Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Tue Oct 23 19:16:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Stn TipUpload Stn PicAdvanced Search

KMU/Kumbakonam (3 PFs)
கும்பகோணம்     कुंभकोणम

Track: Construction - Single-Line Electrification

Kamarajar Road, Kumbakonam , Ph: 0435-2433131
State: Tamil Nadu

Elevation: 32 m above sea level
Zone: SR/Southern   Division: Tiruchchirappalli

No Recent News for KMU/Kumbakonam
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 38
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.6/5 (82 votes)
cleanliness - good (11)
porters/escalators - average (9)
food - good (12)
transportation - good (10)
lodging - good (10)
railfanning - average (9)
sightseeing - excellent (11)
safety - good (10)

Nearby Stations

DSM/Darasuram 4 km     TRM/Tirunagesvaram 5 km     SWI/Swamimalai 7 km     SPL/Sundaraperumal Kovil 9 km     TDR/Tiruvidaimaruthur 9 km     ADT/Aduturai 12 km     PML/Papanasam 14 km     PDV/Pandaravadai 17 km     NPT/Narasingampet 17 km     AZP/Ayyampet 21 km    

Station Forum

Page#    Showing 1 to 5 of 76 blog entries  next>>
  
Poll
0 Followers
12866 views
43 votes
Jul 05 (20:52)   TPJ/Tiruchchirappalli Junction (8 PFs)

Electric wire are Waiting to Penetrate Thanjavur J~   846 blog posts   120 correct pred (62% accurate)
Entry# 3603495            Tags   Past Edits
Which of these electrification of Sourthern Railway ( expert SA hrsa electrification )or Tamil Nadu should be completed at first . ( Please tell the reason in command )
NO vote
Main Line ( TPJ - TJ - VM ) AND MV - TVR
58%
25
TPJ - TJ - KIK / VLNK
19%
8
KRR - NMKL - SA
7%
3
SA - ATU - VRI
0%
0
SA - DPJ - HRSA - [BYPL]
16%
7

  
10894 views
Jul 05 (21:52)
KSR Bengaluru Chennai Mail^~   14881 blog posts   26284 correct pred (87% accurate)
Re# 3603495-2            Tags   Past Edits
DPJ-HSRA comes under SWR.

  
10265 views
Jul 06 (21:04)
Electric wire are Waiting to Penetrate Thanjavur J~   846 blog posts   120 correct pred (62% accurate)
Re# 3603495-4            Tags   Past Edits
More votes please

  
Jul 06 (21:18)
TheSuperFastExpress~   431 blog posts
Re# 3603495-6            Tags   Past Edits
KRR-DG is electrified now, so is ED-KRR-TPJ. Only missing link is SA-KRR. If this opens up as all electric, there can be seamless connectivity to South TN from SA. Trains could be operated from South TN to MAS/MS/TBM via SA, JTJ. Since VM line is crowded already and DG-SA-MAS takes the same time as Mainline (DG-TPJ-MV-VM-SA), this line could be used.
  
General Travel
0 Followers
4517 views
Aug 12 (16:10)   22623/Mahal SF Express (PT) | MS/Chennai Egmore (11 PFs)

Cheap Thrills^~   6725 blog posts   28770 correct pred (76% accurate)
Entry# 3705756            Tags   Past Edits
Friends, Changes of Mahal SF in upcoming TAAG.
22624
MDU 21.05
TPJ 23.25 23.30
TJ 00.15 00.17
VM
...
more...
04.18 04.20
MS 07.15
22623
MS 23.50
VM 02.25 02.35
TJ 06.20 06.22
TPJ 07.15 07.20
MDU 10.00

  
3188 views
Aug 12 (16:24)
பாண்டியன் அதிவிரைவு வண்டி^~   1858 blog posts   51191 correct pred (81% accurate)
Re# 3705756-2            Tags   Past Edits
MDU to MS TT okay.... but return TT it can be as of now....and LTT MDU slot is mixing with mahal from CGL to MDU....i think only slight gap between mahal and LTT MDU...!!

  
3228 views
Aug 12 (16:26)
Cheap Thrills^~   6725 blog posts   28770 correct pred (76% accurate)
Re# 3705756-3            Tags   Past Edits
Hehe.. Change panniduvanga most probably I feel.

  
3154 views
Aug 12 (16:29)
பாண்டியன் அதிவிரைவு வண்டி^~   1858 blog posts   51191 correct pred (81% accurate)
Re# 3705756-4            Tags   Past Edits
10 mins gap la mahal a follow panuthu LTT MDU from CGL to VM....!!

  
3200 views
Aug 12 (16:32)
Cheap Thrills^~   6725 blog posts   28770 correct pred (76% accurate)
Re# 3705756-5            Tags   Past Edits
Hmm. Also rendukkum no stop. Mahal will be ahead for sure till VM. Due to SF and priority
  
Rail Fanning
0 Followers
5201 views
★★
Jun 27 (11:10)   16232/Mysuru - Mayiladuthurai (Thanjavur) Express | KMU/Kumbakonam (3 PFs) | ED/WDG-3A/14842R

GOC WDP3A Forever Crush😍~   5694 blog posts   29 correct pred (67% accurate)
Entry# 3577709            Tags   Past Edits
Date:-25 June,2018
Loco:-ED WDG3A 14842R

  
3485 views
Jun 27 (16:35)
KSR Bengaluru Chennai Mail^~   14881 blog posts   26284 correct pred (87% accurate)
Re# 3577709-2            Tags   Past Edits
They should impose a PSR of 20-30. Trains arriving on PF.No.1 speed through the PF posing danger to passengers crossing tracks. Termination board can be placed near the starter.
  
General Travel
0 Followers
4324 views
★★★
Jul 02 (21:21)   18495/Rameswaram - Bhubaneswar Express (PT) | KMU/Kumbakonam (3 PFs)

Electric wire are Waiting to Penetrate Thanjavur J~   846 blog posts   120 correct pred (62% accurate)
Entry# 3596490            Tags   Past Edits
Train board of TRAIN NO 18495/18496 . This pic is taken at KMU
  
Poll
0 Followers
3155 views
17 votes
Jul 21 (13:03)   16866/Uzhavan Express (PT) | TJ/Thanjavur Junction (5 PFs)

Cheap Thrills^~   6725 blog posts   28770 correct pred (76% accurate)
Entry# 3647364            Tags   Past Edits
Do you think T.No 16865/66 Uzhavan Express needs one more A.C. 3 Tier to be augmented in permanent?
COMMENTS MUST BEFORE VOTING!
NO vote
Yes. It is immediately necessary and the demand proves it. can be added extra to the existing coach composition itself.
0%
0
Yes. can be done by first adding as extra AC 3 Tier coach. seeing the response and making it permanent.
76%
13
No Need as the present A.C 3 tier coaches are more than enough
6%
1
Yes. No problem. as the demand is good.it can be done by replacing a sleeper class coach with an A.C 3 Tier coach (Replacing S13 by B3)
18%
3

  
1830 views
Jul 21 (14:30)
Pallavan Express™திருச்சி ஸ்ரீ கங்காநகர் ஹம்சபார்^~   7458 blog posts   9970 correct pred (75% accurate)
Re# 3647364-4            Tags   Past Edits
Is HA1 filled entirely?

  
1967 views
Jul 21 (17:42)
Cheap Thrills^~   6725 blog posts   28770 correct pred (76% accurate)
Re# 3647364-5            Tags   Past Edits
In weekends H part goes betond WL 10.
A part is naturally filled only anyday. Even HA1 replaced by A2 is fyn

  
1951 views
Jul 21 (20:19)
Pallavan Express™திருச்சி ஸ்ரீ கங்காநகர் ஹம்சபார்^~   7458 blog posts   9970 correct pred (75% accurate)
Re# 3647364-6            Tags   Past Edits
1 AC is meant to be attached by politics right?
Page#    Showing 1 to 5 of 76 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy