Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 08:32:04 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 08:32:04 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1101542-0
Details Edit
Large Station Board;
Entry# 1927788-0
Details Edit
Platform Pic; Large Station Board;
Entry# 802705-0
Details Edit
Small Station Board;
Entry# 713632-0

ROHA/Roha (3 PFs)
रोहे     रोहा

Track: Construction - Double-Line Electrification

Veer V D Savarkar Rd, Roha
State: Maharashtra

Elevation: 10 m above sea level
Zone: CR/Central   Division: Mumbai CSM Terminus
No Recent News for ROHA/Roha
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 54
Number of Originating Trains: 2
Number of Terminating Trains: 2
Rating: 3.1/5 (22 votes)
cleanliness - average (3)
porters/escalators - average (3)
food - average (3)
transportation - good (3)
lodging - good (3)
railfanning - good (3)
sightseeing - good (2)
safety - average (2)

Nearby Stations

NIDI/Nidi 4 km     NGTN/Nagothane 13 km     KOL/Kolad 13 km     INP/Indapur 24 km     KASU/Kasu 27 km     MNI/Mangaon 30 km     PEN/Pen 40 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 77 blog entries  next>>
  
★  Rail Fanning
0 Followers
4425 views
Apr 25 2017 (10:48)   12449/Goa Sampark Kranti Express | PNVL/Panvel Junction (7 PFs)

12238 Begampura Express~   946 blog posts   32 correct pred (73% accurate)
Entry# 2249660            Tags   Past Edits
Station boards captured during my recent trip with Goa Sampark Kranti express. The post contains Station Boards of Madgaon, Ratnagiri, Vadodra, Roha and Kota.
  
General Travel
0 Followers
702 views
Apr 29 2017 (12:20)   ROHA/Roha (3 PFs)

Pranav Sasidharan Achary   458 blog posts   2538 correct pred (62% accurate)
Entry# 2255556            Tags   Past Edits
Is Roha Panvel section completely electrified

  
415 views
Jun 03 2017 (18:38)
Ashutosh Singh   60 blog posts
Re# 2255556-1            Tags   Past Edits
Nahi electrification hoga
  
General Travel
0 Followers
1098 views
Jun 02 2017 (21:04)   22119/Mumbai CSMT - Karmali Tejas Express | ROHA/Roha (3 PFs)

Akshay Mahapadi~   267 blog posts   65 correct pred (78% accurate)
Entry# 2304884            Tags   Past Edits
Technical halt at Roha.
SRC : click here

  
989 views
Jun 02 2017 (21:10)
JOSH*^~   13785 blog posts   15265 correct pred (75% accurate)
Re# 2304884-1            Tags   Past Edits
Not a technical halt just Roha passing time given in the document..

  
872 views
Jun 03 2017 (11:56)
K   1145 blog posts   7 correct pred (100% accurate)
Re# 2304884-2            Tags   Past Edits
Only technical halt is Chiplun.
  
★  Rail Fanning
0 Followers
3230 views
Nov 05 2013 (12:20)   71089/Diva - Roha DEMU | ROHA/Roha (3 PFs)
 

Pŕāķāşh*^~   8139 blog posts   1243 correct pred (61% accurate)
Entry# 896899            Tags   Past Edits
Down the memorylane---Kurla/CLA WDS 4B loco which was earlier used to haul Diva-Roha-Diva Shuttle for a round trip of around 206 km.
For more pics and source: click here
  
General Travel
0 Followers
2416 views
Mar 19 2017 (10:39)   NGTN/Nagothane (3 PFs)

CAG Exposed DLW on WDG5 failure^~   83675 blog posts   5301 correct pred (78% accurate)
Entry# 2202608            Tags   Past Edits

  
1594 views
Mar 19 2017 (10:43)
CAG Exposed DLW on WDG5 failure^~   83675 blog posts   5301 correct pred (78% accurate)
Re# 2202608-1            Tags   Past Edits
Now railway will target Roha Veer doubling.

  
1698 views
Mar 19 2017 (10:56)
anish5569   325 blog posts
Re# 2202608-2            Tags   Past Edits
What about electrification?

  
1766 views
Apr 01 2017 (16:54)
CAG Exposed DLW on WDG5 failure^~   83675 blog posts   5301 correct pred (78% accurate)
Re# 2202608-4            Tags   Past Edits
Last leg of Electrified doubling Naguthane-Roha commissioned, help #Konkan bound trains considerably.#Maharashtra #MissionRailDevelopment
Page#    Showing 1 to 5 of 77 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.