Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Mangala Lakshadweep: meri raah tujhse, meri chaah tujhse; mujhe bas yahin reh jaana - Kirti Solanki

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Tue Sep 28 04:40:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 461027
Aug 04 (08:22) UPMRC Starts Third Rail Installation Work in Priority Corridor; MD Shri Keshav Praises The Team Effort. (www.metrorailnews.in)
Metro
UPMRCL/Kanpur Metro
0 Followers
5560 views

News Entry# 461027  Blog Entry# 5032529   
  Past Edits
Aug 04 2021 (08:22)
Station Tag: Kanpur Central/CNB added by Prakhar Yadav/622971
Stations:  Kanpur Central/CNB  
Kanpur, (Metro Rail News):—Third Rail System has advantages of low maintenance and better aesthetics as compared to the Overhead Electrification System.
Uttar Pradesh Metro Rail Corporation Ltd. (UPMRC) has started the installation process of the Third Rail System in the Priority Corridor of the Kanpur Metro Rail Project i.e. being built between IIT & Motijhel. After a Pooja Ceremony, Metro engineers have started the installation of Third Rail System equipment at the Polytechnic Depot and the commissioning process of Power Transformers at the 220 kV Receiving Sub-Station (RSS) located in Lakhanpur.
Congratulating the
...
more...
Metro team on the achievement, UPMRC’s MD Shri Kumar Keshav said, “Whole Traction team is leaving no stone unturned to achieve the set target and while moving rapidly with the installation of various systems including signalling, telecom, track & electrical, we are heading towards the target of trial run on the Priority Corridor in November this year, with full positivity. Owing to the dedication of Metro engineers, UPMRC will always be remembered for its hard work and commitment. ”
Third Rail Traction System & Its Advantages:
—Kanpur Metro Project is going to have a 750 Volt DC Third Rail Traction System for the operations of Rolling Stocks/Metro Trains. Metro Train operations will be facilitated with the electric supply through the third rail which will be laid parallel to the Metro track.
—Third Rail system has the advantage of low maintenance as unnecessary tripping of electric supply can be avoided that usually happens because of kite-flying.
—This system also allows for maintaining a better aesthetic of the city’s infrastructure as no set-up of wires gets visible to the public.
Public Relations DepartmentUttar Pradesh Metro Rail Corporation Limited
RELATED ARTICLESMORE FROM AUTHOR
18.46 lakh passengers travelled in Chennai Metro Trains in July, 2021
Tenders invited for Ballestless Track work on Line-6 of Mumbai Metro
Mumbai Metro Rail Corporation collaborates with Bahwan CyberTek to accelerate their digital transformation journey
LEAVE A REPLY Cancel reply
Save my name, email, and website in this browser for the next time I comment.

This site uses Akismet to reduce spam. Learn how your comment data is processed.
RECENT UPDATES
MOST READ
Why Rs 1,126 crore contract to Shanghai Tunnel Engineering Co, a...
J Kumar Infra bags Rs 1998 cr contract for Mumbai Metro...
Metroman says DMRC ready with design to rebuild flyover
DMRC recruitment 2019: Applications invited for Managers and Consultant
Hyderabad metro on a tricky track, running on losses
Follow us on LinkedIn
EDITOR PICKS
Safety check conducted for PCMC-Dapodi section on Line-1 of Pune Metro
Noida Metro Extension Line stations to have commercial space to boost...
Know all about Bengaluru Suburban Rail Project
POPULAR POSTS
Why Rs 1,126 crore contract to Shanghai Tunnel Engineering Co, a...
J Kumar Infra bags Rs 1998 cr contract for Mumbai Metro...
Metroman says DMRC ready with design to rebuild flyover
POPULAR CATEGORY
Privacy Overview
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
Maharashtra: Metro’s second tunnel boring machine reaches Budhwar Peth station site
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy