Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Champaran HumSafar Express : इन अजनबी सी राहों में, जो तू मेरा हमसफ़र हो जाये, बीत जाए पल भर में ये वक़्त, और हसीन सफ़र हो जाये. - Piyush Singh

Full Site Search
  Full Site Search  
 
Mon Apr 6 10:43:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 401976
  
Feb 27 (16:24) Metro Rail connectivity to Hyderabad airport to take shape soon (www.railnews.in)
Metro
HM/Hyderabad Metro
0 Followers
1487 views

News Entry# 401976  Blog Entry# 4578120   
  Past Edits
This is a new feature showing past edits to this News Post.
Metro Rail connectivity to Hyderabad airport to take shape soon
26 Feb 2020 in Category(ies): Posted on Categories Hyderabad Metro, Metro Rail Systems
HMRL proposing plans to reduce congestion by increasing the speed of metro trains and adding short-loop trips with extra trains.
HYDERABAD: HYDERABAD: City commuters would soon get a 62-km-long metro route that would connect different parts of the city
...
more...
with Rajiv Gandhi International Airport (RGIA) if the State government approves the Detailed Project Report (DPR) for the Phase II submitted by the Hyderabad Metro Rail Limited. However, the Old City has not yet found a spot in the proposed Phase II project.
The Hyderabad Metro Rail Limited (HMRL) has also been proposing plans to reduce congestion by increasing the speed of metro trains and adding short-loop trips with extra trains. The HMRL also wants to make travel outside the metro women-friendly, and therefore would soon launch free lounges near metro stations.
Speaking to mediapersons here on Tuesday, HMRL managing director NVS Reddy said, “The Hyderabad Metro is recording over four lakh passenger trips every day. As many as 1,000 trips are completed by 55 of the three coached trains. If the government approves the DPR that has been submitted to it, then three lines will be a part of this phase.”
Short-looped trains to be added
Elaborating on Phase II work, Reddy said,“The first line will connect Raidurg station with RGIA via Nanakramguda. This will be a 31 km stretch. The second line will connect Miyapur to BHEL via Mehdipatnam and Hafeezpet. This stretch will be close to 26 km. The last line will be a 5 km stretch connecting Nagole to LB Nagar.”
Regarding the much-requested Metro line to cover Old City, the MD chose to stay tight-lipped. “The Chief Minister definitely wants to connect the Old City with Metro. However, we are yet to figure out the route as there are religious structures on the route that is making this a sensitive matter,” he said.
On the rising congestion in Metro trains, Reddy said, “We have noticed that the station from Ameerpet to Raidurg has the heaviest congestion. Therefore, we will increase the speed of the trains beyond Jubilee Hills Road No 5 station. As the route has multiple curves, we have sought permission from the Commissioner of Metro Railway Safety (CMRS) for the same, which we should get soon. The speed will be increased by the end of August this year and we will also add short-loop trains.”
When asked about the HMRL using space on the sidewalks for building commercial kiosks near Hitec City Metro station, Reddy said, “The sidewalks were built by the HMRL in the first place. We are building free lounges so that encroachment of the sidewalks does not happen. We will soon inaugurate these free lounges. This will be a place for people to rest and use facilities like WiFi. We are creating this especially for women, to make travel safe for them in the city.”
Demand for Nagole-LB Nagar-Karmanghat-Balapur-Pahadi Shareef-RGIA Airport gaining momendum
While the on going talks and proposals for Metro Rail line extension from Raidurg to Shamshabad are in the stages of approvals, there is also a persistent demand that Metro Rail line from Nagole needs to be extended to Rajiv Gandhi International Airport via LB Nagar-Karmanghat-Balapur-Pahadi Shareef. There is a good justification for this demand since the traffic on this route towards Airport had gone up in the recent past via Nagole/LB Nagar/Balapur, with more than 1800 Cabs plying to Airport on daily basis. Ola and Uber operators confirmed that the demand is increasing at the rate of 18% every month on these routes.
Nagole-RGIA Metro Rail line Sadhana Samithi was recently formed to fight for the cause of achieving Metro Rail to Airport with more than 28,000 members registering for the demand of new Metro Rail line to Airport from Nagole via. LB Nagar-Balapur. In fact, in the recent past, the population influx towards Nagole, LB Nagar, Karmanghat, Balapur, Badangpet and beyond have drastically seen upward trend and the real estate business in these localities have picked up sharply with heavy demand. Apart from the same, it is also pertinent to mention that more than 1,28,000 passengers travel to Andhra Pradesh from L.B.Nagar on daily basis.
Need to see whether the concerned authorities will take stock of the demand and call for the feasibility study, alignment design and detailed project report for the same for the financial modelling of the metro rail on this stretch.
Facebooktwittergoogle_plusredditpinterestlinkedinmail
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy