Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Dec 3 16:16:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search


Large Station Board;
Entry# 933252-0
Platform Pic; Large Station Board;
Entry# 3868585-0

BHHZ/Behta Hajipur (1 PFs)
बेहटा हाजीपुर
بہٹا حاجی پور

Track: Single Electric-Line

Updated: Jul 19 2023 (09:50)


Behta Hajipur Railway Station (BHHZ) is located in the bustling town of Behta Hajipur, near Ghaziabad, Uttar Pradesh. The station features one platform and is a major hub for local commuters. While amenities are basic, the station offers a glimpse into the vibrant life of the region, with nearby markets offering local handicrafts and street food.

Tourism

Shri Ram Mandir: A revered temple dedicated to Lord Rama.
Shree Hanuman Mandir: A famous temple dedicated to Lord Hanuman.
Baba Shyam Mandir: A popular temple known for its spiritual significance.
Jama Masjid: A historic mosque with intricate architecture.
Gurudwara Sahib: A serene Gurudwara offering a peaceful atmosphere.

Food

Haldiram's: Popular chain for Indian sweets and snacks.
Sagar Ratna: Serves South Indian vegetarian dishes.
Bikanerwala: Known for its delicious North Indian snacks and sweets.
Raju Chaat: Offers a wide variety of chaat and street food.
Shreeji Restaurant: Serves traditional Gujarati vegetarian thalis.

Station Address

Rahul Garden, Behta Hazipur, Ghaziabad, Uttar Pradesh 201102
State: Uttar Pradesh

Elevation: n/a
Type: Regular   Category: HG-3
Zone: NR/Northern   Division: Delhi


No Recent News for BHHZ/Behta Hajipur
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 18
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 1.6/5 (8 votes)
cleanliness - poor (1)
porters/escalators - poor (1)
food - poor (1)
transportation - poor (1)
lodging - poor (1)
railfanning - good (1)
sightseeing - poor (1)
safety - poor (1)

Station Forum

Page#    Showing 1 to 4 of 4 blog entries  
Travel Question
166108 views
1

Feb 03 2021 (21:34)   BHHZ/Behta Hajipur (1 PFs)
kirk781^~   4661 blog posts
Entry# 4865913            Tags  
Does this station come inside Delhi city? Also, is there any metro connectivity anywhere nearby to this?
Translate to English
Translate to Hindi

More Posts
General Travel
228384 views
2

Oct 05 2018 (00:13)   74021/Delhi - Saharanpur DEMU | BHHZ/Behta Hajipur (1 PFs)
Ankit^~
Ankit^~   9778 blog posts
Entry# 3868585            Tags  
BHHZ station board.
Translate to English
Translate to Hindi
General Travel
185458 views
0

Oct 27 2015 (09:55)   SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
 
SunilKulkarni~
SunilKulkarni~   2007 blog posts
Entry# 1629809            Tags   Past Edits
Railway infrastructure projects worth Rs.1 trillion to be completed during 2015-18
Much-awaited Namma Metro to get fully commissioned by March 2016
As per CMIE’s CapEx database, railway infrastructure projects worth Rs.1 trillion are likely to get commissioned during 2015-18. Of these, projects entailing an investment of Rs.390.6 billion are likely to come on stream in 2015-16. Four projects worth Rs.26.4 billion have got completed in the first half of the ongoing year.
The
...
more...
much-awaited Namma metro or Bangalore metro Phase-I (a length of 42 km) is expected to get fully commissioned by March 2016. It is one of the six projects monitored by Prime Minister Narendra Modi under the Pro-Active Governance and Timely Implementation (PRAGATI) platform. As of now, 19.1 km of the total network is functional. Another 6.4-km stretch between Mysuru road and Magadi road will be opened to public by December 2015. A total of Rs.138.5 billion is estimated to be invested to build this rail network.
Other Major Projects to be completed by 2016 second half
Northeast Frontier Railways--> Lumding-Silchar-Jiribam BGProject--> Cost 51 billion Rs
East Central Railway--> Patna-Hajipur Ganga Bridge Project--> 29.2 billion Rs
Rapid Metrorail Gurgaon South Ltd.--> Gurgaon Metro Rail LinkPhase-II Project--> Cost 21.4 billion Rs
Rail Vikas Nigam Ltd.--> Daund-Gulbarga Doubling Project--> 15.1 billion Rs
Rail Vikas Nigam Ltd.--> Vijaywada-Machilipatnam-Bhimavaram Line Doubling & Electrification Project--> 15 Billion Rs
During 2016-18, Rs.612.7 billion worth of projects are scheduled for completion. Most of the large projects expected to come up during this period concern with the development of metro lines and broad gauge railway lines. Details of some of these projects are mentioned below:-
The Rs.30.9 billion-worth Badarpur-Faridabad metro line will be fully operational by December 2017. In September 2015, the 13.8-km long Badarpur-YMCA Chowk stretch covering nine stations was inaugurated. The 3.2 km-YMCA Chowk-Ballabgarh line with two more stations will be added by December 2017. The project aims to offer direct connectivity to residents of Faridabad with various parts of Delhi and vice-versa.
The second phase of Mumbai Monorail project between Wadala Depot and Jacob Circle, a distance of 11.2 km, is scheduled for completion in June 2016. The first phase of monorail corridor from Chembur to Wadala Depot (8.8 km) was launched in February 2014. The total cost of the project is pegged at Rs.30 billion.
The construction of broad gauge on Agartala-Udaipur-Sabroom railway line is expected to be completed at a cost of Rs.28.8 billion. The Agartala-Udaipur section (44 km) will be ready by March 2016 and work on the remaining stretch of Udaipur-Sabroom (68 km) is likely to get over by March 2018.
With an investment of Rs.28.5 billion, City and Industrial Development Corporation (CIDCO) will complete Phase-I of the Navi Mumbai Metro project by May 2017. It will cover a distance of 11.1 km along eleven stations between Belapur and Pendhar.
A broad gauge railway line from Bairabi to Sairang in the state of Mizoram will be built by March 2018. The scope of the project involves the construction of 23 tunnels of nine kms along with 36 major bridges and 147 minor bridges. A cost of Rs.28.2 billion is likely to be incurred in completing the project.
click here

Translate to English
Translate to Hindi

More Posts
Info Update
222153 views
6

Dec 13 2013 (09:19)   BHHZ/Behta Hajipur (1 PFs)
 
guest   0 blog posts
Entry# 933252            Tags  
first#sb
click here
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 4 of 4 blog entries  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy