Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

There is no more pure joy than RailFanning.

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Thu Jun 24 06:00:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

ANU/Anangur (2 PFs)
ஆனங்கூர்     आनंगूर

Track: Double Electric-Line

Show ALL Trains
Kumarapalayam-Tirucengodu Rd, Nettavelampalayam,Anangur ph.no.04288-274811
State: Tamil Nadu

Elevation: 221 m above sea level
Zone: SR/Southern   Division: Salem

No Recent News for ANU/Anangur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 8
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.1/5 (6 votes)
cleanliness - average (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - good (1)
lodging - poor (1)
railfanning - good (1)
sightseeing - good (1)
safety - good (1)
Show ALL Trains

Station News

Page#    Showing 1 to 2 of 2 News Items  
May 06 2020 (16:59) Indian Railways renovates century-old railway bridge in record time amid COVID-19 lockdown; details (www.financialexpress.com)
IR Affairs
SR/Southern
0 Followers
15116 views

News Entry# 406914  Blog Entry# 4623254   
  Past Edits
May 06 2020 (17:02)
Station Tag: Cauvery/CV added by Gondia Samnapur electrified~/1327025

May 06 2020 (17:02)
Station Tag: Anangur/ANU added by Gondia Samnapur electrified~/1327025
Stations:  Cauvery/CV   Anangur/ANU  
Among many major renovation works that were conducted during the lockdown period, the national transporter has successfully completed the rehabilitation of a Brick Arch bridge in a record time of 36 hours.
Indian Railways renovates a century-old railway bridge in record time! Despite the country still under lockdown due to the COVID-19 outbreak, Indian Railways is utilizing this time to complete its repair and maintenance work. Among many major renovation works that were conducted during the lockdown period, the national transporter has successfully completed the rehabilitation of a Brick Arch bridge in a record time of 36 hours. This bridge was originally built in 1862. According to details shared by the Southern Railway Zone, the century-old railway bridge is located at
...
more...
Km 384/900-384/000 on downline between Anangur – Caveri railway stations (near Erode). The existing railway bridge, which falls under Salem Division, is of Brick Arch consisting of three spans of 9.15 metres.
According to Southern Railways, the existing railway bridge was proposed to be replaced with RCC segmental boxes comprising four spans of 6.6 metres wide. Initially, the rehabilitation work was planned to be carried out with two temporary girders of 60 feet with crib support in the centre.
However, keeping in view the operation of less train services during this nationwide lockdown period due to the novel coronavirus pandemic, the national transporter decided to rebuild directly without temporary girder for a continuous 36 hours block. The rebuilding work of the railway bridge was taken up at 8.00 AM on 4 May 2020 and the work completed at 5.00 PM on 5 May 2020. During this period, all the train services dealt on the single line between 3 stations i.e. Sankaridurg to Erode, the zone stated.
Recently, the Railway Ministry issued a statement saying that during this lockdown period when all passenger train services are cancelled due to COVID-19, several long-pending repair and maintenance works like Yard remodeling, renewal of scissors crossover, repairs of bridges, rail tracks have been carried out by Indian Railways. Besides, many pre-monsoon works have also been conducted to prevent the disruption of train services during the rainy season.
Feb 07 2015 (14:00) Experimental stoppage for 6 months of trains (www.thehindu.com)
Temporary Stops
SR/Southern

News Entry# 211726   
  Past Edits
Feb 07 2015 (2:00PM)
Station Tag: Anangur/ANU added by Vaibhav Agarwal*^/432532

Feb 07 2015 (2:00PM)
Station Tag: Mavelipalaiyam/MVPM added by Vaibhav Agarwal*^/432532
The Coimbatore – Salem – Coimbatore Mainline Electric Multiple Unit (MEMU) passenger trains and the Erode – Mettur Dam – Erode passenger trains will temporarily stop at Anangur and Mavelipalayam railway stations, for a period of six months from February 14, on an experimental basis.
A press release of the Salem Railway Division issued here on Friday said that the train No. 66602 Salem – Coimbatore MEMU will depart from Mavelipalayam at 2.10 p.m. and Anangur at 2.23 p.m.
The train No. 66603 Coimbatore – Salem passenger will depart from Anangur at 11.51
...
more...
a.m. and Maveliapalayam at 12.08 p.m.
Erode passenger
Train No.56101 Mettur Dam – Erode Passenger will depart from Mavelipalayam at 8.38 p.m. and Anangur at 8.57 p.m.
The train No. 56100 will depart from Anangur at 5.15 a.m. and Mavelipalayam at 5.33 a.m., the release said.
Page#    Showing 1 to 2 of 2 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy