Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jan 19, 2018 21:20:18 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jan 19, 2018 21:20:18 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 384479-0
Details Edit
Large Station Board;
Entry# 2044078-0


RHA/Ranaghat Junction (6 PFs)
রানাঘাট জংশন     रानाघाट जंक्शन

Track: Double Electric-Line

Ranaghat Railway Station, G N P C Rd, Ranaghat, Dist - Nadia Ph:03473-210651
State: West Bengal

Elevation: 13 m above sea level
Zone: ER/Eastern   Division: Sealdah
 
 

No Recent News for RHA/Ranaghat Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 18
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.3/5 (24 votes)
cleanliness - average (3)
porters/escalators - average (3)
food - average (3)
transportation - average (3)
lodging - average (2)
railfanning - average (3)
sightseeing - poor (3)
safety - average (4)

Nearby Stations

CPHT/Coopers Halt 3 km     KLNP/Kalinarayanpur Junction 4 km     BNKA/Bankim Nagar 4 km     NBRN/Naba Raynagar Halt 5 km     PDX/Payradanga 5 km     PNCB/Pancheberia 6 km     BIJ/Birnagar 8 km     HBE/Habibpur 8 km     AG/Aranghata 9 km     GGP/Gangnapur 10 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 43 blog entries  next>>
  
Poll
1 Followers
2360 views
21 votes
Oct 27 2017 (10:51)   SDAH/Sealdah (20 PFs)

জয়দীপ JOYDEEP जय़दीप*^~   7915 blog posts   117 correct pred (74% accurate)
Entry# 2592183            Tags   Past Edits
নশিপুর ব্রিজ সম্পূর্ণ হয়ে গেলে উত্তরবঙ্গ গামী কোন ট্রেনকে পথ পরিবর্তন করে রানাঘাট - বহরমপুর হয়ে চালালে ওই অঞ্চলের মানুষের উপকার হবে , আপনার মতামত জানাবেন ভোটের মাধ্যমে , অযথা বিতর্ক সৃষ্টি করবেন না।
After AZ - MBB link , Diverting of which North Bengal bound train will benefit more for the passengers of this section ..
NB - No new train ..
13141/2 Teesta Torsha Express67%14
13147/8 Uttarbanga Express19%4
13149/50 Kanchankannya Express5%1
12343/4 Darjeeling Mail10%2
12377/8 Padatik Express0%0

15 posts - Fri Oct 27, 2017

  
1966 views
Oct 27 2017 (17:12)
DM^~   5461 blog posts   12168 correct pred (88% accurate)
Re# 2592183-19            Tags   Past Edits
Radhikapur ekdik theke bhalo.....but eai route ta puro ready hoe gele kono ekta train ke Dhubri porjonto extend kore oi route ea chailye debe....
But DM ea 4/5 ta stop diye dile seta r DM thakbe na...jor jabardasti time kamate gele MLDT er por jhul kheye hal khrp hoe jabe....

  
1953 views
Oct 27 2017 (17:30)
জয়দীপ JOYDEEP जय़दीप*^~   7915 blog posts   117 correct pred (74% accurate)
Re# 2592183-20            Tags   Past Edits
Dhubri niye jabe kano ? okhane rake rahar jayga porjonto nei ..

  
1965 views
Oct 27 2017 (17:35)
DM^~   5461 blog posts   12168 correct pred (88% accurate)
Re# 2592183-21            Tags   Past Edits
Bamanhat.....

  
1910 views
Oct 27 2017 (19:39)
জয়দীপ JOYDEEP जय़दीप*^~   7915 blog posts   117 correct pred (74% accurate)
Re# 2592183-22            Tags   Past Edits
Bamanhat e 3 te line 2 to pf koreche notun ..

  
1900 views
Oct 27 2017 (20:19)
DM^~   5461 blog posts   12168 correct pred (88% accurate)
Re# 2592183-23            Tags   Past Edits
Tahale hoito Bamanhat porjonto extend hobe
  
General Travel
0 Followers
8496 views
Apr 21 2016 (17:36)   12443/Haldia - Anand Vihar Terminal SF Express (PT) | ANVT/Anand Vihar Terminal (7 PFs)
 

rajkamalspj~   661 blog posts   41 correct pred (75% accurate)
Entry# 1813875            Tags   Past Edits
Railway can run a regular weekly suferfast train between ANVT LGL Via MGS DHN ASN BWN BDC KPA RHA BPC using the stable rake of this train. The train will get a very high patronage as still this highly populated section lacking of direct connectivity with national capital.
  
Info Update
0 Followers
3822 views
Aug 31 2017 (09:11)   63105/Sealdah - Lalgola MEMU | SDAH/Sealdah (20 PFs)

Guest: 2a1925ed   show all posts
Entry# 2395157            Tags   Past Edits
CHANGE IN NOMENCLATURE, RAKE ALLOTMENT & SOME MINOR MODIFICATIONS

  
3603 views
Aug 31 2017 (09:19)
Yuva Rahul Shortly In Serampore😊😯^~   5152 blog posts   7304 correct pred (80% accurate)
Re# 2395157-1            Tags   Past Edits
53186 me Reserved coach add hoga Kya 63106 Memu se 53186 Passnger me convert ho rahi hai

  
3605 views
Aug 31 2017 (09:55)
Guest: 2a40ec4e   show all posts
Re# 2395157-2            Tags   Past Edits
No idea.

  
3540 views
Aug 31 2017 (11:21)
Diamond Jubliee for KOL Locals^~   28270 blog posts   104346 correct pred (76% accurate)
Re# 2395157-3            Tags   Past Edits
rsa hoga sab lgl pass ka. abhi 3 pair ka rsa hai, yeh bhi add hoga usme

  
3522 views
Aug 31 2017 (11:25)
Yuva Rahul Shortly In Serampore😊😯^~   5152 blog posts   7304 correct pred (80% accurate)
Re# 2395157-5            Tags   Past Edits
Memu se pass me convert kar hi Q rahe hai ?

  
3519 views
Aug 31 2017 (11:26)
Diamond Jubliee for KOL Locals^~   28270 blog posts   104346 correct pred (76% accurate)
Re# 2395157-6            Tags   Past Edits
2S dalenge ab. sahyd 1 SL bhi
extra reservation charges revenues dega
  
★  General Travel
0 Followers
2888 views
May 21 2017 (00:56)   NH/Naihati Junction (5 PFs)

May i have your attention plzz~   1786 blog posts   6 correct pred (69% accurate)
Entry# 2285379            Tags   Past Edits
Work for 3rd line is in progress in RHA-NH section
Pic Credits - Shoubhik

  
May 21 2017 (01:09)
In a relationship with poorva exp😎😎^~   3231 blog posts   435 correct pred (86% accurate)
Re# 2285379-1            Tags   Past Edits
I'm adding some more pics of the present status of 3rd line in that section😊😊

  
2708 views
May 21 2017 (01:13)
May i have your attention plzz~   1786 blog posts   6 correct pred (69% accurate)
Re# 2285379-2            Tags   Past Edits
CDH main avi tak 3rd line ka kam suru nhi hua????

  
2479 views
May 21 2017 (09:17)
In a relationship with poorva exp😎😎^~   3231 blog posts   435 correct pred (86% accurate)
Re# 2285379-4            Tags   Past Edits
Nahi, avi bas kuch jagah main v kam suru hua hai
  
Info Update
0 Followers
7754 views
Mar 17 2017 (07:09)   31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)

Guest: 53bd71d3   show all posts
Entry# 2200164            Tags   Past Edits
Conversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.

  
7041 views
Mar 17 2017 (07:30)
Dipanjan Das~   1647 blog posts   64 correct pred (62% accurate)
Re# 2200164-1            Tags   Past Edits
Why 30 Mins Stop At Krishnanagar ?

  
6942 views
Mar 17 2017 (07:48)
Yuva Rahul Shortly In Serampore😊😯^~   5152 blog posts   7304 correct pred (80% accurate)
Re# 2200164-2            Tags   Past Edits
2 eloco is rote se Chutti ho gaya ab kahi or use honge

  
5419 views
May 01 2017 (14:55)
Nirmal   12 blog posts
Re# 2200164-3            Tags   Past Edits
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.

  
5309 views
May 01 2017 (15:22)
May i have your attention plzz~   1786 blog posts   6 correct pred (69% accurate)
Re# 2200164-4            Tags   Past Edits
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit

  
5324 views
May 01 2017 (15:32)
Nirmal   12 blog posts
Re# 2200164-5            Tags   Past Edits
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.
Page#    Showing 1 to 5 of 43 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.