Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Money is nothing; RailFanning is Everything

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat Oct 16 23:36:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search
no description available
Entry# 4043797-0
Medium; Front Entrance - Outside; Large Station Board;
Entry# 4671885-0


GDN/Gangaikondan (2 PFs)
கங்கைகொண்டான்     गंगैकोन्डान

Track: Double Electric-Line

Show ALL Trains
Gangaikondan Railway Station,Thoothukudi, 627359
State: Tamil Nadu

Elevation: 45 m above sea level
Zone: SR/Southern   Division: Madurai

No Recent News for GDN/Gangaikondan
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 7
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station News

Page#    Showing 1 to 1 of 1 News Items  
Jun 18 2019 (11:14) Phase 1 of Madurai-Tuticorin double line by December (timesofindia.indiatimes.com)
New Facilities/Technology
SR/Southern
0 Followers
52896 views

News Entry# 384461  Blog Entry# 4345867   
  Past Edits
Jun 18 2019 (11:15)
Station Tag: Gangaikondan/GDN added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 18 2019 (11:15)
Station Tag: Tattapparai/TIP added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 18 2019 (11:15)
Station Tag: Kadambur/KDU added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 18 2019 (11:15)
Station Tag: Vanchi Maniyachchi Junction/MEJ added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 18 2019 (11:15)
Station Tag: Tuticorin/TN added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 18 2019 (11:14)
Station Tag: Madurai Junction/MDU added by 12649⭐️ KSK ⭐️12650^~/1203948
MADURAI: Rail Vikas Nigam Limited (RVNL), which has taken up the doubling and electrification work of the Madurai-Tuticorin (through Vanchi Maniyachi) and Vanchi Maniyachi-Nagercoil sections, said that the first phase of 44 km is likely to be completed before the end of 2019. It includes 30 km from Kadambur to Thattaparai in Tuticorin district and 14 km from Vanchi Maniyachi to Gangaikondan in Tirunelveli district.Despite the constraints in getting soil from waterbodies for the formation works and acquisition of land for the major stretch, officials expressed confidence that the entire 260.8 km – in the two stretches – will be completed in four phases by October 2021. The 158.8-km Madurai-Tuticorin doubling work carried out at Rs 1,182 crore is expected to be completed by July 2021.The remaining 102 km from Vanchi Maniyachi to Nagercoil to be laid at Rs 1,004 crore is expected to be finished by October 2021, a senior...
more...
RVNL official told TOI. Work on these two major sections, at total cost of Rs 2,186 crore, commenced in July 2018. “Priority was to complete the Madurai-Virudhunagar stretch. But it is taking place at a very slow pace due to the constraints in getting soil from waterbodies,” he said.He said that around 14 lakh to 15 lakh cubic meter soil is needed for formation works for the tracks – before blue metal, sleepers and tracks are laid – for the entire stretch. “This has to be collected from nearby waterbodies. Like the sand mafia, there is a lot of interference in collecting soil from waterbodies. They are backed by political parties and it is not easy to bypass them even for the government project,” he said.Officials said that there are interferences at the district-level and it narrows down to the local-level. The issue has been discussed with top railway officials even during their recent review on the progress of the project. Work is in progress at a faster pace from Kadambur to Thattaparai and Vanchi Maniyachi to Gangaikondan, said Kanagaraj a sub-contractor in that stretch.Railway officials said that completion of the 44-km stretch in and around Vanchi Maniyachi will be instrumental in reducing the delay of express trains to the southern districts during nights that are now forced to wait for a long time at stations to give way for other passing trains on the single line. “In the long run it will also facilitate operation of more trains,” an official said and added that the next focus is completing the Madurai-Virudhunagar stretch by July 2020.But for the extension of the existing subways and bridges parallel to the existing ones across major waterbodies, no new railway overbridges and underpasses have been planned as part of the doubling project. “The Madurai-Tuticorin stretch has 19 major overbridges, of which 12 has been completed. There are 20 major bridges on the Vanchi Maniyachi-Nagercoil stretch, of which two has been completed,” an official said.Construction of 205 minor bridges and 17 station buildings on the Madurai-Tuticorin and 325 minor bridges and 12 station buildings on the Vanchi Maniyachi-Nagercoil stretch are among the other major construction works to be carried out as part of the project. As many as five new stations are included on the Madurai-Tuticorin stretch at Nalli, Kadambur, Thattaparai, Vanchi Maniyachi and Tuti Melur.
Page#    Showing 1 to 1 of 1 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy