Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Dec 14 06:07:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 370951
  
Dec 07 (11:31) ‘Suspension of train services on Pamban bridge, a precaution (www.thehindu.com)
IR Affairs
SR/Southern
0 Followers
1344 views

News Entry# 370951  Blog Entry# 4076241   
  Past Edits
Dec 07 2018 (11:31)
Station Tag: Rameswaram/RMM added by ⭐16105🔄16106 ⭐Chendur express ⭐✡~/1865201

Dec 07 2018 (11:31)
Station Tag: Mandapam/MMM added by ⭐16105🔄16106 ⭐Chendur express ⭐✡~/1865201

Dec 07 2018 (11:31)
Station Tag: Pamban/PBM added by ⭐16105🔄16106 ⭐Chendur express ⭐✡~/1865201
Stations:  Rameswaram/RMM   Mandapam/MMM   Pamban/PBM  
DRM says empty rakes are, however, taken on the bridge
Suspension of train services on Pamban rail bridge to reach Rameswaram was only a precautionary measure after a crack was found in one of the main members of the cantilever bridge. However, empty rakes of trains that were terminated at Mandapam station were being taken across the bridge to pit lines in Rameswaram for maintenance, said Divisional Railway Manager Neenu Ittyerah.
Members are iron structures that hold the Scherzer’s span. The member that developed crack was welded and repaired. Train services had been
...
more...
suspended to make it doubly sure that all other members were intact so that trains could be run safely. The railways wanted to check whether the strain of the cracked member had been shifted to others, she said.
The Chief Bridge Engineer of Southern Railway had decided to involve instrumentation to ensure the strength of each element in the bridge. Only after analysing the entire bridge, repair work, if necessary, could be taken up before allowing trains with passengers, she said.
Ms. Ittyerah said it was during a routine safety inspection that the crack was detected. The century-old Scherzer’s span of the bridge had been strengthened over the years. “The plan to replace it is in an advanced stage,” the DRM said.
As of now, the railways had made arrangements for transporting passengers between Rameswaram and Mandapam railway stations by road. Over 2,000 persons were ferried by railway officials on Wednesday, she said.
Basic infrastructure at Mandapam was being temporarily augmented to meet the requirements of a large number of passengers. Additional facilities for issuing tickets were being made, she added.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy