Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 23, 2018 12:17:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 23, 2018 12:17:28 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1221959-0
Details Edit
Platform Pic; Large Station Board;
Entry# 2386258-0


ADTL/Adhartal (2 PFs)
     अधारताल

Track: Construction - Double-Line Electrification

Adhartal, Jabalpur
State: Madhya Pradesh

Elevation: 391 m above sea level
Zone: WCR/West Central   Division: Jabalpur
 
 

No Recent News for ADTL/Adhartal
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 12
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.8/5 (6 votes)
cleanliness - good (2)
porters/escalators - n/a (0)
food - n/a (0)
transportation - good (1)
lodging - n/a (0)
railfanning - excellent (2)
sightseeing - n/a (0)
safety - poor (1)

Nearby Stations

JBP/Jabalpur Junction 8 km     DOE/Deori 9 km     HBG/Howbagh Jabalpur 10 km     MML/Madan Mahal 11 km     KEQ/Kachhpura 14 km     GSPR/Gosalpur 19 km     BRGT/Bheraghat 25 km     GRG/Gwarighat 29 km     SHR/Sihora Road 30 km     JPV/Jamtara Paraswara 33 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 18 blog entries  next>>
  
★★  Info Update
0 Followers
3455 views
Jul 22 2017 (19:18)   JBP/Jabalpur Junction (6 PFs)

rohilbhakt100~   43 blog posts   17 correct pred (63% accurate)
Entry# 2360107            Tags   Past Edits
Electrification status near Jabalpur.
Itarsi-Allahabad Electrification is in great swing and foundations for masts have been dug up till JBP yard from either sides. Meanwhile masts have been laid out between ADTL and JBP in most of the places, masts from ET side can be seen only after Kachpura.

  
3286 views
Jul 22 2017 (21:28)
King in the North~   3001 blog posts   84 correct pred (68% accurate)
Re# 2360107-1            Tags   Past Edits
Can you please tell us the location of each pic?

  
3255 views
Jul 22 2017 (21:54)
rohilbhakt100~   43 blog posts   17 correct pred (63% accurate)
Re# 2360107-2            Tags   Past Edits
The first pic is of Adhartal Railway Station, second and third of Maharajpur LC near Adhartal and the last one is at VFJ estate between Adhartal and Jabalpur.

  
3218 views
Jul 23 2017 (01:50)
King in the North~   3001 blog posts   84 correct pred (68% accurate)
Re# 2360107-3            Tags   Past Edits
Good work done on JBP-KTE side.
  
★  General Travel
0 Followers
2274 views
Sep 15 2017 (11:01)   11266/Ambikapur - Jabalpur Intercity Express | ADTL/Adhartal (2 PFs)

arydolly001~   1112 blog posts
Entry# 2408869            Tags   Past Edits
#jbp
11266/Abkp - Jbp Intercity Express skip Adhartal

  
2138 views
Sep 15 2017 (15:17)
WAP7 at JBP ofclyGolden day~   3990 blog posts   44 correct pred (50% accurate)
Re# 2408869-1            Tags   Past Edits
#JBPKTEELECTRIFICATIONUPDATES
#OHEHOLESDIGGINGATJBP
video is awesome and this video shows the ongoing electrification works b/w adhartal to JBP station and it seems work of efication is going on at good pace in adhartal but near JBP still work of digging holes for OHE poles are going on and in many places OHE poles is being fitted also in adhartal and after adhartal but none after satpula bridge and after satpula bridge work of digging holes is going on and some holes are being concreted and no signs of efication work is seen
...
more...
in JBP yard but may be work of digging holes will be going on later we can hope to see OHE poles in the coming months in JBP yard and station also
  
★  Rail Fanning
0 Followers
12979 views
Sep 14 2016 (12:48)   51701/Jabalpur - Rewa Passenger | BSB/Varanasi Junction (9 PFs) | ET/WDP-4D/40214
 

धनबाद मंडल की सोच कोयले से भी काली*^~   5901 blog posts   9813 correct pred (74% accurate)
Entry# 1991199            Tags   Past Edits
Few locos captured with with our National Flag on it .
1 - Katni WDM-3D waiting to be copuled with 22182 NZM-JBP SF at Katni yard
2- Itarsi WDP-4D with JBP-REWA Passenger at Adhartal
3- Raipur WDG-3A twins with frieght accompanied with WDG4 Kazipet at Karaila Road JN .
4-
...
more...
BKSC WDM-3A twins hauling 12874 JSJ SF Exp , X-ing my sgrl-bsb intercity at Lusa .
5- CNB WAG-7 hauling Bsb-Ranchi intercity nearby kashi station
6- Gonda WDM-3A shunting at Varanasi Yard .
Clicked a month ago :-p

  
12715 views
Sep 14 2016 (12:57)
The Rail Mail™*^~   48175 blog posts   18572 correct pred (69% accurate)
Re# 1991199-1            Tags   Past Edits
missing patratu in this post :(

  
12701 views
Sep 14 2016 (13:04)
धनबाद मंडल की सोच कोयले से भी काली*^~   5901 blog posts   9813 correct pred (74% accurate)
Re# 1991199-2            Tags   Past Edits
Abhi patratu wale par flag nahi laga hai . Bina flag wala hai baahut saara .
yeh lo 2 go patratu wala

  
12510 views
Sep 14 2016 (17:48)
King in the North~   3001 blog posts   84 correct pred (68% accurate)
Re# 1991199-3            Tags   Past Edits
Have you been near JBP lately? What is the status of electrification?
  
General Travel
0 Followers
1160 views
Aug 21 2017 (11:31)   ADTL/Adhartal (2 PFs)

Udaipur Mysore HumSafar superfast^~   88570 blog posts   5328 correct pred (78% accurate)
Entry# 2386258            Tags   Past Edits
  
★  General Travel
0 Followers
1593 views
Aug 14 2017 (15:20)   02913/Bandra Terminus - Patna Humsafar Inaugural Special | ADTL/Adhartal (2 PFs) | GD/WDM-3A/14115

rohilbhakt100~   43 blog posts   17 correct pred (63% accurate)
Entry# 2380116            Tags   Past Edits
02913 Bandra Patna Inaugural Humsafar Express skips Adhartal furiously and then negotiates a Curve..!!
P.S.- Electrification Update- Masts cam be seen planted on both sides from the station. Only the middle portion of the station remains bare.

  
1505 views
Aug 14 2017 (15:28)
King in the North~   3001 blog posts   84 correct pred (68% accurate)
Re# 2380116-1            Tags   Past Edits
Abhishek bhai yesterday gave the update that JBP-KTE OHE is installed completely on the down line.

  
1439 views
Aug 14 2017 (16:21)
rohilbhakt100~   43 blog posts   17 correct pred (63% accurate)
Re# 2380116-2            Tags   Past Edits
Not completely...masts are laid out in most stretches but wiring needs to be done
Page#    Showing 1 to 5 of 18 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.