Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Kolkata Local - আমি তোমাকে ভালবাসি

Full Site Search
  Full Site Search  
 
Fri Oct 30 07:43:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 419528
Sep 25 (20:23) Commissioner of Railway Safety conducts speed trial between Harlapur-Kariganuru Electrified section (twitter.com)
New Facilities/Technology
SWR/South Western
0 Followers
19489 views

News Entry# 419528  Blog Entry# 4725107   
  Past Edits
Sep 25 2020 (20:24)
Station Tag: Harlapur/RLP added by IRI Mera Jaan 😍😍/2086033

Sep 25 2020 (20:24)
Station Tag: Kariganuru/KGW added by IRI Mera Jaan 😍😍/2086033
Stations:  Kariganuru/KGW   Harlapur/RLP  
A.K. Rai, Commissioner of Railway Safety (CRS)/ Southern Circle, Bengaluru conducted inspection of 73 KM Kariganuru-Harlapur Electrified section and conducted Speed trial with Electric Loco from Harlapur to Kariganuru on 24.09.2020.
The work of Electrification between Ballari to Hubballi (209 KM) is being executed by Rail Vikas Nigam Limited. Earlier, the section Traction Sub Station (TSS) at Kariganuru to serve Electrification between Kariganuru and Harlapur was commissioned on 02.08.2020.With TSS commissioned at Kariganuru, section between Ballari to Harlapur (132 Km) became fully electrified and was due for CRS inspection.
CRS inspected Kariganuru Traction
...
more...
Substation, Sectioning Post (SP) between Munirabad-Ginigera, Sub Sectioning Posts (SSP) between Koppal-Ginigera and Bhanapur-Bannikoppa, Level Crossing gates between Koppal-Ginigera and Koppal-Bhanapur, Tungabhadra Bridge between Hosapete and Munirabad. He also inspected Koppal station, bridge and curve between Koppal-Bhanapur etc. After the inspection from Kariganuru to Harlapur, he conducted a Speed Trial with maximum speed upto 110 KMPH between Harlapur to Kariganuru.
After CRS authorizes to run Electric Loco, Passenger trains powered by Electrical Locomotives will start running in this section. Mobility of train services on the section will improve once Electric trains start running. In addition to reduction in pollution; economy and efficiency of Train operations will improve due to shift from traction of trains from Diesel to electricity. During the last financial year 197 Km of electrification was done in South Western Railway which includes Ballari-Tornagallu (34 km) Tornagallu – Ranjithpura (23 Km), Ballari-Rayadurg (53 Km), Rayadurg – Thalaku (48 Km) and Baiyyappanahalli – Anekal (34 Km).

Rail News
16195 views
Sep 25 (21:00)
sanjay07   951 blog posts
Re# 4725107-1            Tags   Past Edits
Good News

Rail News
11234 views
Sep 28 (13:27)
sriramgandur   78 blog posts
Re# 4725107-2            Tags   Past Edits
Good News, Bellary Hubbali which is in snail's pace.
In a year 197 KM electrification under SWR, is low accomplishment, may be corona has impacted.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy