Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Full Site Search  
 
Mon Dec 10 03:59:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 370932
  
Dec 07 (00:25) Quick watering system to ensure adequate water supply in trains (www.theweekendleader.com)
0 Followers
1305 views

News Entry# 370932  Blog Entry# 4075291   
  Past Edits
This is a new feature showing past edits to this News Post.
Come March 2019 and the passengers of mail or express trains won't complain of water shortage in the coaches, as the Indian Railways is all set to use "quick watering system" to fill water, an official said on Thursday.
The Railway Board Member - Rolling Stock, Rajesh Agarwal, said the Indian Railways used to receive a lot of complaints related to water shortage in the train coaches. 
"But with the use of quick watering system, a 24-coach train can be filled up within five minutes and multiple trains can be watered simultaneously," he
...
more...
said.
Highlighting the functionality of the new system, Agarwal said that earlier the water in the train coaches at railway stations were filled with the help of four-inch pipes.
"But those four inch pipes would now be replaced with six inch pipes with high power motors and the water would be supplied to the train coaches through a computerised system called SCADA (Supervisory Control and Data Acquisition)," he said.
He said that the quick watering system uses a powerful motor and a centralised monitoring system with flow meters which can also check exactly how much water is being filled into the tanks thereby reducing wastage.
Agarwal said that the Railway Ministry has planned to install pressure pumps of 40 horsepower to increase water pressure, so that trains can refill water in five minutes. 
He said that by March 2019, this system would be installed at over 142 stations which have the water filling stations in trains. Recently the rail board sanctioned Rs 300 crore for the project. 
He said that the Ministry has planned to install pumps of 40 horsepower to increase the water pressure.
According to Railway Ministry officials, the water in the long-distance trains are filled at every 200 km. But as the old pipeline did not provide adequate pressure, it took around 20-25 minutes to fill 1,800 liters of water in a coach, resulting in inadequate filling of water in the train coaches.
The official said at present, railway staff fix hose pipes from their water line to the inlet of coaches and fill tanks. The speed of a regular pumping system is comparatively slow, resulting in lesser water being filled in the coaches. 
The official noted that the quick watering system was developed by the Research and Design Standrads Organisation (RDSO)'s CAMTECH, Gwalior unit. Through an open tender, the contract will be given to the local contractors, the Ministry said.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy