Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Nov 23, 2017 04:03:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Nov 23, 2017 04:03:08 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 926223-0
Details Edit
no description available
Entry# 2489354-0


KSJ/Kasganj Junction (6 PFs)
كاسگج جنکشن     कासगंज जंक्शन

Track: Single Diesel-Line

Railway Road Nadrai Gate, Kasganj, Uttar Pradesh 207123
State: Uttar Pradesh

Elevation: 174 m above sea level
Zone: NER/North Eastern   Division: Izzatnagar
 
 

No Recent News for KSJ/Kasganj Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 24
Number of Originating Trains: 16
Number of Terminating Trains: 16
Rating: 3.1/5 (56 votes)
cleanliness - good (8)
porters/escalators - average (6)
food - average (7)
transportation - average (7)
lodging - good (7)
railfanning - good (7)
sightseeing - average (7)
safety - good (7)

Nearby Stations

KJC/Kasganj City 5 km     BHK/Badhari Kalan 9 km     GGG/Gangagarh Halt 11 km     MHA/Marahra 11 km     SRNK/Soron Shukar Kshetra 15 km     SRN/Soron 15 km     SWRT/Sahawar Town 19 km     AUL/Agsauli 19 km     MPG/Manpur Nagaria 23 km     GRAK/Garkha 26 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 62 blog entries  next>>
  
Info Update
0 Followers
1729 views
Sep 29 2017 (13:24)   KSJ/Kasganj Junction (6 PFs)

©shuk™ RAILWAY My 1st crush^~   1352 blog posts   333 correct pred (55% accurate)
Entry# 2473189            Tags   Past Edits
IRCON (Indian Railway Construction Company Limited) has floated tender for MTJ/Mathura - KSJ/Kasganj Junction - KAP/Kalianpur section's electrification today.
Link : click here
For more check attached pic's.

  
1537 views
Sep 29 2017 (13:42)
Arushsharma991~   231 blog posts
Re# 2473189-1            Tags   Past Edits
Finally some Gud news for this section...

  
1533 views
Sep 29 2017 (13:46)
Arushsharma991~   231 blog posts
Re# 2473189-2            Tags   Past Edits
BTW how mch freight load this line is carrying nowdays??

  
1211 views
Oct 08 2017 (20:09)
Saksham Maheswari   5 blog posts
Re# 2473189-3            Tags   Past Edits
Kab se start ho rha hai CNB-FBD-KSJ-MTJ pr electrification work

  
227 views
Nov 17 2017 (22:29)
asgahlaut6   287 blog posts
Re# 2473189-4            Tags   Past Edits
mathura kasganj route par electrification ka kam mathura side se start ho chuka hai. abhi hathras city aur mendu ke beech pole lagane ke hole banyaye ja rahe hain.
  
Pic Upload
0 Followers
673 views
Oct 12 2017 (02:24)   KSJ/Kasganj Junction (6 PFs)

OM SAI RAM ਆਦਿਤਯ ਕੁਮਾਰ~   1752 blog posts   342 correct pred (61% accurate)
Entry# 2521325            Tags   Past Edits
KSJ - Sun set view of Kasganj station
  
Pic Upload
0 Followers
702 views
Oct 11 2017 (01:36)   KSJ/Kasganj Junction (6 PFs)

OM SAI RAM ਆਦਿਤਯ ਕੁਮਾਰ~   1752 blog posts   342 correct pred (61% accurate)
Entry# 2517061            Tags   Past Edits
Kasganj
  
Info Update
0 Followers
3941 views
Jul 22 2017 (19:48)   BC/Bareilly City (3 PFs)

©shuk™ RAILWAY My 1st crush^~   1352 blog posts   333 correct pred (55% accurate)
Entry# 2360129            Tags   Past Edits
Bareilly (BC) - Kasganj (KSJ) section will be electrified soon.

4 posts - Jul 2017

9 posts - Aug 2017

11 posts - Sat Sep 23, 2017

  
1339 views
Sep 23 2017 (20:26)
12649⭐️ KSK ⭐️12650^~   12482 blog posts   3770 correct pred (68% accurate)
Re# 2360129-25            Tags   Past Edits
Read my last reply

  
1407 views
Sep 23 2017 (20:28)
asgahlaut6   287 blog posts
Re# 2360129-26            Tags   Past Edits
please see ircon tenders

  
1325 views
Sep 23 2017 (20:28)
©shuk™ RAILWAY My 1st crush^~   1352 blog posts   333 correct pred (55% accurate)
Re# 2360129-27            Tags   Past Edits
Let's close the chapter here. No more discussion as I don't want any unnecessary FM warning without any mistake.

  
1401 views
Sep 23 2017 (20:29)
©shuk™ RAILWAY My 1st crush^~   1352 blog posts   333 correct pred (55% accurate)
Re# 2360129-28            Tags   Past Edits
Thanks

  
1328 views
Sep 23 2017 (20:30)
12649⭐️ KSK ⭐️12650^~   12482 blog posts   3770 correct pred (68% accurate)
Re# 2360129-29            Tags   Past Edits
Please remove Re#16
Thanks
  
Poll
0 Followers
6105 views
21 votes
Jan 16 2017 (18:39)   KSJ/Kasganj Junction (6 PFs)

AkashNER~   658 blog posts   69 correct pred (64% accurate)
Entry# 2129430            Tags   Past Edits
How many of my dear friends agree with the fact that it's high time that measures must be taken to 'DE-CONGEST' the overloaded section of CNB-NDLS (via ALJN), by constructing an 'ALTERNATIVE ROUTE' via CNB-Farrukhabad-Kasganj-Atrauli-Khurja-NDLS.
Presently, Kanpur-Kasganj section is SINGLE DIESEL, and could be utilized in future to cater NDLS bound traffic from CNB and vice-versa. It was included in the rail budget of 2012-13 (if I am not wrong), but never acted upon.
KINDLY, support your answer with comments.
YES. this particular alternate route must be considered and would be be helpful90%19
NO. the situation will not change much0%0
Any other views (in comments)10%2

17 posts - Jan 2017

6 posts - Sun Jul 30, 2017

  
2003 views
Jul 30 2017 (21:49)
a2z~   2187 blog posts
Re# 2129430-25            Tags   Past Edits
* A huge step has already been taken to decongest CNB-NDLS (via ALJN) by way of fast construction of double lined high capacity Eastern DFC from LDH-Delhi-CNB-MGS-Sonnagar & ultimately to Kolkata.
* CNB-Farrukhabad-Kasganj-Atrauli-Khurja-NDLS is a much slower (10 hrs against 6-7 hrs) and longer (491kms against 440kms) route and shall not be so effective as an alternative route.

  
1998 views
Jul 30 2017 (21:50)
12301HowrahRajdhaniTheGod~   2203 blog posts   1 correct pred (100% accurate)
Re# 2129430-26            Tags   Past Edits
send this to IR Suggestion portal

  
2114 views
Jul 30 2017 (22:14)
Arushsharma991~   231 blog posts
Re# 2129430-27            Tags   Past Edits
I m not sure abt Fatehpur-Dalmau link but the second one has huge potential as it can provide an ALTERNATIVE for both CNB -NDLS nd LKO - NDLS provided that KSJ shud be connected with ALJN...
Secondly,the route u proposed appears to be more useful as it will provide the SPN link nd CNB bound trains can use the route for BE connectivity as well.
But I have always found IR smwht stingy😑 and the route u proposed requires more land acquisition and construction cost..

  
1896 views
Jul 31 2017 (02:33)
Prakhar*^~   4334 blog posts   414 correct pred (82% accurate)
Re# 2129430-28            Tags   Past Edits
Agreed ! eDFC wud game changer n milking cow for IR.
.
But aap choti new line KSJ - krj k against q ho ?
Time zyada le rha hai. Maana. But aise toh lko-mb-ndls zyada time leta hai Dan lko-cnb-ndls inspite of the fact d later is longer.
.
...
more...

Bhagwan naa kare, but accidental case mei traffic disrupt nhi hoga n can B diverted.
Also uss line k stations ko Delhi k lie naaya raasta milega jisse development hoga.
.
GC se faida dekho Kannauj / kasganj / bem /FBD jaise jagah ko Delhi, Mumbai, Adi , kol k lie direct connectivity mil gyi hai else they wud have run to catch trains to nearby larger city.

  
1837 views
Jul 31 2017 (11:52)
a2z~   2187 blog posts
Re# 2129430-29            Tags   Past Edits
* I'am not against the line friend, I was just analysing the situation from IR point of view.
* Since decision of identifying the saturated routes is taken by IR management, it will like to evaluate the traffic on the route via ALJN after DFC is commissioned.
* It is never advisable to divert CNB-Delhi traffic through longer route, as it will increase both, the logistics cost as well as the transit time, which goes contrary to the very purpose of constructing DFC.
*
...
more...
Even after commissioning of DFC, the route via ALJN is saturated, IR may consider diverting some of the traffic via KSG. If the route via KSG have enough traffic of its own then IR may even like to go for its doubling.
Page#    Showing 1 to 5 of 62 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.