Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 17, 2018 09:29:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 17, 2018 09:29:07 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 486497-0
Details Edit
Large Station Board;
Entry# 2133507-0

KRAR/Khariar Road (2 PFs)
ଖରିଆର ରୋଡ଼     खरियार रोड़

Track: Construction - Doubling+Electrification

National Highway 217, Jonk
State: Odisha

Elevation: 325 m above sea level
Zone: ECoR/East Coast   Division: Sambalpur
 
 

No Recent News for KRAR/Khariar Road
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 34
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.4/5 (8 votes)
cleanliness - excellent (1)
porters/escalators - poor (1)
food - excellent (1)
transportation - average (1)
lodging - good (1)
railfanning - good (1)
sightseeing - good (1)
safety - average (1)

Nearby Stations

KMK/Komakhan 11 km     NPD/Nawapara Road 11 km     BGBR/Bagbahra 21 km     LKNA/Lakhna 25 km     BMKJ/Bhimkhoj 32 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 25 blog entries  next>>
  
Pic Upload
0 Followers
649 views
Nov 24 2017 (12:36)   KRAR/Khariar Road (2 PFs) | VSKP/WDM-3D/11536

Govindasharma818   71 blog posts
Entry# 2808340            Tags   Past Edits
VSKP WDM3D 11536 with Raipur Vskp passenger standing at khariar road station in PLETFORM 1 for crossing of Puri Durg intercity exp

  
577 views
Nov 24 2017 (18:24)
Arpit P   6346 blog posts   1897 correct pred (80% accurate)
Re# 2808340-1            Tags   Past Edits
#LocoPic updated
  
Pic Upload
0 Followers
341 views
Nov 24 2017 (12:40)   58528/Visakhapatnam - Raipur Passenger (UnReserved) | KRAR/Khariar Road (2 PFs)

Govindasharma818   71 blog posts
Entry# 2808362            Tags   Past Edits
Raipur Vskp passenger at khariar road station in PLETFORM NO 1
  
★  Pic Upload
0 Followers
1872 views
Jan 20 2017 (13:22)   KRAR/Khariar Road (2 PFs)

Time Traveller~   593 blog posts   7201 correct pred (74% accurate)
Entry# 2133507            Tags   Past Edits
New look of khariar road rly stn.
  
★  General Travel
0 Followers
24146 views
Apr 12 2016 (08:46)   22847/Visakhapatnam - Mumbai LTT SF Express (via Nagpur) | LTT/Lokmanya Tilak Terminus (5 PFs)
 

WAP7   81 blog posts
Entry# 1799556            Tags   Past Edits
I had travelled by the 22847 LTT Express from Visakhapatnam to Mumbai. The train was filled to capacity and wait listed passengers had also boarded this train in the down stations at Bobbili, Rayagada, Titlagarh, Kantabanji… as this is the only train to India's commercial capital from this region, says Karunakar, who travelled by this train recently.
Many people with general tickets boarded the train till Raipur and Durg as it is serving as a daytime Intercity Express. Many pilgrims from Vizianagaram, Rayagada and other places, find this train convenient to visit Sri Shirdi Sai Baba temple. They alight at Manmad and go by road.
Since
...
more...
this train has such high patronage, we request the East Coast Railway to initiate the following: Increase the number of coaches from the present 19 to 24 by adding a few AC coaches as there is huge demand, convert the train into a daily (as it caters to the needs of people going to both Mumbai and Shirdi) by slightly changing its timings as this slot is filled and run as a daily two-pair Inter-city (like 12805/6 Janmabhoomi Express) from Visakhapatnam to Raipur/Bilaspur/Korba and vice-versa as it reduces the load on this train.

  
22254 views
Apr 12 2016 (09:45)
AAA   369 blog posts
Re# 1799556-1            Tags   Past Edits
Agree with Karunakar ..
This train should be made daily as it caters to the needs of People of North Coastal AP & South Western Odisha .. going to Shirdi & Mumbai ..
A day time ICE from VSKP to R/BSP/KRBA reduces the load on 12807 Samata SF Exp
If made daily then in a way it reduces the load on 18519/20 and 18503/4
...
more...
..
So ya these r good sugg to be implemented ..

  
Apr 13 2016 (15:51)
   2569 blog posts   4 correct pred (67% accurate)
Re# 1799556-2            Tags   Past Edits
yes.. Indeed the frequency of this train should be increased...
  
General Travel
0 Followers
5350 views
Apr 26 2016 (11:15)   12894/Bolangir - Bhubaneswar Superfast Express | KRAR/Khariar Road (2 PFs)
 

Afraaz suhail 🚂🚄🚅^~   4535 blog posts   576 correct pred (87% accurate)
Entry# 1820780            Tags   Past Edits
Their is demand to extend this train till Khariar Road. Is this demand is justified??

8 posts - Tue Apr 26, 2016

  
4660 views
Apr 26 2016 (11:34)
Guest: 7131ce16   show all posts
Re# 1820780-9            Tags   Past Edits
ya i really doubt will ecor do that?

  
4594 views
Apr 26 2016 (11:42)
Afraaz suhail 🚂🚄🚅^~   4535 blog posts   576 correct pred (87% accurate)
Re# 1820780-10            Tags   Past Edits
Demand toh hai

  
4605 views
Apr 26 2016 (12:13)
Srikanth~   1675 blog posts   608 correct pred (73% accurate)
Re# 1820780-11            Tags   Past Edits
I guess, then it should go till Raipur with 2 rakes for secondary maintenance like 12805/06.

  
4489 views
Apr 26 2016 (16:58)
Afraaz suhail 🚂🚄🚅^~   4535 blog posts   576 correct pred (87% accurate)
Re# 1820780-12            Tags   Past Edits
Too long

  
4459 views
Apr 26 2016 (17:39)
Srikanth~   1675 blog posts   608 correct pred (73% accurate)
Re# 1820780-13            Tags   Past Edits
Then, KRAR has provision for Secondary maintenance ? Raipur is 13 hrs like SC - VSKP. With 2 rakes its possible.
Page#    Showing 1 to 5 of 25 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.