News Super Search
 ♦ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Search  
 
Sun Jul 23, 2017 16:38:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jul 23, 2017 16:38:49 IST
Advanced Search
Trains in the News    Stations in the News   
<<prev entry    next entry>>
News Entry# 288259
  
Dec 11 2016 (01:34)  CAC villagers skeptical of rail double tracking (timesofindia.indiatimes.com)
back to top
Commentary/Human InterestSWR/South Western  -  

News Entry# 288259   Blog Entry# 2087277     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: rdb*^  130870 news posts
CANSAULIM: The proposed double tracking of Colem-Vasco section by south-western railway (SWR) has drawn opposition from villagers of Cansaulim-Arossim-Cuelim (CAC) and adjoining villages, as the villagers have raised fears of severe impact and damage to their heritage houses.The non-provision of a pedestrian bridge at the Cansaulim railway station for decades is a violation of human rights, vice-president of CAC civic and consumer forum, Marconi Correia alleged.The railway runs close to the age-old St Lawrence Chapel at Arossim, built in 1599, while the heritage structures built circa 1754, prior to the laying of the railways, president Cansaulim villagers action committee Antonio D'Silva said.The railways carried dock labour and passengers from Colem to Mormugao harbour, but expansion proposed is for carrying coal and other materials, the villagers claimed.
Senior
...
more...
citizen Joao Barros Pereira said that the CAC and other villages are adorned with several heritage and residential houses. "These are priceless and cannot be replaced. Heritage houses are not only the villagers' pride, but belong to everyone in Goa," he said.
While maintaining the existing track or the proposed doubling of it, it would be prudent to consider a viable option, or it will be an insult to the local intelligence and disrespect to their rights, Pereira said.
Local resident Malisa Simoes demanded that railway authorities plan a station at Utorda instead of a loop near Velsao-Pale, to connect Konkan railway to SWR.
The village-level committee of CAC had suggested a tunnel connecting KR to SWR at Dabolim, connecting Dabolim airport, thus protecting the farmers and their fields. Late Matanhy Saldanha was a signatory to this suggestion, villagers said.

  
984 views
Dec 11 2016 (10:21)
rdb*^   31568 blog posts   381302 correct pred (81% accurate)
Re# 2087277-1            Tags   Past Edits
Ultimately doubling has to happen

  
1080 views
Dec 11 2016 (12:01)
Why not three languages in Aadhar~   4284 blog posts   324 correct pred (68% accurate)
Re# 2087277-2            Tags   Past Edits
People of Goa are opposing, and blame will come to SWR for delaying doubling and introduction of new trains
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.