Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Antyodaya Express: The best a common man can get. - Vikas Kumar

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Thu Aug 18 01:29:24 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Front Entrance - Outside; Large Station Board;
Entry# 2356346-0
Medium; Platform Pic; Large Station Board;
Entry# 2120183-0


DVG/Davangere (2 PFs)
ದಾವಣಗೆರೆ     दावणगेरे

Track: Construction - Double-Line Electrification

Show ALL Trains
State Highway 76, Davanagere
State: Karnataka


Zone: SWR/South Western   Division: Mysuru (Mysore)

No Recent News for DVG/Davangere
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 82
Number of Originating Trains: 0
Number of Terminating Trains: 0
1 Follows
Rating: 3.9/5 (33 votes)
cleanliness - good (4)
porters/escalators - good (4)
food - good (4)
transportation - good (4)
lodging - good (4)
railfanning - excellent (4)
sightseeing - good (4)
safety - good (5)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 84 News Items  next>>
Jul 08 (23:27) Bengaluru Hubballi Railway Electrification to complete by Feb’23 (hubballidharwadinfra.com)
New Facilities/Technology
SWR/South Western
0 Followers
28483 views

News Entry# 491615  Blog Entry# 5406281   
  Past Edits
Jul 08 2022 (23:28)
Station Tag: Dharwad/DWR added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Davangere/DVG added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Harihar/HRR added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Birur Junction/RRB added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: SMM Haveri/HVR added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Tolahunse/THN added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Arsikere Junction/ASK added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Hosadurga Road/HSD added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Chikjajur Junction/JRU added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: Nittur/NTR added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by बिप्लब कागयुगँ/1329476

Jul 08 2022 (23:28)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by बिप्लब कागयुगँ/1329476
Bengaluru to Hubballi Railway Electrification works is progressing in brisk pace and is expected to be completed by first quarter of 2023 (February 2023).
As of now, the section in between Bengaluru to Nittur and Chikkajajur to Hosadurga Road has been completely electrified and CRS inspection has also been completed.
According to CORE, The 69Rkm section in between Nittur to Arsikere and 37 Rkm section in between Chikkajajur to Tolahunase will be electrified by September 2022.
The
...
more...
final part of the work i.e 146 Rkm section in between Tolahunase – Haveri – Hubballi is likely to be completed by February 2023 as per Central Organization for Railway Electrification (CORE).
The electrification of the entire stretch from Bengaluru to Hubballi is being executed simultaneously at different locations to complete the project soon.
OHE foundation work is in progress on between Arsikere and Birur. Poles have been erected and wiring has been completed in between Birur junction and Chikkajajur.
Chikkajajur railway station is fully electrified and CRS has also been completed (part of Chikkajajur-Hosadurga project). OHE foundation work in progress between Davanagere outer and Harihar.
Central government has planned to run Vande Bharat express train in between Bengaluru and Dharwad. For that, electrification in between Bengaluru and Hubballi needs to be completed.
South Western Railways (SWR) is expediting all the electrification projects in Karnataka. Marching towards mission 100% electrification, SWR has electrified 511.7 RKM in a year (Highest ever!).
Jun 07 (12:47) Works on new Davangere-Tumakuru railway line to begin soon (www.deccanherald.com)
New Facilities/Technology
SWR/South Western
0 Followers
23632 views

News Entry# 488487  Blog Entry# 5370246   
  Past Edits
Jun 07 2022 (12:47)
Station Tag: Molakalmuru/MOMU added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Shivamogga Town (Shimoga)/SMET added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Hosadurga Road/HSD added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Holalkere/HLK added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Davangere/DVG added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Tumakuru (Tumkur)/TK added by Tankapur to Pithoragarh new Railline/48335

Jun 07 2022 (12:47)
Station Tag: Chitradurga/CTA added by Tankapur to Pithoragarh new Railline/48335
The land acquisition process of the much-awaited Davangere-Chitradurga-Tumakuru rail line is nearing completion and the works for laying of tracks will be set in motion soon, said Union Minister A Narayanaswamy.
Speaking to repoers here on Sunday, Narayanaswamy said, “About 80% of land acquisition process for Davangere-Tumakuru direct rail line has been completed. Soon the works for the new rail line will begin.”
Listing out the achievements of eight years of the Modi government and the funds released for the development of his home district, the minister said, the Centre had set aside
...
more...
Rs 873 crore for the development of highways that pass through the district, including the Holalkere-Hosadurg stretch and in Molakalmur taluk. Also, works on Chitradurga-Shivamogga highway are underway.
Apr 26 (15:55) IISc proposes High Speed Rail from Bengaluru to Hubballi (hubballidharwadinfra.com)
New Facilities/Technology
SWR/South Western
0 Followers
40405 views

News Entry# 484271  Blog Entry# 5325580   
  Past Edits
Apr 26 2022 (15:55)
Station Tag: Challakere/CHKE added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: Davangere/DVG added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: Chitradurga/CTA added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: Tumakuru (Tumkur)/TK added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: Yesvantpur Junction/YPR added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by Tankapur to Pithoragarh new Railline/48335

Apr 26 2022 (15:55)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by Tankapur to Pithoragarh new Railline/48335
Indian Institute of Science (IISc), Bengaluru has proposed a High Speed Rail (HSR) corridor from Yeshwantpura in Bengaluru to the Commercial Centre of North Karnataka, Hubballi.
According to a report published in Times of India, the High speed rail corridor will have a route length of 400km, and it can be taken up along the current railway network.
IISc has proposed 5 stations along the corridor at Yeshwantpura (near IISc campus), Tumakuru, Chitradurga (near IISc new campus at Challakere), Davanagere and Hubballi.
As
...
more...
of now, India does not have any High Speed Rail corridors, or lines operating at 200 km/h or above. But the country have proposed many HSRs. The details are as follows.
The first High Speed Rail corridor of length 508km is already under construction between Mumbai and Ahmedabad. The HSR will have a top operational speed of 320km/h.
The corridor will use Standard Gauge and will be built with Shikansen technology of Japan. It is expected to carry passengers within three hours and the fare expected to be less than flight fares.
Few other High Speed Rail Corridors proposed in India and expected completion of construction is as follows:
Saransh Sahu, a former M.tech student at IISc and Ashish Verma has presenting a research paper titled ‘Quantifying wider economic impacts of HSR connectivity in Karnataka’.
According to them, Inter-regional high-speed connectivity and accessibility through public transportation modes such as High Speed Rail is crucial for sustainable and uniform development.
However, it can be a costly affair considering the enormous capital it requires against direct user benefits.

Rail News
31417 views
Apr 27 (15:25)
irifan2015
irifan2015   1631 blog posts
Re# 5325580-1               Past Edits
Request IISc to undertake a study the possibilities and feasibilities of running on existing tracks following:
1. a good Super Fast train between Bangalore and Mumbai covering the distance in 16 hours.
2. running a AC Super Fast between Bangalore and Delhi via Davangere Hubballi Pune Vadodara.
3. More importantly, ways and means for running frequent trains from Bangalore City station to Airport.
...
more...

Dream projects can be thought of later. First let us get essential trains. ಮೊದಲು ಹೊಟ್ಟೆಗೆ ಹಿಟ್ಟು ನಂತರ ಜುಟ್ಟಿಗೆ ಮಲ್ಲಿಗೆ ಹೂವು.

30402 views
Apr 27 (17:05)
నరసాపుర్ మైసూర్ రైలు వేయాలి
saikarthik148~   2058 blog posts
Re# 5325580-2              
😂 first open smvb (inaguration of sir mokshagunda visvesvaraya terminal) later we can think high speed or semi high speed trains

33539 views
Apr 27 (17:16)
Rayalaseema state
krnt_vskp_express~   4898 blog posts
Re# 5325580-3              
Lets have one at least before talking to others. Not sure if someone has already done RoR calculation , I wanted to see RoR before taking it further
Apr 19 (11:05) Bengaluru-Hubballi train travel to take 1 hour less by 2023 (www.deccanherald.com)
0 Followers
63222 views

News Entry# 483702  Blog Entry# 5309147   
  Past Edits
Apr 19 2022 (11:05)
Station Tag: Arsikere Junction/ASK added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: SMM Haveri/HVR added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Ranibennur/RNR added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Birur Junction/RRB added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Tumakuru (Tumkur)/TK added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Harihar/HRR added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Yesvantpur Junction/YPR added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Davangere/DVG added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by Hala Madrid 🇪🇸/443440

Apr 19 2022 (11:05)
Station Tag: Gadag Junction/GDG added by Hala Madrid 🇪🇸/443440
IN BRIEF:
However, even the fastest train between the two cities – Jan Shatabdi Express – still takes a minimum of 7 hours
Travel time between Bengaluru and Hubballi will come down by 1 hour from next year as the South Western Railway (SWR) has set the target of completing the doubling and electrification of the entire line by March 2023.
A major trunk
...
more...
route, the Bengaluru-Hubballi section sees operation of 24 trains, including nine daily trains.
However, even the fastest train between the two cities – Jan Shatabdi Express – still takes a minimum of 7 hours, against the specified travel time of 6 hours 30 minutes, to complete the 469-km journey.
Officials said the works on two key sections of the route, which were held up due to delay in land acquisition on a 45-km stretch, have been speeded up.
As a result, doubling and electrification of the Hubballi south station-Saunshi (20 km) and Devaragudda-Haveri (25 km) sections are set to be completed by the end of the year.
Chief public relations officer Aneesh Hegde said the land acquisition problems have been resolved.
“The electrification target was 342.9 route km. The Chikjajur-Hubballi (190 route km) and Nittur-Hosadurga (152.9 route km) will be completed soon. Our priority is to reduce the travel time by 45 minutes to 1 hour at the earliest,” he said.
Asked about the possibility of installing the inter-block signalling system (IBS), he said all the signalling will be solid state electronic interlocking systems, which are state of the art and come with built-in fail-safe mechanisms.
“IBS is needed only when the section gets saturated and if we want to divide a block section into two, to increase section capacity. By doubling, the capacity of the route will increase by approx 40%. The current progress of work has already helped in speeding up of several trains, notably Rani Chennamma Express. We will work to speed up other trains,” he said.
Karnataka Railway Vedike’s Krishna Prasad said the Railways had the capacity to reduce the travel time between the two cities to 5 hours 30 minutes.
“It is a trunk route that will benefit the north Karnataka region. The Railways should complete the doubling and electrification work on the entire line between Bengaluru and Miraj soon. Major work is pending on Miraj-Londa and Londa-Hubli sections. In the coming years, the travel demand on the route will go up and officials should plan accordingly,” he said.
Mar 21 (11:19) Railway police rescue passenger from falling on track (www.deccanherald.com)
Commentary/Human Interest
SWR/South Western
0 Followers
13823 views

News Entry# 480946  Blog Entry# 5249135   
  Past Edits
Mar 21 2022 (11:19)
Station Tag: Davangere/DVG added by Extend 07378 to Kalaburagi Bidar/48335

Mar 21 2022 (11:19)
Train Tag: Siddhaganga SF Express/12726 added by Extend 07378 to Kalaburagi Bidar/48335
Stations:  Davangere/DVG  
The video footage of the incident was recorded in surveillance cameras in the railway station and it has done viral on social media now
Railway Police, on Saturday, rescued a passenger who slipped and fell on the platform when he was boarding the moving train and the video has gone viral on social media networking sites.
Hubballi-Bengaluru Inter-City -Siddaganga Express arrived at Davangere and it started departing the railway station after two to three minutes. A family rushed towards the train with the baggage. A woman and children boarded the moving train and the man lost
...
more...
his balance and fell while he was boarding the train with baggage.
Railway police Nagaraj B R who was there at the station pulled him towards the platform and rescued him. Later, the train was stopped and he boarded the train.  
The video footage of the incident was recorded in surveillance cameras in the railway station and it has done viral on social media now.
Page#    Showing 1 to 20 of 84 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy