Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat Oct 23 05:22:58 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

PYOL/Payyoli (2 PFs)
പയ്യോളി     पय्योलि

Track: Double Electric-Line

Show ALL Trains
Kochi - Panavel Rd, Payyoli
State: Kerala

Elevation: 12 m above sea level
Zone: SR/Southern   Division: Palakkad (Palghat)

No Recent News for PYOL/Payyoli
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 24
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station News

Page#    Showing 1 to 3 of 3 News Items  
Dec 23 2019 (08:54) കരിങ്കല്ലുകൾ ട്രാക്കിൽ വരിവരിയായി,നൂറോളം ക്ലിപ്പുകൾ അഴിച്ചു; ട്രെയിൻ അട്ടിമറി ശ്രമം (www.manoramaonline.com)
Crime/Accidents
SR/Southern
0 Followers
35250 views

News Entry# 397180  Blog Entry# 4520756   
  Past Edits
Dec 23 2019 (08:54)
Station Tag: Vadakara/BDJ added by MCPNBR~/261443

Dec 23 2019 (08:54)
Station Tag: Payyoli/PYOL added by MCPNBR~/261443

Dec 23 2019 (08:54)
Train Tag: Parasuram Express/16649 added by MCPNBR~/261443
Stations:  Vadakara/BDJ   Payyoli/PYOL  
കരിങ്കല്ലുകൾ ട്രാക്കിൽ വരിവരിയായി,നൂറോളം ക്ലിപ്പുകൾ അഴിച്ചു; ട്രെയിൻ അട്ടിമറി ശ്രമം കരിങ്കല്ലുകൾ ട്രാക്കിൽ വരിവരിയായി,നൂറോളം ക്ലിപ്പുകൾ അഴിച്ചു; ട്രെയിൻ അട്ടിമറി ശ്രമം ...
more...
മനോരമ ലേഖകൻ പയ്യോളി ∙ പാളത്തിനു മുകളിൽ കരിങ്കല്ലുകൾ നിരത്തിവച്ചും കോൺക്രീറ്റ് സ്ലീപ്പറിനെ പാളവുമായി ബന്ധിപ്പിക്കുന്ന ക്ലിപ്പുകൾ അഴിച്ചിട്ടും ട്രെയിൻ അട്ടിമറി ശ്രമം. റെയിൽവേ സ്റ്റേഷനു സമീപം അയനിക്കാട് കുറ്റിയാൽ പീടികയ്ക്കടുത്താണ് സംഭവം. ശനിയാഴ്ച വൈകിട്ട് മംഗളൂരുവിലേക്കുള്ള പരശുറാം എക്സ്പ്രസിന്റെ ലോക്കോ പൈലറ്റാണു ട്രാക്കിൽ റഫ് റണ്ണിങ് നടന്നതായി വടകര സ്റ്റേഷനിൽ വിവരം നൽകിയത്. റെയിൽവേ പ്രൊട്ടക്‌ഷൻ ഫോഴ്സ് സ്ഥലത്തെത്തി പരിശോധന നടത്തിയപ്പോലാണ് ഒന്നര ഇഞ്ച് കരിങ്കല്ലുകൾ ട്രാക്കിൽ വരിവരിയായി നിരത്തിവച്ചത് കണ്ടെത്തിയത്. വിശദ പരിശോധനയിൽ നൂറോളം ക്ലിപ്പുകൾ അഴിച്ചിട്ടിരിക്കുന്നതും കണ്ടെത്തി. റെയിൽവേ എൻജിനീയറിങ് വിഭാഗമെത്തി തകരാർ പരിഹരിക്കുകയും സ്ഥലത്ത് സായുധരായ പൊലീസിനെ നിയോഗിക്കുകയും ചെയ്തിട്ടുണ്ട്. സംഭവത്തെ സംബന്ധിച്ചു ആഭ്യന്തര സുരക്ഷാ വിഭാഗത്തിനും വിവരം നൽകിയിട്ടുണ്ട്.
Dec 12 2017 (14:31) Rail platform cleaned with mechanised ballast cleaning (www.deccanchronicle.com)
New Facilities/Technology
SR/Southern

News Entry# 324459   
  Past Edits
Dec 12 2017 (14:31)
Station Tag: Payyoli/PYOL added by Electrification of BAY/36147
Stations:  Payyoli/PYOL  
Ballast cleaning (cleaning of metals and gravels in between the sleepers of track) has been successfully done on a platform line using a machine for the first time in the history of Palakkad division. The cleaning was done at Payyoli station on November 3 on a 280-metre long track and again on Mahe on December 2 on a 540- metre long track.
“It is very difficult to use machine for ballast cleaning on tracks due to high level platforms on the main line. That is because such machines require clearance on either sides of track to function effectively. Here, we shifted the track temporarily away from high level platform, screening the ballast by machine and sliding it back to the original location,”
...
more...
said Palakkad Division Railway Manager (DMR) Naresh Lalwani.
The DMR added that the ballast cleaning machines currently available with Indian Railways are not designed to work on tracks adjacent to high level platforms. Hence the work of deep screening of ballast on platform line is done either manually or is kept in abeyance.
The work at Payyoli was on trial basis. Two JCB excavators, points and crossing tamping machines, ballast cleaning machines and other tamping machines were used for five hours, besides regulating traffic. The Payyoli experience buoyed the authorities to repeat it at Mahe and it was also a success.
“70 cm clearance is needed on both side of the machine to do the ballistic cleaning. However, due to adjacent high platform, there will be only 30 cm on that side. So, we shifted the track 40 cm away from the platform side using points and crossing tamping machines and excavators,” explained Shabin Asaf, assistant divisional engineer, Kannur, who overhauled the work. Authorities claim that works undertaken for such a long platform line is for the first time in Southern Railway.
Dec 09 2017 (14:06) Lifts ready at Vadakara railway station (www.thehindu.com)
New Facilities/Technology
SR/Southern
0 Followers
19691 views

News Entry# 324287  Blog Entry# 4289011   
  Past Edits
Dec 09 2017 (14:06)
Station Tag: Payyoli/PYOL added by Electrification of BAY/36147

Dec 09 2017 (14:06)
Station Tag: Tikkotti/TKT added by Electrification of BAY/36147

Dec 09 2017 (14:06)
Station Tag: Koyilandy/QLD added by Electrification of BAY/36147

Dec 09 2017 (14:06)
Station Tag: Vadakara/BDJ added by Electrification of BAY/36147
The Railways will shortly commission the newly installed lifts at the Vadakara railway station as part of upgrading the facilities at small stations utilising the local development fund of people’s representatives.
A sum of Rs. 76.22 lakh has been spent for the lifts, installed near platform number one and two.
According to officials, work on an escalator at a cost of Rs. 1.30 crore will be undertaken after the inauguration of the lifts on December 16. Vadakara MP Mullappally Ramachandran will inaugurate the projects.
For
...
more...
the Vadakara station, the government has sanctioned a total of Rs. 5 crore in 20016-17 and 20017-18 for the development of facilities including new platform shelters, food plaza, comfort station blocks, rest room for labourers and purified drinking water supply points. Most of the works were completed on time with the regular intervention of the people’s representatives and local body heads.
Works at other stations
The MP’s office informed that the Koyilandy, Thikkodi and Payyoli stations were also going through a major facelift with the upgrading of existing amenities for passengers. In Koyilandy, development works to the tune of Rs. 1.16 crore were sanctioned during the 2017-18 fiscal. The development of three platform shelters was the priority at Koyilandy.
Railway officials said around Rs. 50 lakh would be spent for the extension of the existing platforms at Thikkodi and Payyoli.
Meanwhile, rail users have demanded better parking facilities including proper security at small railway stations. The demands have been conveyed to the Southern Railway.

16585 views
Apr 13 2019 (00:16)
prasooncruz   15 blog posts
Re# 4289011-1            Tags   Past Edits
Flase promises... Construction is stopped..
Page#    Showing 1 to 3 of 3 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy