Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 08:11:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 08:11:07 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 384400-0
Details Edit
Large Station Board;
Entry# 565594-0
Details Edit
Large Station Board;
Entry# 1232150-0
Details Edit
Large Station Board;
Entry# 1382820-0

MTM/Machilipatnam (2 PFs)
మచిలీపట్నం     मचिलीपट्णम
[Masulipatnam]

Track: Single Diesel-Line

Tarakaturu, Machilipatnam
State: Andhra Pradesh

Elevation: 7 m above sea level
Zone: SCR/South Central   Division: Vijayawada
No Recent News for MTM/Machilipatnam
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 14
Number of Terminating Trains: 12
Rating: 4.3/5 (7 votes)
cleanliness - good (1)
porters/escalators - n/a (0)
food - good (1)
transportation - excellent (1)
lodging - good (1)
railfanning - good (1)
sightseeing - excellent (1)
safety - excellent (1)

Nearby Stations

CLU/Chilakalapudi 5 km     PAV/Pedana 10 km     VMD/Vadlamannadu 18 km     KVM/Kavutaram 22 km     GVL/Gudlavalleru 26 km     NUJ/Nujella 31 km     GDV/Gudivada Junction 37 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 54 blog entries  next>>
  
General Travel
0 Followers
1083 views
Jun 08 2017 (11:13)   BZA/Vijayawada Junction (10 PFs)

xxxx~   882 blog posts   38 correct pred (58% accurate)
Entry# 2311507            Tags   Past Edits
Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works going on, says DRM
South Central Railway (SCR), Vijayawada Divisional Railway Manager (DRM), R. Dhananjayulu, who took stock of the situation in the division after taking charge on April 17 this year, has focussed on expediting the new projects, including connectivity to the A.P. capital city Amaravati. Priority is being given for safety, passenger amenities and increasing passenger and freight revenues in the division, the DRM said in an interview with The Hindu.
Vijayawada railway station recently bagged the fourth place in cleanliness. What is your response?
...
more...

The credit goes to the passengers who are cooperating with the railway authorities in maintaining hygienic conditions in Vijayawada station premises as well as on moving trains. I congratulate the staff for the achievement. About 200 sanitation staff were deployed in the station with cleaning machines and 150 staff were arranged to clean the bogies.
What are the steps being taken to maintain quality in food items and drinking water in canteens on platforms?
SCR will supply Krishna water in the station after purification. We clean water tanks and take up chlorination frequently.
Officials concerned will conduct random checking and the water being supplied through tanks is cent per cent safe.
As regards food items, we will conduct surprise checks in canteens and check quality of food. Railways will not compromise on food quality and we will not hesitate to cancel licences, if any vendor fails to maintain standards.
What is the status of new projects in the division?
We are waiting for approval for rail connectivity to new Capital, Amaravati. The Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works are going on. Likewise, third line works are under progress between Vijayawada-Kazipet and Vijayawada-Gudur-Chennai. As part, the Vijayawada-Kondapalli third line will be commissioned shortly.
How are the earnings of Vijayawada division?
Going to the previous year’s figures, the freight revenue is not good as coal imports from other countries have stopped. Instead, we are focussing on alternative loadings such as fertilizers, bauxite, laterite, aluminium fins and gypsum. This year, both the passenger and freight revenue earnings show positive growth in the last two months.
54 surveillance cameras
Explain about security on stations and running trains.
In all, 54 surveillance cameras were installed in Vijayawada railway station. The GRP and RPF identified vulnerable trains and sections and there were no major thefts and the crime rate has come down in the division.
What are the benefits of Route Relay Interlocking (RRI), which was completed recently in Vijayawada station?
RRI has increased operational manoeuvrability and safety. More than 700 routes are possible after RRI, which was taken up with advanced technology.
Give details on passenger amenities in stations.
In Vijayawada railway station, escalators were provided on platforms 2 to 7, and now we are installing escalators on 8 and 9 platforms. Besides, lifts were provided.
The bids will be opened by this month end for Station Re-Development Programme which will provide more facilities for the commuters.
What are the steps being taken to prevent accidents at railway gates?
We have 23 unmanned level crossing gates in Vijayawada Railway Division. We will remove all the unmanned gates by this year end in a phased manner.
click here
  
General Travel
0 Followers
1223 views
May 21 2017 (20:46)   12749/Machilipatnam - Secunderabad Express | MTM/Machilipatnam (2 PFs) | BZA/WDP-1/15056

kolluri2792   34 blog posts   17 correct pred (89% accurate)
Entry# 2286682            Tags   Past Edits
1.Running with dual locos(bza wdp1 #15056,bza wdp1 #15055)
2.Also running with HA2

  
1206 views
May 21 2017 (20:53)
Pŕāķāşh*^~   8139 blog posts   1243 correct pred (61% accurate)
Re# 2286682-1            Tags   Past Edits
15055 belongs to TKD.
  
Info Update
0 Followers
6059 views
Feb 08 2017 (18:10)   12749/Machilipatnam - Secunderabad Express | MTM/Machilipatnam (2 PFs)

Guest: 6ccffdc5   show all posts
Entry# 2156258            Tags   Past Edits
12749/50 new number from
May25/26
3rd time train number changed

54 posts - Fri Feb 10, 2017

  
3096 views
Feb 10 2017 (15:08)
SRG*^~   35729 blog posts   174025 correct pred (76% accurate)
Re# 2156258-55            Tags   Past Edits
Antega manodi gurinchi telisinde ga dora...

  
2589 views
Mar 04 2017 (23:05)
DanSebastian~   217 blog posts   14 correct pred (56% accurate)
Re# 2156258-56            Tags   Past Edits
12750,17256 rendu same time dep from BZA......but SF ki ekkuva preference kabatti 17256 late avtadi...12750 will go first

  
1522 views
Apr 30 2017 (21:03)
Hx Bza Penna Express~   380 blog posts
Re# 2156258-57            Tags   Past Edits
Early arrival at Secunderabad makes any rsa pattern like
Ns-Hyb-Kcvl-Hyb-Ns.......

  
1501 views
Apr 30 2017 (21:19)
Guest: 3bcd365d   show all posts
Re# 2156258-58            Tags   Past Edits
No rsa for this train
Just clashes with simhapuri so early arrival

  
1441 views
Apr 30 2017 (22:06)
Hx Bza Penna Express~   380 blog posts
Re# 2156258-59            Tags   Past Edits
:)
  
Rail Fanning
0 Followers
632 views
Mar 01 2017 (23:34)   MTM/Machilipatnam (2 PFs)

Railfan Z*^~   11560 blog posts   2583 correct pred (84% accurate)
Entry# 2182855            Tags   Past Edits
Highlight of the trip - Catching the BZA Baldie. DP1 15057. Posing with his contemporaries.
  
General Travel
0 Followers
707 views
Feb 04 2017 (21:38)   MTM/Machilipatnam (2 PFs)

MTM exp is now modern SF   20 blog posts
Entry# 2151744            Tags   Past Edits
plz increase length of platform in machilipatnam, because it can't hadle more than 15 coaches. it's very bad to get general coaches of MTM-SC EXP,KONDAVEEDU EXP at mtm platforms

  
704 views
Feb 04 2017 (21:40)
IR no more Safe^~   23158 blog posts   99762 correct pred (75% accurate)
Re# 2151744-1            Tags   Past Edits
pls suggest on Twitter. we dont have any influence with Govt site .
Page#    Showing 1 to 5 of 54 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.