Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Kamayani Express - Late आना है काम तुम्हारा लेकिन मैं फिर भी हूँ तुम्हारा दीवाना - Aman

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Tue Sep 27 03:10:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 495356
Aug 17 (23:39) Rajdhani, Shatabdi, Duronto soon to be part of history (www.thestatesman.com)
IR Affairs
NR/Northern
0 Followers
10795 views

News Entry# 495356  Blog Entry# 5452815   
  Past Edits
Aug 18 2022 (12:16)
Station Tag: New Delhi/NDLS added by Mission Sri Jagannath Puri Srinagar JK🙏🇮🇳/1421836
Stations:  New Delhi/NDLS  
Railways has decided to phase out the premium trains and has made an ambitious roadmap to run semi-high speed trains (160-240 kmph) Vande Bharat in their place.
Anjali Bhatia | New Delhi | August 17, 2022 8:37 pm
Trains running across the country like premium Rajdhani Express, Shatabdi Express, Duronto, etc. will become a thing of the past as the Indian Railways has decided to
...
more...
phase out the premium trains, The Railways has made an ambitious roadmap to run semi-high speed trains (160-240 kmph) Vande Bharat and train sets.
The Railways claims that in the next two years, semi-high speed trains between Delhi-Mumbai and Delhi-Kolkata will start filling whereas the target is to connect other metros and big cities of the country in the Amrit period.
A senior Railway Ministry official said that the electricity, signaling system, track, rolling stock (engine-coach) of Indian Railways will need to be completely replaced to run semi-high speed trains. To make rail travel fast, a comfortable and safe state-of-the-art technology in railroad facing and train operation will have to be implemented.
He said ICF and LHB coaches have become old technology now. For this, Rajdhani, Shatabdi, Duronto and Superfast trains will be replaced by Vande Bharat Express and train sets equipped with new state-of-the-art technology. These trains are capable of running at a speed of 160 to 260 kmph. The Railways will make 524 Vande Bharat and train sets.
The government is going to invest more than 40,000 crore rupees on the project. 75 Vande Bharat will be ready on 15 August 2023. The official said that the existing two Vande Bharat trains are running at a speed of 160 kmph while the new Vande Bharat train will run at a speed of 180 kmph. After this, new versions of Vande Bharat with a maximum speed of 200, 220, 240 and 260 kmph will be made in a phased manner. He said that with each new version, the speed, technical and rail passenger amenities of Vande Bharat trains will increase.
Work has started on several fronts for running the semi-high speed trains at a speed of 180-200 kmph on Delhi-Howrah and Delhi-Kolkata rail routes. Upgradation of tracks on both the routes is being done, fast modes are being repaired and facing work is going on in populated areas. Apart from this, the bridges and culverts are being strengthened.
For this, Rs 18,000 crore has already been approved. It is to be noted here that both the above railway routes are the busiest routes in the country. And there is a huge crowd of rail passengers in trains throughout the year. Running of semi-high speed trains will reduce congestion on railways, trains will not be late and will reach on time. This will shorten the waiting list in trains.
In order to run semi-high speed trains, the Railways is implementing a Cab Signaling System instead of the old signaling system. In this, the train driver does not need to see the signal on the side of the track. The signaling system of the railroad is available on the screen in the engine cab seeing which the drivers drive the train. Cab signaling is available in Kavach technology of the Railways. Be aware that the Kavach technology employs automatic brakes when trains running at full speed come face to face. The shield prevents a collision from the rear of the trains. The official said that Rs 10,000 crore has been approved for installation of Kavach technology on Delhi-Howrah and Delhi-Mumbai rail routes. Tender is in final stage.
World-class electrification is required to run 524 cm high speed Vande Bharat trains. As semi-high speed Vande Bharat trains draw more power, the existing electrification of the Railways is not suitable and due to this complaints of tripping are being received frequently. In view of this, the Railway Board has started the work of laying high capacity power lines (2 x 25) all over the Indian Railways including the 1650 track kilometer section of Delhi-Mughalsarai which will provide sufficient power to trains running at a speed of 260 kmph in future.

Rail News
9931 views
Aug 17 (23:49)
SG Railfan JBP IND
SGRFC   594 blog posts
Re# 5452815-1              
लगता है अब सभी लोको पुल ट्रेनों को लोको रहित ट्रेनों से replace हो जाएगा । और प्रीमियम ट्रेनें वंदे भारत एक्सप्रेस से रिप्लेस होगा।
मतलब
Generation by Generation
Steam---Diesel----Electric----Engineless
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy