Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Aug 19, 2017 07:53:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Aug 19, 2017 07:53:06 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 852304-0
Details Edit
Large Station Board;
Entry# 1711121-0
Details Edit
Large Station Board;
Entry# 1711121-0
Details Edit
Medium; Platform Pic; Large Station Board; Small Station Board;
Entry# 2255228-0

RE/Rewari Junction (8 PFs)
     रेवाड़ी जंक्शन

Track: Double Electric-Line

Junction Point - BNW/RGS/LHU/BKI/DEC/JHJ, Rewari
State: Haryana

Elevation: 246 m above sea level
Zone: NWR/North Western   Division: Jaipur
  
  

No Recent News for RE/Rewari Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 8
Number of Halting Trains: 95
Number of Originating Trains: 29
Number of Terminating Trains: 29
Rating: 3.1/5 (56 votes)
cleanliness - good (7)
porters/escalators - average (7)
food - average (7)
transportation - average (7)
lodging - good (7)
railfanning - good (7)
sightseeing - average (7)
safety - good (7)

Nearby Stations

AMRI/Anaj Mandi 3 km     GKG/Gokalgarh 5 km     KWMD/Kumbhawas Mundhalia Dabri 6 km     KNGT/Karnawas 8 km     KGBS/Kishangarh Balawas 9 km     KIP/Khalilpur 10 km     KORI/Khori 11 km     NNU/Nangal Mundi 13 km     BWL/Bawal 16 km     PALI/Pali 16 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 206 blog entries  next>>
  
General Travel
0 Followers
429 views
Aug 14 2017 (23:13)   RE/Rewari Junction (8 PFs)

Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Entry# 2380506            Tags   Past Edits
DELHI-REWARI section will be electrified in just 9 MONTHS.. Means in June, 2018 Delhi-Alwar section or Delhi-Mathura via Alwar will be fully elctric

  
261 views
Aug 15 2017 (20:42)
Aditya*^~   4565 blog posts   2416 correct pred (69% accurate)
Re# 2380506-1            Tags   Past Edits
I think in this press release, IR is referring Gurgaon as "Gurugram". which is a mistake. haryana government has changed city name. Station name is still Gurgaon

  
198 views
Aug 16 2017 (01:38)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2380506-2            Tags   Past Edits
Yes

  
198 views
Aug 16 2017 (01:41)
©THE DARK LORD™~   394 blog posts
Re# 2380506-3            Tags   Past Edits
Ye press release nahi akhbaar ka article hai. Gaur se dekhiye.

  
166 views
Aug 16 2017 (05:58)
Aditya*^~   4565 blog posts   2416 correct pred (69% accurate)
Re# 2380506-4            Tags   Past Edits
at the end of article it is written neeraj sharma CPRO northern railway
  
General Travel
0 Followers
457 views
Aug 14 2017 (23:22)   DEE/Delhi Sarai Rohilla (5 PFs)

Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Entry# 2380515            Tags   Past Edits
Details of Delhi Sarai Rohilla to Rewari electrification

  
254 views
Aug 15 2017 (12:47)
★★★BRC WAP 7😎~   1409 blog posts   1920 correct pred (90% accurate)
Re# 2380515-1            Tags   Past Edits
sp ssp tss... please explain me

  
265 views
Aug 15 2017 (16:09)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2380515-2            Tags   Past Edits
#ELECTRIFICATION DETAILS:------>
Sectioning and Paralleling Post (SP)
These posts are situated approximately midway between feeding posts marking the demarcating point of two zones fed from different phases from adjacent sub-stations. At these posts, a neutral section is provided to make it impossible for the pantograph of an electric locomotive or EMU train to bridge the different phases of 25 kV supply, while passing from the zone fed from one sub-station to the next one. Since the neutral section remains 'dead', warning boards are provided in advance to warn and remind the Driver
...
more...
of an approaching electric locomotive/EMU to open locomotive circuit breaker (DJ) before approaching the 'neutral section', to coast through it and then switch 'on' on the other side. Special care is taken in fixing the location of neutral sections, on level tangent tracks far away from signals, level crossing gates etc. to ensure that the train coasts through the neutral section at a sufficiently high speed, to obviate the possibility of its stopping and getting stuck within the neutral section.
A paralleling interruptor is provided at each 'SP' to parallel the OHE of the up and down tracks of a double track section, 'bridging interrupters' are also provided to permit one feeding post to feed beyond the sectioning post upto the next FP if its 25 kV supply is interrupted for some reasons. These bridging interruptors are normally kept open and should only be closed after taking special precautions as detailed in these rules.
Sub-Sectioning and Paralleling Post (SSP)
One or more SSPs are provided between each FP and adjacent SP depending upon the distance between them. In a double track section, normally three interruptors are provided at each SSP i.e. two connecting the adjacent sub-sectors of up and down tracks and one for paralleling the up and down tracks.
Source:
click here
  
★  General Travel
0 Followers
750 views
Aug 12 2017 (12:15)   DEE/Delhi Sarai Rohilla (5 PFs)

Railway privatisation is must^~   84441 blog posts   5303 correct pred (78% accurate)
Entry# 2378131            Tags   Past Edits
MR @sureshpprabhu (Thru VideoLink) & MoS(IC) @Rao_InderjitS laid the foundation Stone for #Electrification of Delhi-RewariLine
@RailMinIndia click here

1 posts - Sat Aug 12, 2017

  
586 views
Aug 12 2017 (14:19)
taruncru~   108 blog posts   70 correct pred (71% accurate)
Re# 2378131-8            Tags   Past Edits
Rewari Bikaner section ka kab hoga...

  
575 views
Aug 12 2017 (14:21)
Gaurav Sharma   8620 blog posts   434 correct pred (59% accurate)
Re# 2378131-9            Tags   Past Edits
Bahut time legega BKN tak aane me..

  
571 views
Aug 12 2017 (14:23)
Railway privatisation is must^~   84441 blog posts   5303 correct pred (78% accurate)
Re# 2378131-10            Tags   Past Edits
Hatheli per sarson uga rahe ho aap...
Abhi bahut time h usme..

  
535 views
Aug 12 2017 (15:41)
rahultup380   160 blog posts   1 correct pred (100% accurate)
Re# 2378131-11            Tags   Past Edits
Electrification upto Suratgarh is already sanctioned

  
404 views
Aug 13 2017 (01:50)
Electrified100~   101 blog posts
Re# 2378131-12            Tags   Past Edits
Oh! High Rise till Gurgaon. Matlab freights jyaadatar Gurgaon tak hi ruk jaayenge. Double Stacked Containers bhi bas Garhi Harsaru tak jaayenge I think!
  
★  General Travel
0 Followers
1308 views
Aug 01 2017 (09:53)   54086/Rewari-Delhi Passenger (UnReserved) | RE/Rewari Junction (8 PFs)

Waiting of Placement 😍^~   1277 blog posts   5474 correct pred (77% accurate)
Entry# 2367764            Tags   Past Edits
**Attention**
Update of Rewari-Delhi electrification as on 31/07/2017
-- Poles and wiring done upto the point where Re-Dli and Re-Jhajjjar line separates (see in pic)
-- for poles digging work is doing at 3 places , at 2 places it looks work was starting of day itself , at one place about 25-30 holes were made for poles and working staff was doing at
...
more...
all 3 places.
**Hope the work will complete as soon as possible.**

1 posts - Tue Aug 01, 2017

  
781 views
Aug 01 2017 (14:47)
Electrified100~   101 blog posts
Re# 2367764-4            Tags   Past Edits
Yeah March next year tak CRS due hai! Gurgaon bhi Under Wire aa jaayega!!! :D

  
715 views
Aug 01 2017 (17:14)
Railway privatisation is must^~   84441 blog posts   5303 correct pred (78% accurate)
Re# 2367764-5            Tags   Past Edits
2017 ker do usko.

  
697 views
Aug 01 2017 (17:14)
Railway privatisation is must^~   84441 blog posts   5303 correct pred (78% accurate)
Re# 2367764-6            Tags   Past Edits
6 mnth delay confirm h.

  
826 views
Aug 03 2017 (08:43)
Bhiwani*^   544 blog posts   198 correct pred (76% accurate)
Re# 2367764-7            Tags   Past Edits
Delhi - Rewari #electrification work will start from 8 Aug 2017

  
543 views
Aug 03 2017 (14:03)
Electrified100~   101 blog posts
Re# 2367764-8            Tags   Past Edits
Haha, newspaper waalo ne Bandikui ka bhi electrification kar diya!
  
Pics of today's journey in 54086...
12216 BDTS-DEE GR and its link

1 posts - Mon Jul 31, 2017

  
★  
Jul 31 2017 (23:05)
Waiting of Placement 😍^~   1277 blog posts   5474 correct pred (77% accurate)
Re# 2367576-2            Tags   Past Edits
Lucknow mail and Dee-Udhampur ACExp

  
907 views
Jul 31 2017 (23:10)
Waiting of Placement 😍^~   1277 blog posts   5474 correct pred (77% accurate)
Re# 2367576-3            Tags   Past Edits
Ashram Exp with its link getting ready for departure from delhi

  
905 views
Jul 31 2017 (23:12)
Waiting of Placement 😍^~   1277 blog posts   5474 correct pred (77% accurate)
Re# 2367576-4            Tags   Past Edits
Poorabiya with its link at Delhi

  
897 views
Jul 31 2017 (23:16)
Waiting of Placement 😍^~   1277 blog posts   5474 correct pred (77% accurate)
Re# 2367576-5            Tags   Past Edits
some locos performing shunting work near Delhi

  
710 views
Aug 01 2017 (09:45)
Udit Mehta~   1969 blog posts   132 correct pred (61% accurate)
Re# 2367576-7            Tags   Past Edits
Awesome
Page#    Showing 1 to 5 of 206 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.