Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

WAP-7 - तेरे जैसा यार कहाँ , कहाँ ऐसा याराना , याद करेगी दुनियां तेरा मेरा अफसाना. - Arjun Rai

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat May 28 19:33:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 475451
Jan 21 (13:18) City to see first of three-phase MEMU trains on January 26 (www.thehindu.com)
New Facilities/Technology
SR/Southern
0 Followers
9824 views

News Entry# 475451  Blog Entry# 5195686   
  Past Edits
Jan 21 2022 (13:18)
Station Tag: Mangaluru Central (Mangalore)/MAQ added by Gin bypass will save time for Ktgg Ypr Exp/48335
The 12-car ICF rake that will replace the conventional rake of Mangaluru Central- Kannur-Mangaluru Central Unreserved Express Special (Train Nos 06478 / 06477) soon. 
The city will see the first of its three-phase Mainline Electrical Multiple Unit (MEMU) trains with the Southern Railway replacing the conventional rake of Train Nos 06478/06477 Mangaluru Central-Kannur-Mangaluru Central Unreserved Express Special on January 26.
While MEMU coaches have more carrying capacity than conventional coaches, the main advantage will be that the rake does not require loco reversal as the motor car coaches on both the ends
...
more...
can move the rake on either direction. With Mangaluru Central being a dead-end station, loco reversal was mandatory and with a MEMU train, considerable operational time can now be saved.
A 12-coach MEMU with three motor cars and nine trailer cars propelled by three-phase AC system manufactured indigenously by the Integral Coach Factory, Chennai, will be deployed replacing the conventional rake of the train.
While each motor car can accommodate 55 sitting and 171 standing passengers, each trailer car will accommodate 84 sitting and 271 standing passengers. Thus, a 12-coach three-phase MEMU can accommodate 3,603 passengers, 921 sitting and 2,682 standing, in all. A conventional MEMU on the other hand, can carry 2,634 passengers, in all.
The steel body coaches with easy to slide, light-weight sliding doors and fibre reinforced polymer interior panels will also have CCTV surveillance system and LED lights. GPS-based passenger information system, public announcement system, bio-toilets in trailer cars are the other features. Cabins of the motormen and guard are air-conditioned. The three-phase MEMU rakes with insulated-gate bipolar transistor facilitates improved acceleration and braking performance even as the regenerative braking system can help save up to 35% of energy compared to conventional MEMUs. The electricity so generated will be fed back to the grid.
A 10.4 inch touch screen driver display unit in motor cars will provide information about Train Control and Monitoring System to help the motorman in operating the rake. Coaches are provided with air spring as secondary stage suspension and as a safety feature, DDU will indicate any failure to the motorman to restrict the train’s speed to 55 kmph.
Train No 06477 is scheduled to leave Kannur at 7.40 a.m. to reach Mangaluru Central at 10.55 a.m. In the return direction, Train No 06478 leaves Mangaluru Central at 5.05 p.m. to reach Kannur at 8.40 p.m. The evening service is largely patronised by students and the regular travellers.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy