Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Sat May 21 02:45:27 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 476001
Jan 29 (01:08) CRS to inspect Andipatti - Theni stretch on Monday (www.thehindu.com)
IR Affairs
SR/Southern
0 Followers
12318 views

News Entry# 476001  Blog Entry# 5202780   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Teni/TENI  
Speed trial will be conducted between Theni and Andipatti between 2 p.m. and 6 p.m. on Monday. 
Commissioner of Railway Safety Abhai Kumar Rai will inspect electrification work on Manamadurai-Ramanathapuram stretch and the converted broad gauge stretch of Andipatti-Theni on January 30 and 31.
A railway statement said that electrification work had been carried out on the 107-km-long railway line between Madurai and Ramanathapuram. The electrification work on the 47-km Madurai - Manamadurai railway line had already been completed. After clearance by the Commissioner of Railway Safety, electric locomotives were currently hauling
...
more...
rakes in this section.
The electrification work for the 60-km-stretch between Manamadurai and Ramanathapuram had also been completed. The Manamadurai-Ramanathapuram electrified line would be inspected by the CRS on January 30. After the inspection, a speed trial would be conducted between Ramanathapuram and Manamadurai between 2 p.m. and 6 p.m. Public and residents in the vicinity had been cautioned not to cross or approach the track during the speed trial, the statement said.
Gauge conversion of Madurai-Bodinaickanur railway line had already been completed on the 58-km-stretch between Madurai and Andipatti in different phases and the stretch had been cleared by the CRS.
Now, gauge conversion on 17-km Andipatti – Theni section had been completed and the CRS would conduct statutory inspection of this section on January 31.
After the inspection, the CRS would conduct speed trial between Theni and Andipatti between 2 p.m. and 6 p.m.Public and residents in the vicinity are cautioned not to cross or approach the track during the speed trial, the statement said.
On completion of the remaining stretch of work between Theni and Bodi, the Southern Railway has proposed to run thrice-a-week express train between Bodi and Chennai.

Rail News
7493 views
Feb 02 (16:04)
mailtovms
SARAVANAS   2 blog posts
Re# 5202780-1            Tags   Past Edits
it was postponed
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy