Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 04:17:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 04:17:09 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 982978-0
Details Edit
Large Station Board;
Entry# 982989-0
Details Edit
Large Station Board;
Entry# 1636342-0
Details Edit
Front Entrance - Outside;
Entry# 1636342-0

BIDR/Bidar (3 PFs)
ಬೀದರ/بیدر     बीदर

Track: Single Diesel-Line

Railway Station Road,Nandi Colony,SH 15,Ph No-08482 226404,Bidar
State: Karnataka

Elevation: 674 m above sea level
Zone: SCR/South Central   Division: Secunderabad
No Recent News for BIDR/Bidar
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 18
Number of Originating Trains: 10
Number of Terminating Trains: 10
Rating: 4.8/5 (32 votes)
cleanliness - excellent (4)
porters/escalators - excellent (4)
food - good (4)
transportation - excellent (4)
lodging - excellent (4)
railfanning - excellent (4)
sightseeing - excellent (4)
safety - excellent (4)

Nearby Stations

CHTT/Chitta 13 km     KHNP/Khanapur Deccan Junction 15 km     MTV/Matalkunta 19 km     HBU/Halbarga 23 km     KNAG/Kanaji 24 km     ZB/Zahirabad 32 km     HLKH/Hallikhed 33 km     BHLK/Bhalki 38 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 103 blog entries  next>>
  
★★★  General Travel
0 Followers
4871 views
May 26 2017 (11:41)   GR/Gulbarga (4 PFs)

skumarvkulkarni~   1695 blog posts
Entry# 2293605            Tags   Past Edits
Updates on Bidar Gulbarga New line at Sultanpur Station(Outskirts of Gulbarga)
- All platform works completed with FUB..
- LED lights are shining
- Huge Goods shed is almost ready( the existing Gulbarga station Goods shed will be shifted to Sultanpur Station soon)
-
...
more...
Once the Goods shed at Gulbarga is shifted to Sultanpur station(outskirts of gulbarga on Bidar line), there will be some space for stabling lines at GR station
- Sultanpur station looks to have 3 platforms (the third one may be used for Goods stabling)
- Overall works looks excellent as usual nothing to mention since its SCR line!

3 posts - Fri May 26, 2017

2 posts - Sun May 28, 2017

14 posts - Mon May 29, 2017

1 posts - Tue May 30, 2017

  
1892 views
May 30 2017 (13:31)
यन्त्रविन्यासYantravinyas   19811 blog posts   427 correct pred (89% accurate)
Re# 2293605-21            Tags   Past Edits
1 compliments
😂😂😂😂
hahaha lol
SWR is much better than SCR

  
1873 views
May 30 2017 (13:33)
12752   1517 blog posts   10 correct pred (75% accurate)
Re# 2293605-22            Tags   Past Edits
I guess you are mistaken about sir...he asked us to refer ECOR and compare as ECOR is best ...he is asking why comparing with SWR and saying SCR is best...compare with ECOR and then speak about SCR whether its best or need to improve alot...

  
1841 views
May 30 2017 (13:55)
kruf2014   46 blog posts
Re# 2293605-23            Tags   Past Edits
not till GR outer..
Gulbarga to Khanapur (excluding)

  
1885 views
May 30 2017 (13:58)
Hx Bza Penna Express~   380 blog posts
Re# 2293605-24            Tags   Past Edits
Can u please show me single blog where I cry on ECoR and also my double standard Plz...refer all of my blogs and show me plz ...

  
1920 views
May 30 2017 (14:00)
utkal andhra~   785 blog posts
Re# 2293605-25            Tags   Past Edits
Mallikarjun Khadge should be remembered on that occasion.Credit should go to him .But I don't think so.
  
★  General Travel
1 Followers
3232 views
Jun 13 2017 (16:34)   NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   309 blog posts   1 correct pred (50% accurate)
Entry# 2318700            Tags   Past Edits
#GoodNews

3 posts - Tue Jun 13, 2017

2 posts - Wed Jun 14, 2017

  
2372 views
Jun 15 2017 (12:02)
jazzradio   27 blog posts
Re# 2318700-6            Tags   Past Edits
Rizwan, the proposed atlas is going to be like this

  
2288 views
Jun 15 2017 (18:57)
Rizwan NZB Jn~   309 blog posts   1 correct pred (50% accurate)
Re# 2318700-7            Tags   Past Edits
Really ? This will take ages to complete.

  
2186 views
Jun 15 2017 (23:51)
jazzradio   27 blog posts
Re# 2318700-8            Tags   Past Edits
Yes Rizwan, may be 10-15 years down the line, all of these lines would be completed, it will give a big boost to these areas.

  
2081 views
Jun 16 2017 (10:01)
AurngabadPurnaAkolaNagpur~   736 blog posts   1 correct pred (20% accurate)
Re# 2318700-9            Tags   Past Edits
निज़ामाबाद से करीमनगर पर एक्सप्रेस कब चालू होगी नगरसोल-नरसापुर को करीमनगर से करनेवाले है ऐसा सुनने में आया था
निज़ामाबाद-मुंबई डेली करके एलोरा एक्सप्रेस नाम करने वाले थे कोई प्रोग्रेस इस बारे में

  
2039 views
Jun 16 2017 (13:40)
Kumarpatel   13 blog posts
Re# 2318700-10            Tags   Past Edits
Please extend Nanded Bikaner weekly up to Nizamabad
  
★★  General Travel
0 Followers
2239 views
Jun 06 2017 (10:18)   GR/Gulbarga (4 PFs)

skumarvkulkarni~   1695 blog posts
Entry# 2308821            Tags   Past Edits
Updates on Bidar-Gulbarga new line... all station works on verge of completion Like Taj Sultanpur, Kamalapur, Mahagoan etc..
Below are some clicks of Kamalapur station and Martuggi tunnel. It may take another 4 months for all works to be done including tunnel. Hopefully by this year end trains will chug!! CRS is already done from Gulbarga to Kamalapur station. Now Kamalapur till Humnabad CRS is pending which would be done after tunnel works completion.

  
2039 views
Jun 06 2017 (14:05)
Jay Maharashtra~   388 blog posts   16 correct pred (83% accurate)
Re# 2308821-1            Tags   Past Edits
Good Working Progesss Pic Bhai...

  
1917 views
Jun 06 2017 (16:58)
skumarvkulkarni~   1695 blog posts
Re# 2308821-2            Tags   Past Edits
Thank you!! :-)
  
General Travel
0 Followers
5323 views
Jun 05 2017 (12:44)   11045/Deekshabhoomi Express | LUR/Latur (2 PFs)

jazzradio   27 blog posts
Entry# 2307990            Tags   Past Edits
A nice editorial en lighting the rail projects in Marathwada region.

  
4313 views
Jun 07 2017 (20:09)
Rizwan NZB Jn~   309 blog posts   1 correct pred (50% accurate)
Re# 2307990-1            Tags   Past Edits
Can you please partly translate this into Hindi or English ?

  
4332 views
Jun 08 2017 (15:51)
jazzradio   27 blog posts
Re# 2307990-2            Tags   Past Edits
The editorial has highlighted many points as far as rail routes in Marathwada region are concerned.
- Start a new train from Parli to Mumbai via Latur, Osmanabad
- Kolhapur- Delhi to be diverted via Latur, Purna, Akola
- Patna- Purna train to be extended till Kurduwadi
-
...
more...
Sriganganagar-Nanded express to be extended till Kurduwadi
- Parli- Purna express halts for 17 Hrs, if it can be extended till Solapur or Bidar, it would be a great relief for the passengers.
- There's a need to extend Adilabad- Parli train till Osmanabad
- Currently Kolhapur- Dhanbad goes via Pune- Nagar- Manmad- Aurangabad- Parbhani- Nanded- Nagpur, if it's diverted via Kurduwadi- Latur- Latur Road- Parli- Parbhani- Nanded- Nagpur, it will save approx 300 KM distance.
- There are 10 trains for Mumbai- Hyderabad via Solapur, if a couple of them can be diverted via Latur- Bidar route it would be great relief for the underdeveloped South Marathwada region.
- Similarly Kurla- Bidar runs only once a week, if it's regularized, there's no need to extend current Mumbai- Latur express till Bidar.
- Nanded- Kurla & Hyderabad- Latur- Osmanabad- Pune trains be run daily
- Demand for construction of a new BG line between Ghatnandur & Ambajogai in Beed district.
- Solapur- Jalgaon route's survey is completed and need funds allocation, so that it can help Tuljapur, Osmanabad, Beed, Jalna regions
- Demand of survey between Latur Road- Jalkot- Bodhan
- Demand for constructing a new BG line between Latur Road- Nanded as it's awaiting funds.
- Demand of survey between Latur - Gulbarga
- Kurduwadi- Latur Road line be doubled & electrified as per budget asap.
- A new BG line be constructed between Pangaon- Latur, so that trains from Parli need not have to go to Latur Road
  
Social
0 Followers
16966 views
Mar 21 2017 (16:44)   NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   309 blog posts   1 correct pred (50% accurate)
Entry# 2205368            Tags   Past Edits
Look how dramatic it is, let's name it as the Golden Ellipse as these stations shall play a vital role between CR and SCR once the proposed lines and other pending projects gets completed. Bodhan-Bidar line (in dotted brown) which is pending to be commissioned would be boon connecting the either sides. Though it may take a lot of time but the future of these stations will make an economical impact in the development of this region.

3 posts - Wed May 24, 2017

2 posts - Thu May 25, 2017

  
6238 views
May 26 2017 (01:14)
22691 Making of an AC Exp*^~   2258 blog posts   9 correct pred (90% accurate)
Re# 2205368-6            Tags   Past Edits
Do you know the distance of the LTRR - GR line?

  
6236 views
May 26 2017 (11:27)
skumarvkulkarni~   1695 blog posts
Re# 2205368-7            Tags   Past Edits
Gulbarga Latur distance would be arround 140 to 150Kms... instead of connecting to Latur road railway station Gulbarga-Latur new line should connect at Latur . And to answer your question Gulbarga to Latur road distance would 140+22Kms=162 Kms

  
6183 views
May 26 2017 (12:25)
jazzradio   27 blog posts
Re# 2205368-8            Tags   Past Edits
It's going to be Latur- Ausa- Nilanga- Omerga- Aland & Gulbarga, covering a distance of approx. 150 KMs

  
6209 views
May 26 2017 (12:37)
skumarvkulkarni~   1695 blog posts
Re# 2205368-9            Tags   Past Edits
The new Latur-Gulbarga line can branch out from Sultanpur station(new station on Bidar-Gulbarga new line). This can save additionally 10kms for entire Latur-Gulbarga new line construction...
The Latur-Gulbarga should go via
Gulbarga-Sultanpur(already line exist)
Sultanpur-Karnataka Central University (Kadaganchi)
Aland-
...
more...
Khajuri-Umerga
Umerga-Khillari- Ausa-Latur(If it goes via Nilanga it will be round about)

  
6175 views
May 26 2017 (13:08)
jazzradio   27 blog posts
Re# 2205368-10            Tags   Past Edits
I agree, but just a diversion of about 10-20 Kms can bring a Taluka place like Nilanga under a BG line and that can help the people.
If you are aware Usmanabad was no where on the Barshi- Latur narrow guage line, but when the new BG line was put, the route was diverted to cover Usmanabad.
As per MP Ravi Gaikwad, the proposed route is from Ausa- Kasarsirsi- Nilanga- Omerga- Aland, which I believe is being surveyed.
Page#    Showing 1 to 5 of 103 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.