Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 24, 2018 18:13:22 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 24, 2018 18:13:22 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 384400-0
Details Edit
Large Station Board;
Entry# 1382820-0


MTM/Machilipatnam (2 PFs)
మచిలీపట్నం     मचिलीपट्णम
[Masulipatnam]

Track: Single Diesel-Line

Tarakaturu, Machilipatnam ,Krishna District
State: Andhra Pradesh

Elevation: 7 m above sea level
Zone: SCR/South Central   Division: Vijayawada
 
 

No Recent News for MTM/Machilipatnam
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 13
Number of Terminating Trains: 13
Rating: 4.2/5 (15 votes)
cleanliness - good (2)
porters/escalators - poor (1)
food - good (2)
transportation - excellent (2)
lodging - excellent (2)
railfanning - excellent (2)
sightseeing - good (2)
safety - excellent (2)

Nearby Stations

CLU/Chilakalapudi 5 km     PAV/Pedana 10 km     VMD/Vadlamannadu 18 km     KVM/Kavutaram 22 km     GVL/Gudlavalleru 26 km     NUJ/Nujella 31 km     GDV/Gudivada Junction 37 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 58 blog entries  next>>
  
★★  Info Update
Dec 12 2017 (20:37)   17401/Tirupati-Machilipatnam Link Express | NS/Narasapur (2 PFs)

12649⭐️ KSK ⭐️12650^~   17026 blog posts   7756 correct pred (69% accurate)
Entry# 2881836            Tags   Past Edits
Extension of 17401/2/3/4 Machilipatnam/Narsapur - Tirupati Link Express upto Dharmavaram

98 posts - Fri Dec 29, 2017

  
1685 views
Dec 29 2017 (11:10)
CIRCAR 1965~   2649 blog posts   48 correct pred (67% accurate)
Re# 2881836-99            Tags   Past Edits
I don't think they have to modify the pitline to handle LHB rakes. All needed are LHB spares, maintenance for EOGs and Skilled labor.

  
1394 views
Jan 01 2018 (11:10)
udaya415   10 blog posts
Re# 2881836-100            Tags   Past Edits
This is the first linking train from Anantapur(Dharmavaram) to nellore,kavali,chirala,bhimavaram,palakollu,narsap ur and gudur.

  
784 views
Jan 14 2018 (23:47)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿2018~   4140 blog posts   154 correct pred (72% accurate)
Re# 2881836-101            Tags   Past Edits
if there was 3rd pf @atp they would have extended upto atp

  
677 views
Jan 15 2018 (10:49)
naveen   388 blog posts
Re# 2881836-102            Tags   Past Edits
this will be extended upto gtl in future for rake maintainance once kallur to gtl is doubled

  
639 views
Jan 15 2018 (11:14)
Bangalore to Kacheguda via kurnool Doubling~   2573 blog posts   2665 correct pred (77% accurate)
Re# 2881836-103            Tags   Past Edits
wish they consider connectivity for krnt and Hx also in future
  
Info Update
0 Followers
851 views
Dec 31 2017 (20:33)   12750/Secunderabad - Machilipatnam SF Express | MTM/Machilipatnam (2 PFs)

Election Trains   1053 blog posts   69 correct pred (65% accurate)
Entry# 2956955            Tags   Past Edits
after extension to bidar
bidar-mtm 110 seats sl
sc-mtm 142 seats
12749/50 same qouta mtm-sc/bidar 278 sl
  
Info Update
0 Followers
329 views
Dec 28 2017 (14:21)   17401/Tirupati-Machilipatnam Link Express | MTM/Machilipatnam (2 PFs)

udaya415   10 blog posts
Entry# 2945222            Tags   Past Edits
17245,17247---17246-17248. Add in the train list .it is starts from 11-03-2017
  
★  Info Update
0 Followers
1210 views
Nov 02 2017 (19:48)   12749/Machilipatnam - Secunderabad Express | MTM/Machilipatnam (2 PFs)

SRG*^~   36391 blog posts   199466 correct pred (77% accurate)
Entry# 2617524            Tags   Past Edits
12749/12750 To be extended to Bidar W.e.f March 1st 2018 from MTM & 2nd March 2018 from Bidar. Revised TT & PR from SCR.

1 posts - Thu Nov 02, 2017

  
1107 views
Nov 02 2017 (19:50)
Diamond Jubliee for KOL Locals^~   28489 blog posts   104408 correct pred (76% accurate)
Re# 2617524-2            Tags   Past Edits
Hope this will also get LHB then.

  
1079 views
Nov 02 2017 (19:55)
SRG*^~   36391 blog posts   199466 correct pred (77% accurate)
Re# 2617524-3            Tags   Past Edits
Doubt that..

  
Nov 02 2017 (20:17)
Swaroop Mukherjee^~   2703 blog posts   138 correct pred (58% accurate)
Re# 2617524-4            Tags   Past Edits
It won't get lhb

  
1001 views
Nov 02 2017 (20:22)
Swaroop Mukherjee^~   2703 blog posts   138 correct pred (58% accurate)
Re# 2617524-5            Tags   Past Edits
The two LHB rakes which SC had went for Rayalaseema, those were the rakes of KCG - KJM/COA special Express and SC - BKN/ADI Special Express rake which are now with Rayalaseema

  
954 views
Nov 02 2017 (20:56)
Diamond Jubliee for KOL Locals^~   28489 blog posts   104408 correct pred (76% accurate)
Re# 2617524-6            Tags   Past Edits
3 4 months is enough to get 2 LHB rakes.
  
General Travel
0 Followers
3428 views
Jun 08 2017 (11:13)   BZA/Vijayawada Junction (10 PFs)

Guest: 3bced312   show all posts
Entry# 2311507            Tags   Past Edits
Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works going on, says DRM
South Central Railway (SCR), Vijayawada Divisional Railway Manager (DRM), R. Dhananjayulu, who took stock of the situation in the division after taking charge on April 17 this year, has focussed on expediting the new projects, including connectivity to the A.P. capital city Amaravati. Priority is being given for safety, passenger amenities and increasing passenger and freight revenues in the division, the DRM said in an interview with The Hindu.
Vijayawada railway station recently bagged the fourth place in cleanliness. What is your response?
...
more...

The credit goes to the passengers who are cooperating with the railway authorities in maintaining hygienic conditions in Vijayawada station premises as well as on moving trains. I congratulate the staff for the achievement. About 200 sanitation staff were deployed in the station with cleaning machines and 150 staff were arranged to clean the bogies.
What are the steps being taken to maintain quality in food items and drinking water in canteens on platforms?
SCR will supply Krishna water in the station after purification. We clean water tanks and take up chlorination frequently.
Officials concerned will conduct random checking and the water being supplied through tanks is cent per cent safe.
As regards food items, we will conduct surprise checks in canteens and check quality of food. Railways will not compromise on food quality and we will not hesitate to cancel licences, if any vendor fails to maintain standards.
What is the status of new projects in the division?
We are waiting for approval for rail connectivity to new Capital, Amaravati. The Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works are going on. Likewise, third line works are under progress between Vijayawada-Kazipet and Vijayawada-Gudur-Chennai. As part, the Vijayawada-Kondapalli third line will be commissioned shortly.
How are the earnings of Vijayawada division?
Going to the previous year’s figures, the freight revenue is not good as coal imports from other countries have stopped. Instead, we are focussing on alternative loadings such as fertilizers, bauxite, laterite, aluminium fins and gypsum. This year, both the passenger and freight revenue earnings show positive growth in the last two months.
54 surveillance cameras
Explain about security on stations and running trains.
In all, 54 surveillance cameras were installed in Vijayawada railway station. The GRP and RPF identified vulnerable trains and sections and there were no major thefts and the crime rate has come down in the division.
What are the benefits of Route Relay Interlocking (RRI), which was completed recently in Vijayawada station?
RRI has increased operational manoeuvrability and safety. More than 700 routes are possible after RRI, which was taken up with advanced technology.
Give details on passenger amenities in stations.
In Vijayawada railway station, escalators were provided on platforms 2 to 7, and now we are installing escalators on 8 and 9 platforms. Besides, lifts were provided.
The bids will be opened by this month end for Station Re-Development Programme which will provide more facilities for the commuters.
What are the steps being taken to prevent accidents at railway gates?
We have 23 unmanned level crossing gates in Vijayawada Railway Division. We will remove all the unmanned gates by this year end in a phased manner.
click here
Page#    Showing 1 to 5 of 58 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.