Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jul 25, 2017 06:19:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jul 25, 2017 06:19:55 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 401642-0
Details Edit
Large Station Board;
Entry# 812011-0
Details Edit
Large Station Board;
Entry# 2106978-0

STP/Sitapur (3 PFs)
سیتاپور     सीतापुर

Track: Construction - Gauge Conversion

Sitapur National Highway 24, Avas Vikas Colony, Sitapur
State: Uttar Pradesh

Elevation: 140 m above sea level
Zone: NER/North Eastern   Division: Lucknow NER
No Recent News for STP/Sitapur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 1
Number of Terminating Trains: 1
Rating: 4.8/5 (15 votes)
cleanliness - excellent (2)
porters/escalators - excellent (2)
food - good (2)
transportation - excellent (2)
lodging - excellent (1)
railfanning - excellent (2)
sightseeing - excellent (2)
safety - excellent (2)

Nearby Stations

STRK/Sitapur Cutchery 1 km     SPC/Sitapur City Junction 3 km     KB/Khairabad Awadh 6 km     BUGN/Bhurjiha Baragn 9 km     TKUR/Tappa Khajuria Halt 10 km     KATA/Katili 11 km     JKP/Jharekapur 14 km     RAK/Ramkot 15 km     HMP/Hempur 15 km     PSN/Parsendi 16 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 48 blog entries  next>>
  
General Travel
0 Followers
592 views
Jul 18 2017 (11:03)   MLN/Mailani Junction (3 PFs)

©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Entry# 2355881            Tags   Past Edits
Pilibhit (PBE) - Mailani (MLN) section gauge conversion date finally has come and its expected that 67Km meter gauge route will undergo gauge conversion from 01-Nov-2017 as mega block for GC has been asked from #rvnl. If source to be trusted then deadline to complete project would be 01-Aug-2018. As on date its not clear to whom this tender has been allotted.

  
566 views
Jul 18 2017 (11:05)
Raja lare Raja se Praja jaye jaan se~   1633 blog posts   1 correct pred (100% accurate)
Re# 2355881-1            Tags   Past Edits
15307/08 1-1.5 saal mein BG hone wala hain

  
553 views
Jul 18 2017 (11:21)
©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Re# 2355881-2            Tags   Past Edits
Train 15307/Nainital Express (MG) नैनीताल एक्सप्रेस (एमजी) TPU/Tanakpur --> ASH/Aishbagh already became history as MLN-ASH section is under gauge conversion. Most probably by Sep;2017 ASH-STP route would be open and from Apr;2018 entire stretch (ASH-MNL) might be open for public.

  
238 views
Jul 22 2017 (18:46)
YAM1YCG1~   61 blog posts
Re# 2355881-3            Tags   Past Edits
PBE - MLN will be closed from 1 Nov 2017.
  
★  Info Update
0 Followers
2122 views
Jul 07 2017 (16:56)   STP/Sitapur (3 PFs)

©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Entry# 2345279            Tags   Past Edits
Aishbagh (ASH) - Sitapur (STP) 89Km section which is undergoing for gauge conversion since 15-May-2016 and as on date 80 to 90% work has been completed (Only track related; station building yet to get completed). If source to be believed a new intersection has been approved in GC where trains coming from Aishbagh (ASH) can go either to Sitapur (STP) or Sitapur Cantt. (SCC) which means new route from Aishbagh (ASH) to Shahjehanpur (SPN) will come in existence and this will server as alternative route from Lucknow junction (LJN) to Delhi (DLI/ANVT/NDLS) stations. This newly laid intersection will also help trains coming from Mailani (MLN) to go Gonda (GD) and Gorakhpur (GKP) route.
-
Added
...
more...
representation pic for future intersection.

  
1710 views
Jul 08 2017 (22:10)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   14310 blog posts   3067 correct pred (65% accurate)
Re# 2345279-1            Tags   Past Edits
good job bhai...

  
Thanks bhai...
  
★  Info Update
0 Followers
1203 views
Jun 27 2017 (15:04)   STP/Sitapur (3 PFs)

©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Entry# 2334402            Tags   Past Edits
On 25-Jun-2017 visited Sitapur junction (STP) and tried to detail the ASH-STP GC status report :
Track : 84 out of 86 km track laying has been completed however rest 2km pending track is from Lucknow area. Rail welding almost completed. Clipping is ongoing. Stone filling and finishing of track yet to start. At Sitapur railway station around 200 meters of track yet to get laid due to SCC-BUW single electric line which is operational. As on date no date been announced for taking mega block for laying 200 meters tracker (diamond crossing).
Signal
...
more...
: Cabling for signals has been almost completed for entire stretch however only couple of signals can be seen as on date. Couple of old MG signals still can be seen which either will be uprooted or may be updated.
Bridge : Construction or modification for all the major and minor bridges either been completed or almost completed. Gomti bridge which come in between Daliganj (DAL) and Lucknow city (LC) railway station is still under modification and expected to be completed by September 2017.
Buildings : Only 30 - 70% work has been completed for many railway stations which means many of the stations building might not be fully ready while CRS inspection or inauguration.
Overall status :
Aug;2017 - Track will be ready & light loco can run
Sep;2017 - Signal will be ready
Oct;2017 - Station basic infrastructure would be ready
Nov;2017 - CRS inspection can be requested
Dec;2017 - Section commencement can be expected
All above dates are tentative
  
Info Update
0 Followers
2027 views
May 26 2017 (11:21)   STP/Sitapur (3 PFs)

©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Entry# 2293562            Tags   Past Edits
RVNL, which is responsible for Aishbagh (ASH) - Sitapur (STP) sections gauge conversion, misses another deadline to complete GC of ASH-STP section. Now new deadline is Oct;2017 or Nov;2017 and this means (just assumption) CRS might be requested in month of Nov;2017 or Dec;2017 so on and average one can expect first broad gauge train in month of Jan;2018.
-
Special thanks to "☆गोंडा इलेक्ट्रिक शेङ ■☆*^~" for providing news link to forum.
News
...
more...
Entry# 303584 Blog Entry# 2293227
Source : click here
  
Info Update
0 Followers
6576 views
May 08 2017 (16:05)   STP/Sitapur (3 PFs)

©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Entry# 2268290            Tags   Past Edits
Lucknow (LJN) to Pilibhit (PBE) via Sitapur (STP) and Laknimpur (LMP) new deadline provide by planning commissioner for 2017-18 :
-
Aishbagh (ASH) - Sitapur (STP) section 86.83Km gauge conversion new deadline : Sep;2017
-
Sitapur
...
more...
(STP) - Mailani (MLN) section 106.92Km gauge conversion new deadline : Dec;2017
-
As on date there is no news on mega block for gauge conversion of rest 69.0Km Mailani (MLN) - Pilibhit (PBE) section.
-
Other section which comes under NER have received new commissioning dates too for gauge conversion :
-
Gonda (GD) - Bahraich (BRK) section 60Km gauge conversion new deadline : May;2017
-
Majhola (MJZ) - Tanakpur (TPU) section (under Bareilly (BE) -Pilibhit (PBE) -Tanakpur (TPU) total 101.79Km) 36Km gauge conversion new deadline : Jul;2017
-
Mandhana (MDA) - Brahmavart (BRT) section (under Kanpur (CNB) -Kasganj (KSJ) -Mathura (MTJ) total 552.90Km) 08Km gauge conversion new deadline : May;2017

1 posts - Mon May 08, 2017

  
5810 views
May 10 2017 (00:17)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   14310 blog posts   3067 correct pred (65% accurate)
Re# 2268290-2            Tags   Past Edits
😀😀bhaut slow hogaya h project

  
5163 views
May 14 2017 (02:01)
danielcox2000   1 blog posts
Re# 2268290-3            Tags   Past Edits
Do know when the remaining metre gauge lines in the area will close for GC?
Do you think they would still be running in September 2017?

  
4972 views
May 15 2017 (12:54)
©shuk™ RAILWAY My 1st crush~   665 blog posts   321 correct pred (56% accurate)
Re# 2268290-4            Tags   Past Edits
If source to be believed (LJN DRM and Planning commissioner) gauge conversion for Aishbagh (ASH) - Sitapur (STP) section would be completed in month of Sep 2017 so CRS can be expected in month of Oct 2017. If every thing goes as planned, which would not be, we can expect first DEMU in month of November 2017 or December 2017. Keep your fingers crossed.
Now coming to Sitapur (STP) - Mailani (MLN) section the tentative date for gauge conversion completion is Dec 2017 however, add three more month so said section could be operational by April 2018.

  
4099 views
May 22 2017 (19:11)
Shashank Srivastava   8 blog posts
Re# 2268290-6            Tags   Past Edits
Hopefully we shall enjoy a trip to ASH in the mid of OCT'2017..

  
4077 views
May 22 2017 (19:17)
HS GD SKD pride of NER~   2820 blog posts   73 correct pred (80% accurate)
Re# 2268290-7            Tags   Past Edits
ye jo MAY waali 3 deadlines haiinka MAY kya june july me aata hai
Page#    Showing 1 to 5 of 48 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.