Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Western Railway :- Dil Bole Baar Baar WR. WR - Abdul Rehman

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat Jun 19 03:50:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search
Large Station Board;
Entry# 2118234-0
Large Station Board;
Entry# 2118234-1
Scenic; Platform Pic; Large Station Board;
All credit goes to member #1867479 Rajiv. Check blog entry https.//indiarailinfo.com/blog/post/3200448
Entry# 3200448-0

AGT/Agthori (2 PFs)
আগিয়াঠুৰী     आगियाठरी

Track: Construction - Single-Line Electrification

Show ALL Trains
IIT Rd, North Guwahati, Dist - Kamrup Metropolitan
State: Assam

Elevation: 52 m above sea level
Zone: NFR/Northeast Frontier   Division: Lumding

No Recent News for AGT/Agthori
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station News

Page#    Showing 1 to 2 of 2 News Items  
Sep 20 2018 (10:46) Detailed project report for Rs 1,126.67 crore bridge sent to Railway Board for approval (www.assamtribune.com)
New Facilities/Technology
NFR/Northeast Frontier
0 Followers
21798 views

News Entry# 359179  Blog Entry# 3823557   
  Past Edits
This is a new feature showing past edits to this News Post.
GUWAHATI, Sept 19 - As a step towards fulfilling a long-standing demand of the people of Assam and the north-eastern region, the Northeast Frontier Railway Construction Organisation has completed the detailed project report (DPR) for a second rail-cum-road bridge at Saraighat over the River Brahmaputra.
The DPR, which puts the project cost of the 1.3 km bridge at Rs 1,126.67 crore, has been sent to the Railway Board for approval.
Speaking to The Assam Tribune, Senior Public Relations Officer (SPRO) of NFR (Construction) SK Ojah said that the new bridge, once completed, will
...
more...
eliminate the bottleneck at Saraighat which has come about due to the high capacity utilisation of the existing single-line railway bridge.
The proposed new bridge will have two railway tracks at lower deck, besides provision for a 9.5-metre wide road and 1.2-metre wide footpaths at the upper deck. It will be located at a distance of around 120 metres upstream (towards Guwahati side) from the existing rail-cum-road bridge.
It is part of the project of doubling of the existing single-track broad gauge line from Agyathuri to Kamakhya (of 7.06 km length). The project had been sanctioned in 2017-18.
At present, there are two bridges over the Brahmaputra at Saraighat. One of these is the existing rail-cum-road bridge which was commissioned in the early 1960s. This originally had provision for a two-line metre gauge railway track, which was later converted to single-line broad gauge track when gauge conversion work was undertaken, at the lower deck and a two-lane road at upper deck.
Besides, one road bridge with three-lane provision was commissioned on the downstream side from the rail-cum-road bridge by NHAI in 2017.
“Railway traffic from Guwahati (via Rangiya) passes through the existing rail-cum-road bridge. It is an important route which connects the north-eastern region with the rest of the country. However, the line capacity utilisation of the Kamakhya-Rangiya section is 167 per cent. Considering this, the doubling of New Bongaigaon-Rangiya-Agyathuri section was sanctioned in 2016-17. Besides, electrification of the New Bongaigaon-Guwahati section has also been sanctioned and physical work is already going on. However, double-line benefit of this section cannot be achieved until and unless the present bottleneck at Saraighat is eliminated,” said Ojah.
The single-line section from New Bongaigaon to Kamakhya (via Rangiya) is the most utilised section in this region.
“Traffic volume has increased steadily over the last few years and has already attained the level of saturation. Therefore, the need for augmentation of line capacity for the same has been felt for quite some time. So, the project of doubling of the existing broad gauge line from Agyathuri to Kamakhya, including the second rail-cum-road bridge at Saraighat over the Brahmaputra, will remove the bottleneck,” said the railway official.
Besides the estimated cost of Rs 1,126.67 crore for the main bridge, an additional cost of viaduct for connecting both the road approach and road deck slab has been fixed at Rs 238.61 crore.
“So, the total rail-cum-road bridge will cost Rs 1,365.28 crore. However, the State government will bear the Rs 238.61 crore for the approach road and road deck slab,” said Ojah.
Provision for power supply has been contemplated on the bridge. All the overhead electrical crossings on it will be modified as per revised regulations.
“It has been decided to have the overall length of the proposed new bridge same as the existing one (i.e. 1.3 km), with the same span configuration. The proposed alignment will run parallel to the existing broad gauge line from Agyathuri and will terminate at Kamakhya. For safety of foundation and sub-structures of both the existing bridges, it is planned to fix centre-line of the new proposed bridge at a distance of 120 metres on the upstream side of the existing single-line rail-cum-road bridge,” said the NFR (Construction) official.

18070 views
Sep 20 2018 (19:58)
ELoco entered in Assam
rajivmetal~   629 blog posts
Re# 3823557-1            Tags   Past Edits
Sir, do you know which year Broad Gauge came in Assam ?

Sep 20 2018 (20:23)
a2z
A2Z~   17178 blog posts
Re# 3823557-2            Tags   Past Edits
In about 1980-85 Trivendrum - NewBongaigaon Express used to operate
Nov 23 2013 (00:35) ARPA demands doubling of New Bongaigaon to Agthori railway line (www.sentinelassam.com)
New Facilities/Technology
NFR/Northeast Frontier

News Entry# 157671   
  Past Edits
Nov 23 2013 (3:40AM)
Station Tag: Agthori/AGT added by moderator**/12

Nov 23 2013 (3:40AM)
Station Tag: Rangiya Junction/RNY added by moderator**/12

Nov 23 2013 (3:40AM)
Station Tag: New Bongaigaon Junction/NBQ added by moderator**/12

Nov 23 2013 (12:35AM)
Station Tag: Guwahati/GHY added by Extend PSK Upto DBRG/311087
Posted by: xxx 332 news posts
GUWAHATI, November 21: Assam Rail Passenger Association (ARPA) has expressed their strong objection on the new justification forwarded by the North East Frontier Railway regarding the doubling of New Bongaigaon–Rangiya–Agthori (NBQ–RNY–AGT).
In a press meet organised in the city today, ARPA GS Dipankar Sharma has said that the stand taken by the Zonal HQ is ‘unexpected’ and ‘misleading’.
“It was just a demand raised by the people of Assam since long for construction of a 2nd line in the NBQ–RNY–AGT (BG–1) for which the Government of Assam, MPs, and all political parties, national
...
more...
organisations, passenger associations urged. Everybody lauded the Railway Budget this year for sanctioning the same. But we are surprised to see that inspite of initiating necessary steps, Zonal HQ of NFR, which was set up to expedite various developmental activities in NE Region, has sent a new justification for doubling again in NBQ–GLPT–KYQ section (BG–2) instead of BG–1,” Sharma added.
In a letter addressed to the Chairman, Railway Board, Rail Bhawan, New Delhi, the ARPA has mentioned that traffic density of BG–1 is much more higher than BG–2.
“Most of the Mail/Express trains including Rajdhani Express are being run through BG–1 having stoppages in many places like Bongaigaon, Barpeta Road, Nalbari, Rangiya etc. Line utilisation of BG–1 is 156 percent and BG–2 is 120 percent,” the letter stated.
The letter further stated that Rangiya is a Divisional HQ and a junction which connects Arunachal Pradesh and a part of Bhutan. Traffic around Rangiya will increase further after GS of Rangiya–Murongselek project.
It also stated that a big goods terminal is functioning at Changsari in BG–1.
“Reducing the cost, the abandoned MG line and substructures of bridges can be used for the 2nd line in BG–1,” the letter stated, adding, “BG–1 passes through densely populated and commercial places giving highest earnings from fare and freight.”
“It is clear that Railway Ministry has rightly sanctioned the doubling proposal up to Guwahati. While China is providing all sort of communication to their border areas, people of Assam also want a strong infrastructure here. So we fail to understand how a new justification can rise now ignoring BG–1 and undermining the necessity to the local people of Assam. Let BG–1 get a 2nd line first and then BG–2 in next phase. Under the given circumstances, we strongly urge upon you all to reject the so called fresh justification of the bureaucrat concerned who was posted here to run NFR more effectively. We hope necessary arrangement will be therefore taken for doubling BG–1 without further delay,” the letter addressed to the Railway Board chairman further added.
Page#    Showing 1 to 2 of 2 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy