Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Tamil Nadu Express - எங்கள் உயிர் துடிப்பு - Vijay Baradwaj

Full Site Search
  Full Site Search  
 
Sun Aug 9 15:20:27 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 413851
Jul 11 (16:33) Vande Bharat Express: No Chinese Train 18! Indian Railways likely to scrap CRRC bid in semi-high speed project (www.financialexpress.com)
IR Affairs
0 Followers
3083 views

News Entry# 413851  Blog Entry# 4666625   
  Past Edits
This is a new feature showing past edits to this News Post.
No to Chinese participation in Vande Bharat Express trains! Piyush Goyal-led Railway Ministry is likely to scrap the bid of a Chinese Joint Venture firm for 44 semi-high speed train sets project, learns Financial Express Online.
No Chinese participation in Vande Bharat Express trains! Piyush Goyal-led Railway Ministry is likely to scrap the bid of a Chinese Joint Venture firm for 44 semi-high speed train sets project, learns Financial Express Online. Chinese state-owned CRRC Corporation has emerged as the only foreign bidder in the tender that has been floated by the Integral Coach Factory (ICF), Chennai. In total, there are six contenders, which include Bharat Heavy Electricals, Electrowaves Electronic, Mumbai-based Powernetics Equipments and Hyderabad-based Medha Group.
Sources
...
more...
told Financial Express Online that the bid by China’s CRRC is expected to be scrapped based on a clause in Department of Industrial Policy and Promotion’s ‘Make in India’ policy. “If a Nodal Ministry is satisfied that Indian suppliers of an item are not allowed to participate and/or compete in procurement by any foreign government, it may, if it deems appropriate, restrict or exclude bidders from that country from eligibility for procurement of that item and/or other items relating to that Nodal Ministry,” the clause in Public Procurement (Preference to Make in India), Order 2017 reads.
According to the policy the bidder may be considered from a country based on several criteria, one of which is – “a majority of its shareholding or effective control of the entity is exercised from that country”. CRRC Pioneer Electric (India), is a joint venture of CRRC Corporation and a Gurugram-based company according to its website.
Chinese state-owned CRRC Corporation has emerged as a contender for the tender for procuring propulsion systems. According to officials quoted in a PTI report, the present tender for 44 Vande Bharat Express (Train 18) trains sets project would be worth over an amount of Rs 1,500 crore. This is considering that the first Vande Bharat Express, which was launched last year at a cost of Rs 100 crore has a Rs 35 crore propulsion system component. This current tender for the project was floated last year on December 22, and was opened on Friday. This tender is the third such tender, which has been floated for these ‘Make in India’ trains. The tender that was floated was for the supply of electrical equipment along with other items for 44 Vande Bharat Express train sets, each consisting of 16 coaches.
According to the report, the first tender was for as many as 43 sets. The second tender was floated for a total of 37 Train-18 propulsion systems. However, this was cancelled. Surprisingly, major firms such as Mitsubishi, Alstom, CAF, Siemens, Bombardier, and Talgo did not participate in the bids.
Following a standoff with China, a Rs 471-crore signalling and telecommunication work contract for a 417-km stretch on the Kanpur-Deen Dayal Upadhyay section by a Chinese firm was cancelled by Indian Railways. The national transporter also scrapped a tender for the thermal screening cameras after vendors from India complained of the bid document, which according to them was favouring the Chinese.
According to officials, it might take at least two-and-a-half years to manufacture the next Vande Bharat Express. Thus, there is likely to be a delay in the target set by Railway Minister Piyush Goyal who aimed to produce 160 coaches in the year 2019-20, as many as 240 coaches in the year 2020-21 and 240 number of coaches in the year 2021-22 at the ICF, Chennai.
The coaches of the upcoming Train-18 train sets will be of Chair Car type, specially designed for day travel. These trains will also offer various other facilities like CCTVs, automatic plug doors with retractable footsteps, in-coach displays, speakers, mobile/laptop charging sockets, modular pantry equipment, GPS antenna, luggage racks with reading lamps, etc.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy