PNR Ref
 PNR Req
 Blank PNRs
 Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Indian Railways: Divided By Zones, United By Railfans - Karthik

Full Site Search
  Full Site Search  
 
Mon Nov 30 13:37:44 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search
Large Station Board;
Entry# 896056-0
Medium; Platform Pic; Large Station Board;
Entry# 4343571-0


MCS/Mancheswar (4 PFs)
ମଞ୍ଚେଶ୍ଵର     मंचेश्वर

Track: Triple Electric-Line

Show ALL Trains
Rangamatia, Mancheswar rly station, Dist - Khordha 751017
State: Odisha

Elevation: 30 m above sea level
Zone: ECoR/East Coast   Division: Khurda Road

No Recent News for MCS/Mancheswar
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 40
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.3/5 (8 votes)
cleanliness - good (1)
porters/escalators - average (1)
food - poor (1)
transportation - average (1)
lodging - average (1)
railfanning - poor (1)
sightseeing - average (1)
safety - average (1)
Show ALL Trains

Station News

Page#    Showing 1 to 10 of 10 News Items  
Jan 23 (15:11) Rly commissions govt's first waste to energy plant; to turn e waste, plastic into light diesel oil (economictimes.indiatimes.com)
New Facilities/Technology
ECoR/East Coast
0 Followers
6660 views

News Entry# 399622  Blog Entry# 4546884   
  Past Edits
Jan 23 2020 (15:12)
Station Tag: Mancheswar/MCS added by 12649⭐️ KSK ⭐️12650^~/1203948

Jan 23 2020 (15:12)
Station Tag: Bhubaneswar/BBS added by 12649⭐️ KSK ⭐️12650^~/1203948
Stations:  Bhubaneswar/BBS   Mancheswar/MCS  
NEW DELHI: The East Coast Railway has commissioned the government's first waste-to-energy plant which will turn ewaste and plastic into light diesel oil in 24 hours, officials said on Thursday.A patented technology called "Polycrack" will be used in this waste-to-energy plant, which is first of itskind in Indian Railways and only the fourth in India."It is the world's first patented heterogenous catalytic process which converts multiple feed stocks into hydrocarbon liquid fuels, gas, carbon and water."Earlier, lots of non-ferrous scrap generated from the Carriage Repair Workshop had no efficient method of disposal. As a result, these elements were being disposed by landfills, which had environmentally hazardous impact," said East Coast Railway spokesperson JP Mishra.He said in this process, pre-segregation of waste is not required to reform the waste which can be directly fed into the machine to be converted into diesel."It has high tolerance to moisture hence drying of waste is...
more...
not required. Waste is processed and reformed within 24 hours. It is an enclosed unit hence the working environment is dust free. Biological decomposition is not allowed as the waste is treated as it is received, the officer said.The foot print of the plant is small hence the area required for installing it is less when compared with conventional method of processing. All constituents are converted into valuable energy thereby making it zero discharge process , he explained.Gas generated in the process is re-used to provide energy to the system thereby making it self reliant of its energy requirement and also bring down the operating cost, the officer said.He also said that there is no atmospheric emission during the process unlike other conventional methods except for combustion gases which have pollutants less than prescribed norms the world over.The plant operates at around 450 degrees, making it a low temperature process when compared with other options.The waste-to-energy plant has been constructed in three months at a cost of around Rs 2 crore.Waste generated from Mancheswar Carriage Repair Workshop, Coaching Depot and Bhubaneswar Railway Station will be feeder material for this plant. This plant will access 500 kg waste materials per batch, Mishra said.An estimated income from the byproducts generated will be around Rs 17.5 lakh per annum, the official said while the annual maintenance cost per year will be Rs 10.4 lakh.While this is the first such plant over railways, it is the fourth in the country. The first plant is a small one with capacity of 50 kg/day set up by Infosys at Bangalore in 2011.The second one is at Moti Bagh, Delhi in 2014 with a capacity of 50 kg per day. The third one set up at Hindalco in 2019 with 50 kg capacity per batch.
Oct 01 2019 (16:11) East Coast Railway (ECoR) to establish a poly crack plant in Bhubaneswar (orissadiary.com)
New Facilities/Technology
ECoR/East Coast
0 Followers
8086 views

News Entry# 392502  Blog Entry# 4445204   
  Past Edits
Oct 01 2019 (16:12)
Station Tag: Bhubaneswar/BBS added by 12649⭐️ KSK ⭐️12650^~/1203948

Oct 01 2019 (16:12)
Station Tag: Mancheswar/MCS added by 12649⭐️ KSK ⭐️12650^~/1203948
Stations:  Bhubaneswar/BBS   Mancheswar/MCS  
Bhubaneswar: East Coast Railway (ECoR) will establish a poly crack plant here.ECoR General Manager Vidya Bhushan laid the foundation-stone of the proposed plant at the Carriage Repair Workshop, Mancheswar here.
Lots of non-ferrous scrap is being generated in the Carriage Repair Workshop at Mancheswar, which has no efficient method of disposal.
As a result, they find their way to landfills, which is environmentally hazardous. Carriage Repair Workshop, Mancheswar has found a way for tackling this problem in a patented technology called Polycrack.
It
...
more...
is world’s first patented heterogenous catalytic process which converts multiple feed stocks into hydrocarbon liquid fuels, gas, carbon and water. This is the first-of-its-kind in Indian Railways and third in India.
The plant can be fed with the all types of plastic, petroleum sludge, un-segregated MSW with moisture up to 50 per cent, e–waste, automobile fluff, organic waste including bamboo, garden waste, etc., and Jathropa fruit and palm bunch.
The plant will be constructed in four months and the target date of commissioning is January 2020. About Rs 2 crore will be spent.

Rail News
5272 views
Nov 04 2019 (14:48)
Guest: 7d61b3d0   show all posts
Re# 4445204-1            Tags   Past Edits
development happens only in BBS in EC(Odisha)R
Aug 11 2019 (19:53) LHB Coaches Now Serviced in Bhubaneswar (m.timesofindia.com)
New Facilities/Technology
ECoR/East Coast
0 Followers
7454 views

News Entry# 388606  Blog Entry# 4399692   
  Past Edits
Aug 11 2019 (19:53)
Station Tag: Mancheswar/MCS added by shashankswain/1700730

Aug 11 2019 (19:53)
Station Tag: Bhubaneswar/BBS added by shashankswain/1700730
Stations:  Bhubaneswar/BBS   Mancheswar/MCS  
BHUBANESWAR: The Carriage Repair Workshop of the East Coast Railway (ECoR) in Mancheswar here has started full-fledged maintenance work of the Linke-Hofmann-Busch (LHB) coaches for express and superfast trains.
LHB coaches are modern ones that come equipped with anti-telescopic technology to prevent them from crumpling and piling on top of each other in case of an accident. It ensures safety of passengers in case of accidents and even accommodates more people than conventional coaches.
Earlier, the ECoR would depend on other railway workshops for the maintenance of LHB coaches.
Rajesh
...
more...
Agrawal, Railway Board member (rolling stock), on Saturday said LHB coaches were the most modern coaches in use currently. "ECoR has 15 rakes (a collection of coaches is called a rake) of LHB coaches.
We will increase this to 30," he added.
Now, the workshop can maintain 10 LHB coaches per month. Keeping the demand in mind, the ECoR has sent a proposal to the Railway Board for creation of more facilities at the workshop at a cost of Rs 140 crore, sources said.
The railways had in 2017 decided to replace the conventional coaches of the Puri-Ahmedabad Express and the Puri-Howrah Express with LHB coaches. Later other trains also got these coaches.
Jan 31 2018 (14:19) RARE BILATERAL KNEE REPLACEMENT SURGERY PERFORMED AT RAILWAY CENTRAL HOSPITAL (www.eastcoastrail.indianrailways.gov.in)
Other News
ECoR/East Coast
IR Press Release
0 Followers
7521 views

News Entry# 328266  Blog Entry# 3056765   
  Past Edits
Jan 31 2018 (14:19)
Station Tag: Mancheswar/MCS added by Electrification of BAY~/36147
Stations:  Mancheswar/MCS  
Doctors of East Coast Railway Central Hospital at Mancheswar successfully performed a rare bilateral knee replacement surgery o­n a 55 year old lady who is a spouse of a Railway Employee and suffering from severe Osteo Arthritis & severely damaged knee joint of both sides and unable to walk. Earlier, Railway Central Hospital was conducting single knee replacement surgery and was depended o­n corporate hospitals for referral of such cases.

Dr. Debasish Mishra, the consultant surgeon of Railway Hospital and Dr. J. Jena,
​Addl
...
more...
​Chief Health Director/Surgery of Railway Central Hospital along with Dr. Sk. Sirajuddin & Dr. Lingaraj Sahu conducted the surgery which took two & half hours time.
Principal Chief Medical Director of East Coast Railway Dr. S. K. Mohanty and Medical Director of Railway Central Hospital Dr. Arundhati Senapati appreciated and congratulated the surgery team for successful operation.

8156 views
Jan 31 2018 (14:31)
❤16535🌹GOLGUMBAZ EXPRESS🌹16536❤
Irshad13~   7887 blog posts
Re# 3056765-1            Tags   Past Edits
Good To Hear that Railway Central Hospitals also doing such Critical Medical Surgeries and with this it benefits Railway Employees and their families for such major treatments with some concessions from Railways comparing costly private hospitals.
Sep 15 2017 (07:10) मंचेश्वर स्टेशन में कार्य 17 को, ट्रेन सेवाएं होंगी प्रभावित (epaper.jagran.com)
IR Affairs
ECoR/East Coast

News Entry# 316603   
  Past Edits
Sep 15 2017 (07:10)
Station Tag: Mancheswar/MCS added by जय माता दी🙏😊^~/1421836

Sep 15 2017 (07:10)
Station Tag: Bhubaneswar/BBS added by जय माता दी🙏😊^~/1421836
भुवनेश्वर : मंचेश्वर स्टेशन में संरक्षा संबंधी आधुनिकीकरण कार्य के तहत आगामी 17 सितंबर को फुट ओवरब्रिज का संस्थापन किया जाएगा। इस कारण कुछ पैसेंजर ट्रेनें रद रहेंगी। इनमें 58421-58422 अनगुल-पुरी-अनगुल पैसेंजर दोनों ओर से रद रहेगी। इसी तरह 58413 तालचेर-पुरी पैसेंजर, 58407 भद्रक-भुवनेश्वर पैसेंजर, 58411-58412 भुवनेश्वर-ब्रrापुर-भुवनेश्वर पैसेंजर दोनों ओर से रद रहेगी। वहीं 58425 केंदुझरगढ-भुवनेश्वर पैसेंजर केंदुझरगढ से सुबह 06:15 बजे के बदले 07:15 बजे खुलेगी। 12891 बांगिरिपोषी-भुवनेश्वर एक्सप्रेस बांगिरिपोषी से सुबह 04:20 बजे के बदले 06:20 बजे रवाना होगी। रेलवे ने लोगों से सहयोग की अपील की है।भुवनेश्वर : मंचेश्वर स्टेशन में संरक्षा संबंधी आधुनिकीकरण कार्य के तहत आगामी 17 सितंबर को फुट ओवरब्रिज का संस्थापन किया जाएगा। इस कारण कुछ पैसेंजर ट्रेनें रद रहेंगी। इनमें 58421-58422 अनगुल-पुरी-अनगुल पैसेंजर दोनों ओर से रद रहेगी। इसी तरह 58413 तालचेर-पुरी पैसेंजर, 58407 भद्रक-भुवनेश्वर पैसेंजर, 58411-58412 भुवनेश्वर-ब्रrापुर-भुवनेश्वर पैसेंजर दोनों ओर से रद रहेगी। वहीं 58425 केंदुझरगढ-भुवनेश्वर पैसेंजर केंदुझरगढ से सुबह 06:15 बजे...
more...
के बदले 07:15 बजे खुलेगी। 12891 बांगिरिपोषी-भुवनेश्वर एक्सप्रेस बांगिरिपोषी से सुबह 04:20 बजे के बदले 06:20 बजे रवाना होगी। रेलवे ने लोगों से सहयोग की अपील की है।
Page#    Showing 1 to 10 of 10 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy