Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Bihar Sampark Kranti - ECR Don ka ticket Confirm hona mushkil hi nahi, namumkin hai. - Somanko

Full Site Search
  Full Site Search  
 
Thu Sep 24 16:09:27 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 415693
Aug 03 (15:41) CONVERTING DISASTER INTO AN OPPORTUNITY W.RLY MADE MUMBAI READY FOR SMOOTH & SAFE TRAVEL BY COMPLETING CONSTRUCTION WORKS OF 3 FOBs, ONE SKYWALK & ONE ROB OVER MUMBAI SUBURBAN SECTION DURING LOCKDOWN (wr.indianrailways.gov.in)
Other News
WR/Western
IR Press Release
0 Followers
7518 views

News Entry# 415693  Blog Entry# 4680562   
  Past Edits
Aug 03 2020 (15:41)
Station Tag: Malad/MDD added by Forever Railfan/248735

Aug 03 2020 (15:41)
Station Tag: Jogeshwari/JOS added by Forever Railfan/248735

Aug 03 2020 (15:41)
Station Tag: Andheri/ADH added by Forever Railfan/248735
Stations:  Andheri/ADH   Malad/MDD   Jogeshwari/JOS  
While life came at a halt during the Coronavirus Pandemic Lockdown, Western Railway continued to progress with its various infrastructural developments. It is worthwhile to mention that by converting the adverse situation of DISASTER of global pandemic into an OPPORTUNITY, Western Railway has completed the construction works of 3 Foot Over Bridges (FOB), o­ne skywalk & repair of one Road Over Bridge (ROB) o­n the Mumbai Suburban section, making best use of the lockdown situation.
According to a press release issued by Shri Sumit Thakur - Chief Public Relations Officer of Western Railway, the construction work of the FOBs, skywalk & ROB completed during the lockdown are of the Andheri (South FOB), Andheri - Jogeshwari (North MCGM FOB), Marine Lines (North FOB),Malad
...
more...
(MCGM Skywalk) and Vasai Road- Nallasopara (Old ROB). The Andheri (South FOB) connects platforms 8/9, 6/7 and West side, measures 92 mtrs in length and 6 mtrs wide and was commissioned o­n 30th June, 2020. The Marine Lines (North FOB) connects platforms 1, 2, 3 & 4, measures 44 mtrs in length and 6 mtrs wide and was commissioned o­n 24th April, 2020. The Malad (MCGM Skywalk) connects MCGM FOB to the station, measures 141 mtrs in length and 6 mtrs wide which was commissioned o­n 9th May, 2020. The Vasai Road-Nallasopara (Old ROB) was repaired to provide a seamless east-west connectivity and measures 84.7 mtrs in length and 8 mtrs in width which was commissioned o­n 7th May, 2020.
Shri Thakur added that the latest commissioned project o­n 30th July, 2020 is the Andheri-Jogeshwari (North MCGM FOB). The work of the part of FOB connecting East side with MCGM skywalk going to metro station of Andheri station to West side at SV road through Masjid Galli at Andheri (West), has been completed by the unit of Deputy Chief Engineer, Construction(II), Churchgate, S & C of Western Railway. This FOB will be useful for public movement from Masjid area at east of Andheri to reach metro station of Andheri (West) and will also be useful for the 6th line project between Mumbai Central and Borivali stations.
The Andheri (North MCGM FOB) bridge is 40 m in length & 6.0 m width, crossing over all of the railway tracks and connecting East to West of Andheri. The work of FOB was started o­n 10th March, 2019 and was in completed o­n war footing during the lockdown to open for public to use. The major hurdle was to construct the foundation of the FOB between running lines and to shift the bunch of cables, location box, OHE mast and portal etc. Also, the approach for movement of hydraulic crane of 220 tonne capacity for launching of girders was not available, so approach was made over track from Andheri Subway to the location of site approx. 500 meter and launching of girder was done within granted block period and in limited area without any disturbance to adjacent Metro Bridge. The efforts of Western Railway to complete various infrastructure projects even with the limited available staff during the Coronavirus Pandemic lockdown is truly remarkable.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy