Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 23, 2018 09:04:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 23, 2018 09:04:51 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1937579-0
Details Edit
Large Station Board;
Entry# 2080088-0


HPU/Hapur Junction (5 PFs)
ہاپڑ جنکشن     हापुड़ जंक्शन

Track: Double Electric-Line

Junction point-GZB/MB/MTC/KRJ Railway Road, Hapur Jn.
State: Uttar Pradesh

Elevation: 216 m above sea level
Zone: NR/Northern   Division: Moradabad
 
 

No Recent News for HPU/Hapur Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 86
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.6/5 (40 votes)
cleanliness - good (5)
porters/escalators - good (5)
food - good (5)
transportation - good (5)
lodging - good (5)
railfanning - good (5)
sightseeing - average (5)
safety - good (5)

Nearby Stations

KKMB/Kastla Kasmabad Halt 7 km     KALI/Kaili 7 km     BBO/Babugarh 8 km     HZR/Hafizpur 9 km     PKW/Pilkhua 11 km     QXR/Kuchesar Road 13 km     KXK/Kharkhauda 13 km     SKHR/Sikhera Mb Halt 18 km     CXA/Chandsara Halt 19 km     GLH/Gulaothi 19 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 87 blog entries  next>>
  
General Travel
0 Followers
610 views
Dec 24 2017 (17:39)   12429/Lucknow - New Delhi AC Superfast Express (PT) | HPU/Hapur Junction (5 PFs)

The Rail Mail™*^~   48175 blog posts   18572 correct pred (69% accurate)
Entry# 2930308            Tags   Past Edits
बाल बाल बचे।
  
★  General Travel
0 Followers
593 views
Dec 21 2017 (13:17)   1HMNR/Moradabad Hapur Passenger (UnReserved) | HPU/Hapur Junction (5 PFs)

GONDA The city of Loch~   807 blog posts   94 correct pred (56% accurate)
Entry# 2914422            Tags   Past Edits
ऐसी सौगात तो #indiarailinfo.com ने बहुत पहले ही दे दी थी भारतीय रेलवे के फेंस ही बता देते है कि टिकट कंर्फम होगा या नही ।
  
General Travel
0 Followers
1804 views
Oct 15 2017 (12:16)   14208/Padmavat Express | HPU/Hapur Junction (5 PFs)

Railfan Z*^   11758 blog posts   2590 correct pred (84% accurate)
Entry# 2538731            Tags   Past Edits
This train can never sun on time till auto-signalling is commissioned on GZB-HPU stretch. The traffic is insane and sections are 8-10km long. Everyday it trails BSC Pass and waits for 15-20 minutes at each halt for it to clear the subsequent section.

  
1700 views
Oct 15 2017 (12:19)
Udaipur Mysore HumSafar superfast^~   88570 blog posts   5328 correct pred (78% accurate)
Re# 2538731-1            Tags   Past Edits
There are many trains which will never run on time in their entire life in future until and unless IR does infrastructure upgrade on war footing.

  
1670 views
Oct 15 2017 (12:29)
54012 with IRs 1000th HHP diesel celebration loco^~   2314 blog posts   5632 correct pred (77% accurate)
Re# 2538731-2            Tags   Past Edits
12401 will lead the gang of such trains

  
1664 views
Oct 15 2017 (12:30)
Udaipur Mysore HumSafar superfast^~   88570 blog posts   5328 correct pred (78% accurate)
Re# 2538731-3            Tags   Past Edits
Haan wo to Hai hi
Swatantrata senani is also there
Then Seemanchal also

  
1681 views
Oct 15 2017 (12:32)
▀▄▀▄▀▄ ɨ ąʍ βąȼЌ ▄▀▄▀▄▀   1828 blog posts   21967 correct pred (89% accurate)
Re# 2538731-4            Tags   Past Edits
12561/62 too
/blog/post/2538790

  
1590 views
Oct 15 2017 (23:10)
Railfan Z*^   11758 blog posts   2590 correct pred (84% accurate)
Re# 2538731-5            Tags   Past Edits
12401 is delayed because of poor and biased controlling, not much because of poor infra. It in fact runs on the route with one of the best infra.
  
★  Rail Fanning
0 Followers
3192 views
Aug 10 2017 (19:47)   15273/Satyagraha Express (PT) | HPU/Hapur Junction (5 PFs) | TKD/WDM-3A

GKP LKO Section 120kmph Sucessful Trail Done~   4557 blog posts   6 correct pred (86% accurate)
Entry# 2376390            Tags   Past Edits
On my recent journey in Satyagrah exp😍 next trip in 12596 humsafar exp😎

  
2616 views
Aug 27 2017 (22:21)
Indian Railways the life line of our Nation~   21077 blog posts   137 correct pred (82% accurate)
Re# 2376390-1            Tags   Past Edits
focus kyu nahi kiya

  
2546 views
Aug 28 2017 (08:53)
GKP LKO Section 120kmph Sucessful Trail Done~   4557 blog posts   6 correct pred (86% accurate)
Re# 2376390-2            Tags   Past Edits
Kaha par

  
2558 views
Aug 28 2017 (08:56)
Indian Railways the life line of our Nation~   21077 blog posts   137 correct pred (82% accurate)
Re# 2376390-3            Tags   Past Edits
2nd pic

  
2555 views
Aug 28 2017 (09:19)
NCR is Best~   966 blog posts   488 correct pred (77% accurate)
Re# 2376390-4            Tags   Past Edits
Bhai SG ka Photo Blur h.... TB ka....
  
★★★  Info Update
1 Followers
10117 views
Oct 22 2015 (15:31)   MB/Moradabad Junction (7 PFs)
 

Twesh Rajput~   5538 blog posts   5034 correct pred (86% accurate)
Entry# 1625119            Tags   Past Edits
A BIG UPDATE ON MB-GZB ELECTRIFICATION said by DRM MORADABAD through my Twitter query:--
DRM Moradabad @drm_moradabad:----
@tweshrajput Sir, we should have trains with electric traction in December itself after getting CRS clearance .
click here
...
more...

10 posts - Thu Oct 22, 2015

5 posts - Fri Oct 23, 2015

  
6319 views
Oct 23 2015 (13:33)
Twesh Rajput~   5538 blog posts   5034 correct pred (86% accurate)
Re# 1625119-16            Tags   Past Edits
Logon ka kaam hota h kehna...kitti baar soche hue ka ulta hua h...so lets jst kep fingers crossd and wait fr d best...

  
6248 views
Oct 23 2015 (20:21)
uks1955~   1142 blog posts   3 correct pred (50% accurate)
Re# 1625119-17            Tags   Past Edits
You are right the section daily serve more than 150 trains up and down means average more than 6 to 7 per hour .And it is an important route for the I R as well as N R.

  
6221 views
Oct 24 2015 (22:05)
The Rail Mail™*^~   48175 blog posts   18572 correct pred (69% accurate)
Re# 1625119-18            Tags   Past Edits
Haanji ab to bas no halla gulla...bas shanti ke sath souhardya banaye rakho aur kaam dekhte rho kitna hota h.

  
6194 views
Oct 24 2015 (22:15)
Udaipur Mysore HumSafar superfast^~   88570 blog posts   5328 correct pred (78% accurate)
Re# 1625119-19            Tags   Past Edits
practical thinking aadmi ko aajkal log negative thinking bolte hai .. so sad..

  
7107 views
Oct 25 2015 (18:58)
uks1955~   1142 blog posts   3 correct pred (50% accurate)
Re# 1625119-20            Tags   Past Edits
Bat practical thinking ki nahi approach ki hai while we are dreaming for December , why we should think for six more months . If trains began from December or January , let us dream.
Page#    Showing 1 to 5 of 87 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.