Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 23, 2018 17:47:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 23, 2018 17:47:27 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 992303-0

HSRA/Hosur (3 PFs)
ஓசூர்     होसुर

Track: Construction - Single-Line Electrification

Railway Station Rd, Hosur
State: Tamil Nadu

Elevation: 896 m above sea level
Zone: SWR/South Western   Division: KSR Bengaluru (Bangalore)
 
 

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 26
Number of Originating Trains: 2
Number of Terminating Trains: 2
Rating: 2.4/5 (44 votes)
cleanliness - average (6)
porters/escalators - average (6)
food - average (6)
transportation - average (6)
lodging - poor (5)
railfanning - average (5)
sightseeing - average (4)
safety - average (6)

Nearby Stations

AEK/Anekal Road 14 km     KMLM/Kelamangalam 15 km     HLE/Heelalige 24 km     PRNT/Periya Naga Thunai 24 km     CRLM/Karmelaram 35 km     BLRR/Belandur Road 38 km     RYC/Rayakkottai 40 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 47 blog entries  next>>
  
★  Rail Fanning
0 Followers
1641 views
Dec 10 2017 (12:15)   12677/KSR Bengaluru - Ernakulam InterCity SF Express | SA/Salem Junction (6 PFs)

amit singh ™ ♥♪ ♫♥*^~   5342 blog posts   3456 correct pred (75% accurate)
Entry# 2872902            Tags   Past Edits
BANGALORE To SALEM - Scenic Train Ride & Crossings Through Ghats!!
Video Link: click here

  
1198 views
Dec 21 2017 (19:42)
😍😍Erode Fun Da😍😍~   394 blog posts   29 correct pred (59% accurate)
Re# 2872902-1            Tags   Past Edits
Superb curve beauty...
  
★★★  General Travel
1 Followers
6642 views
Dec 20 2017 (21:34)   16231/Mayiladuthurai - Mysuru (Thanjavur) Express (PT) | TJ/Thanjavur Junction (5 PFs)

மக்கள் செல்வர் அண்ணன் டிடிவி வாழ்க^~   2176 blog posts   3450 correct pred (66% accurate)
Entry# 2912109            Tags   Past Edits
Kindly spare some of your valuable time for seeing this and my effort friends...
Filed an RTI for 16231 and 16232 to SWR MYS Divn which was forwarded to CRIS and gave more than adequate data required...
16231 MV MYS EXP:

Passenger
...
more...
count per Day:
STATIONWISE BOOKINGS FROM:
MV:
2A-5
3A-18
SL-123
KTM:
SL-3
ADT:
3A-1
SL-4
KMU:
2A-7
3A-20
SL-135
PML:
3A-1
SL-6
TJ:
2A-9
3A-26
SL-292
BAL:
SL-3
TRB:
3A-2
SL-20
TPJ:
2A-26
3A-54
SL-288
TP:
2A-1
3A-3
SL-17
KLT:
3A-1
SL-7
KRR:
2A-1
3A-2
SL-28
PGR:
SL-2
ED:
2A-1
3A-6
SL-49
SA:
2A-1
3A-3
SL-19
DPJ:
SL-2
HSRA:
SL-1
BNC:
3A-1
SL-5
SBC:
2A-3
3A-7
CC-2
SL-49
KGI:
SL-1
16232 MYS MV EXP:

Passenger count per Day:
STATIONWISE BOOKINGS FROM:
MYS:
2A-8
3A-22
CC-2
SL-106
MYA:
3A-1
SL-6
MAD:
2A-1
3A-5
SL-30
KGI:
2A-1
3A-5
SL-30
SBC:
2A-28
3A-68
SL-494
BNC:
2A-6
3A-16
SL-126
CRLM:
2A-1
3A-5
SL-39
HSRA:
2A-1
3A-4
SL-68
DPJ:
3A-1
SL-14
SA:
2A-1
3A-2
SL-19
ED:
2A-1
3A-12
SL-32
KRR:
SL-4
TPJ:
SL-10
TJ:
SL-1
After seeing this YOU MUST PEN DOEN YOUR VIEWS FRIENDS........
Thank You..
Donate Blood....

19 posts - Wed Dec 20, 2017

19 posts - Thu Dec 21, 2017

19 posts - Fri Dec 22, 2017

18 posts - Sat Dec 23, 2017

18 posts are hidden.

  
2521 views
Dec 24 2017 (08:01)
KJM WDM 3A Twins*^~   10200 blog posts   497 correct pred (74% accurate)
Re# 2912109-119            Tags   Past Edits
Both aren't maintained at Mysore. So it occupies PF only. Kaveri is very useful as it connects BWT , BWT has very limited train to MYS , the UR response is good till Bangarpet too. Moreover Kaveri occupies PF only for 3 hrs max , shatabdi occupies for an hour. No pitline issue as well. Connecting train will be very valid for TN , MV exp. Both has approximately 150 reserved passengers only and more than 500+ pax are using that train as transit to YPR. Had it been Bidar exp till MYS , large section will be benefited

  
2490 views
Dec 24 2017 (08:13)
மக்கள் செல்வர் அண்ணன் டிடிவி வாழ்க^~   2176 blog posts   3450 correct pred (66% accurate)
Re# 2912109-120            Tags   Past Edits
Okay then if SR develops infra we also get MYS connection you also get space in pitline to accommodate brand new KA trains...

  
2463 views
Dec 24 2017 (08:33)
KJM WDM 3A Twins*^~   10200 blog posts   497 correct pred (74% accurate)
Re# 2912109-121            Tags   Past Edits
As if SR does not have now ?
What stops SR to shift this train to Tuticorin?
Tuticorin maintains only Pearl city.
Boat mail and Uzhavan has been shifted to Trichy , why don't SR retain the old RSA of Pearl city + cape exp and maintain at MS. ? By this Island will be relieved and maintenance at SBC will be reduced
...
more...
to 3 days. Mysore will get pit line slot available on daily basis .

  
2476 views
Dec 24 2017 (08:36)
KJM WDM 3A Twins*^~   10200 blog posts   497 correct pred (74% accurate)
Re# 2912109-122            Tags   Past Edits
1 compliments
Lol.. TEN has constraints..
These suggestions has been sent but SR rejected
SR has problems will all zones like CR also . CR requested to reroute TEN DR via Pollachi so that the Kms are reduced eventually making the SM at Dadar to be removed. SR gave a ridiculous reason stating TEN has constraints

  
2439 views
Dec 24 2017 (08:52)
மக்கள் செல்வர் அண்ணன் டிடிவி வாழ்க^~   2176 blog posts   3450 correct pred (66% accurate)
Re# 2912109-124            Tags   Past Edits
Actually MDU division asking for NMKL diversion of this train and it's RSA and then we will accommodate in TN like that.
Agree island CAPE MS SF RSA must be removed.
CAPE MS SF can have RSA with Ananthu
Mannai and uzhavan
Chendur
...
more...
and PC
Sethu and BM so that pit at TPJ is also relieved.
  
★★★  Rail Fanning
1 Followers
22935 views
Mar 26 2017 (23:04)   16232/Mysuru - Mayiladuthurai (Thanjavur) Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | ED/WDM-3D/11183

LHB for TN Express~   1104 blog posts   183 correct pred (71% accurate)
Entry# 2211891            Tags   Past Edits
A NOTE TO ALL VIEWERS :- This is a post of a video; a Journey compilation; every tag in this post is appearing in the video, not tag is random, if anyone feels any tag is unnecessary, please do watch the video first and then point out errors if any. Thank you.
In a sudden trip to Trichy, right in the middle of the monsoon season, the Mysore Mayiladuthurai Express is taken to Tiruchchirapalli; but what is not foreseen is the amount of rains that will lash out and the lightning and thunderstorms that will accompany. The indication is given while at Bengaluru City Jn itself; with Lightning making its presence felt. As the journey progressed; rains started lashing out no
...
more...
sooner had the train departed from Hosur and continued all the way upto Karur late into the night. Fierce spurts of lightning could be seen every now and then. At Kelamangalam, Kongu Express bound for the national capital was looped for us to cross. We reached Salem Junction at a few minutes to midnight; and here Chennai bound Blue Mountain Express and Bengaluru bound Ernakulam Bengaluru Superfast Express crossed us. An hour later; we find ourselves at the ever busy Erode Junction; where as many as 3 trains are sighted in a span of 20minutes that we take for loco reversal, the Bengaluru bound Kannur Yeshvantpur Express; Trivandrum mail from Chennai and Chemmozhi express bound for Coimbatore. While departing after Loco reversal; the announcement for a fourth train also was occurring; the Mangalore Chennai Superfast Express. After Erode, its a sedate run till we knock the gates of Trichy; delay is maintained. At Trichy an array of locos including localites - WDM2; WDP3A and WDP4D of GOC shed welcoming us at the wee hours of the morning.
A Monsoon train journey accompanied by lightning and heavy rains
YT Link - click here
  
★  General Travel
1 Followers
6223 views
Jul 31 2016 (15:21)   SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
 

Prometh Suresh   948 blog posts   1028 correct pred (67% accurate)
Entry# 1947341            Tags   Past Edits
Will Bangalore-Salem line via Omalur be electrified or doubled? If yes when will the work start and complete?

  
Jul 31 2016 (15:56)
Vinay~   1364 blog posts   919 correct pred (71% accurate)
Re# 1947341-1            Tags   Past Edits
as of now,it will be only electrified.which will be done as Joint Venture/Public private partnership as mentioned earlier in FEB'16,Initially 160Cr were released and works are yet to start.it will be difficult and may take long time for doubling to be done as this strecth b/w Dharmapuri and Omalur is a ghat section,hilly terrain
  
★★  Rail Fanning
0 Followers
1238 views
Nov 04 2017 (11:40)   12677/KSR Bengaluru - Ernakulam InterCity SF Express | HSRA/Hosur (3 PFs) | GOC/WDP-4B/40068

Pandian SF Express^~   776 blog posts   32187 correct pred (78% accurate)
Entry# 2624828            Tags   Past Edits
12677 KSR Bengaluru - Ernakulam Intercity SF Express arriving at Hosur with GOC WDP4B 40068 (4/11/17)...Video and pic taken from 17236 Nagercoil - KSR Bengaluru Express at Hosur...!!
Pic 1 and 2 - Train boards
Pic 3 - Loco link for today
Pic 4 and 5 - AC chair car coaches C1 and C2
Page#    Showing 1 to 5 of 47 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.