  
Dec 15 2016 (09:32)  All new Prayagraj express to ply from December 18 (timesofindia.indiatimes.com)
back to top
Commentary/Human InterestNCR/North Central  -  

News Entry# 288690   Blog Entry# 2091353     
   Tags   Past Edits
Dec 15 2016 (9:32AM)
Station Tag: New Delhi/NDLS added by Saurabh*^~/15807

Dec 15 2016 (9:32AM)
Station Tag: Aligarh Junction/ALJN added by Saurabh*^~/15807

Dec 15 2016 (9:32AM)
Station Tag: Kanpur Central/CNB added by Saurabh*^~/15807

Dec 15 2016 (9:32AM)
Station Tag: Allahabad Junction/ALD added by Saurabh*^~/15807

Dec 15 2016 (9:32AM)
Train Tag: Prayagraj Express/12418 added by Saurabh*^~/15807

Dec 15 2016 (9:32AM)
Train Tag: Prayagraj Express/12417 added by Saurabh*^~/15807

Posted by: Saurabh*^~  3096 news posts
ALLAHABAD: Come December 18 and the passengers travelling to Delhi on Prayagraj express would get the comfort of Rajdhani express, with no extra cost, courtesy all new Prayagraj express that would start plying from the day.
At a time when the recent train accident at Pukhrayan, about 100 kms from Kanpur is fresh in memories, the new 'avatar' of this most popular and VIP train between Allahabad and Delhi would be fitted with the latest LHB (Linke Halffman Busch) coaches which would not overlap above each in case of accidents. These coaches are having the feature of anti-climbing system.
The
...
more...
longer, safer, and comfortable coaches of the new version of Prayagraj express are made of stainless steel. Moreover, the interiors would not be fitted with metallic fitting, considered as a major reason for injuries to the passengers after the mishap. The new interiors would be made of fiber.
Having the brail signage, for blind passengers, the air conditioner of new coaches of Prayagraj express will be far more effective as the train would have two power car which would run the AC's of the air-conditioned coaches.
The train would be having 22 coaches unlike the existing version which has 24 coaches. However, the proposal for two more sleeper coaches have been moved by the authorities. The seating capacity of the coaches would also be enhanced as new coaches of sleeper class would have 80 berths, an addition of 8 berth in each coaches, AC-III will also have 8 additional berth (72 from existing 64), AC-II will have 52 berth and AC-I will have 24 berths.
The coaches have been manufacture in the rail coach factory at Rai Bareilly and because of the lighter weight, they can run at a higher speed of upto 160 km/hr whereas it's existing speed is 110 km/hr. Along with the high speed, the new coaches will have more effective braking system; the coaches will have disk brakes as well.
Even on the high speed, the passengers would feel less jerk, both while stopping or starting and also while travelling.
The authorities have started the process for increasing the speed of the train upto 130 km/hr and the same could see the day of the light in the coming days.
Because of a decrease of two sleeper coaches in the new version, the total sitting capacity of sleeper coaches has come down by 64 berths despite the fact that these new sleeper coaches will have 8 more berths in each coaches.
The authorities have suggested that the passengers of sleeper coaches, travelling on or after December 18, should check the status of their reservation before starting their journey. "As the old coaches had 72 berths and there were 12 sleeper coaches, the total carrying capacity was 864 whereas now as we have 10 coaches (each having 80 berths) the total carrying capacity have come down to 800, a reduction of 64 seats", said railway PRO of Allahabad division, Sunil Kumar Gupta.

  
5641 views
Dec 15 2016 (09:35)
Saurabh*^~   8775 blog posts   3349 correct pred (73% accurate)
Re# 2091353-1            Tags   Past Edits
.

  
Dec 15 2016 (10:03)
Akshay gupta~   567 blog posts   4 correct pred (44% accurate)
Re# 2091353-2            Tags   Past Edits
hurrah!! my fav train finally getting LHBfied from 18th

  
5839 views
Dec 15 2016 (10:23)
dhirendra63   79 blog posts
Re# 2091353-3            Tags   Past Edits
"As the old coaches had 72 berths and there were 12 sleeper coaches, the total carrying capacity was 864 whereas now as we have 10 coaches (each having 80 berths) the total carrying capacity have come down to 800, a reduction of 64 seats"
Means Loss of revenue and what about 64 passengers which has been reserved.

  
5764 views
Dec 15 2016 (10:33)
I M BACK^~   1288 blog posts   6426 correct pred (87% accurate)
Re# 2091353-4            Tags   Past Edits
But in 3A and 2A extra Passenger can travel so in profit of revenue

  
5645 views
Dec 15 2016 (11:17)
Guest: 82594c91   show all posts
Re# 2091353-5            Tags   Past Edits
They will be most probably upgraded
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.