Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Feeling bored in the Train - talk to a RailFan. You'll WISH the train gets late.

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Wed Jun 16 08:19:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

RNR/Ranibennur (3 PFs)
ರಾಣಿಬೆನ್ನೂರು     राणिबेन्नुरू

Track: Construction - Doubling+Electrification

Show ALL Trains
Ranebennur
State: Karnataka


Zone: SWR/South Western   Division: Mysuru (Mysore)

No Recent News for RNR/Ranibennur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 51
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.1/5 (45 votes)
cleanliness - average (6)
porters/escalators - poor (5)
food - average (6)
transportation - poor (5)
lodging - poor (5)
railfanning - average (6)
sightseeing - average (6)
safety - average (6)
Show ALL Trains

Station News

Page#    Showing 1 to 11 of 11 News Items  
Dec 28 2020 (11:31) Commissioner of Railway Safety inspects Double Line Track (starofmysore.com)
Commentary/Human Interest
SWR/South Western
0 Followers
15912 views

News Entry# 430494  Blog Entry# 4825835   
  Past Edits
Dec 28 2020 (11:31)
Station Tag: Harihar/HRR added by Anupam Enosh Sarkar/401739

Dec 28 2020 (11:31)
Station Tag: Ranibennur/RNR added by Anupam Enosh Sarkar/401739
Stations:  Harihar/HRR   Ranibennur/RNR  
Mysore/Mysuru: A.K. Rai, Commissioner of Railway Safety (CRS), Southern Circle, Bengaluru, conducted statutory inspection of newly-laid double line between Harihar and Devaragudda Stations (31-km) on Dec. 23 and 24. Curves, Points and Crossings, Level Crossing Gates, Major and Minor Bridges in this section were checked during  the inspection.
The CRS first conducted Motor trolley inspection of track between Harihar and Ranebennur on Wednesday and did detailed checks at  Major Important Bridge No. 90,  Minor Bridge  No. 77  & 89, Road over Bridge No. 85 A, Level Crossing gate No. 214, Road Under Bridges No.  77 A, 73 A  on the section. At Chalageri Station, safety related Signalling works and passenger amenity works were inspected. The inspection concluded at Ranebennur on the first
...
more...
day. 
On Dec. 24 morning, CRS inspected  the Ranebennur Station and passenger amenity facilities for the Rail users. Motor trolley inspection started from Ranebennur Station and was conducted up to Devaragudda Station. During inspection, level crossing gates No. 219 and curves, points and crossings were done. Speed trial at 125 KMPH was later conducted between Devaragudda and Chalageri. The run was observed to be smooth and passed water glass challenge.
Salient features of Harihar – Devaragudda Section
1. One additional Loop line, and 1 additional stabling line and 2 full length shunting necks are added in Harihar yard. Major yard remodelling work is done in Harihar yard spanning a length of 2.5 km length. Total- 46 points will be inserted in yard remodelling. 
2. Two additional running  lines were added in Devargudda and one additional line each at Kumarapatnam, Chalageri and Ranebennur have also been added as a part of this doubling.  
3. Two new High Level Island Platforms in Chalageri yard of 450 m length each and 2 no.  HL end PF of each 540 m length at Devaragudda yard has been constructed. PF extension/ Widening of 170 m length of two PFs in Harihar, one PF of 120 m length in Chalageri, and two PFs of 100 m each in Ranebennur. Trolley path at both side of PF have been paved with concrete for way movement of trolleys/wheel chairs.   
4. Four Level crossing gates are to be closed after construction of ROB / RUB work in the section. 
LC -208 and 213 have already been closed by construction of ROB,
LC-219 and 221 have been closed by construction of RUB.  Two new RUBs at 77 and 82 were also constructed responding to public demand as a part of doubling. 
5. The total cost of Project is Rs. 298 crore. 
6.  One important Bridge of 16 span was constructed on Tungabhadra river. 
K.C. Swami, CAO/CN,  Rahul Agarwal, Divisional Railway Manager of Mysuru Division, Narayan Rao, CE/CN/N accompanied CRS for Inspection. Srinivas, Dy.CRS and Shantiram, CSTE/CN were part of inspection team, according to a press release from Priya Shetty, Divisional Commercial Manager and Sr. PRO.
Aug 13 2020 (00:42) जल्द शुरू होगी शिवमोग्गा-रान्नीबेन्नूर रेल परियोजना (www.google.com)
*current-affairs
0 Followers
23257 views

News Entry# 416253  Blog Entry# 4686497   
  Past Edits
Aug 13 2020 (00:43)
Station Tag: Ranibennur/RNR added by Pankaj/1718748

Aug 13 2020 (00:43)
Station Tag: Shivamogga Town (Shimoga)/SMET added by Pankaj/1718748

Aug 13 2020 (00:43)
Station Tag: Shivamogga (Shimoga)/SME added by Pankaj/1718748
बेंगलूरु.केंद्रीय रेल राज्य मंत्री सुरेश अंगड़ी ने कहा है कि शिवमोग्गा-शिकारीपुर-रानीबेन्नूर रेल परियोजना पर काम जल्द शुरू होगा। परियोजना के लिए भूमि अधिग्रहण प्रक्रिया पूरी करने का इंतजार है। भूमि-अधिग्रहण का काम पूरा होते ही परियोजना पर काम शुरू हो जाएगा।शिवमोग्गा रेलवे स्टेशन पर लिफ्ट तथा अन्य सुविधाओं का बेलगावी से वेबलिंक के जरिए उद्घाटन करने के बाद अंगड़ी ने कहा कि यह परियोजना निश्चित तौर पर पूरी की जाएगी। रेल राज्य मंत्री ने अरसालु स्टेशन पर नई सुविधाओं, होसनगर तालुक में मालगुडी म्युजियम का भी उद्घाटन किया। उन्होंने कहा कि मुख्यमंत्री बीएस येडियूरप्पा ने 994 करोड़ रुपए लागत वाली इस परियोजना के लिए नि:शुल्क भूमि आवंटित करने पर सहमति प्रदान की है। इसके अलावा मुख्यमंत्री ने परियोजना लागत का 50 फीसदी वहन करने पर भी स्वीकृति प्रदान की है। इसके अलावा बेंगलूरु और दावणगेरे के बीच रेल लाइन दोहरीकरण के लिए भी राज्य सरकार ने नि:शुल्क भूमि आवंटित करने की...
more...
बात कही है। रेल विभाग के संबंधित अधिकारियों को भूमि आवंटित किए जाने के तुरंत बाद परियोजना पर काम शुरू हो जाएगा।वहीं, शिवमोग्गा के सांसद और बीएस येडियूरप्पा के बेटे बीवाई राघवेंद्र ने कहा कि शिवमोग्गा रेलवे स्टेशन पर 1 करोड़ की लागत से दो लिफ्ट तैयार कराए गए। ऑपरेशनल होने के बाद ये वरिष्ठ नागरिकों और शारीरिक रूप से विकलांग यात्रियों के लिए काफी उपयोगी साबित होगा। उन्होंने कहा कि 1980 के दशक में अरसालु रेलवे स्टेशन पर टेलीविजन धारावाहिक मालगुडी डेज की शूटिंग करने वाले अभिनेता-निर्देशक शंकर नाग को श्रद्धांजलि देने के लिए 25 लाख रुपए की लागत से पुराने रेलवे स्टेशन को एक संग्रहालय में विकसित किया गया है। यह धारावाहिक आर के नारायण की लिखी पुस्तक मालगुडी डेज की लघु कथाओं पर आधारित थी। इसके अलावा अरसालु स्टेशन को विस्तार दिया गया है जिससे यहां 28 कोच वाली ट्रेनों का ठहराव हो सकता है। पहले यहां अधिकतम 12 कोच वाली ट्रेनों का ही ठहराव संभव था।उन्होंने बताया कि शिवमोग्गा-रानीबेन्नूर रेल मार्ग के लिए जमीन अधिग्रहण दो महीने में पूरा कर लिया जाएगा। इसके लिए 245 करोड़ रुपए की आवश्यकता होगी। प्रस्तावित परियोजनाओं जैसे कि शिवमोग्गा-हरिहर, बिरुर-शिवमोग्गा, तलगुप्पा-सिदापुरा और शिवमोग्गा-मेंगलूरु के दोहरीकरण कार्य को आने वाले दिनों में क्रियान्वित किया जाना है। शिवमोग्गा में काफी समय से लंबित 100 फीट रिंग रोड का काम दो महीने में पूरा होने की उम्मीद है।
Aug 08 2020 (21:34) Shivamogga-Ranebennur rail project to become reality: Suresh Angadi (www.deccanherald.com)
New Facilities/Technology
SWR/South Western
0 Followers
61994 views

News Entry# 416015  Blog Entry# 4683863   
  Past Edits
Aug 08 2020 (21:34)
Station Tag: Bhadravati/BDVT added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Harihar/HRR added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Talguppa/TLGP added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Mangaluru Junction (Mangalore)/MAJN added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Birur Junction/RRB added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Arasalu/ARU added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Ambajora Shikaripara/SKIP added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Ranibennur/RNR added by Covid break an reforming opportunity to IR/48335

Aug 08 2020 (21:34)
Station Tag: Shivamogga (Shimoga)/SME added by Covid break an reforming opportunity to IR/48335
Union Minister of State for Railways Suresh Angadi said that Shivamogga-Shikaripur-Ranebennur railway project work would be commenced soon after the completion of land acquisition for the purpose.
 Inaugurating lift facility in Shivamogga railway station and new facilities provided in Arasalu station and Malgudi museum in Hosanagar taluk through weblink from his office in Belagavi, on Saturday, he said Shivamogga-Shikaripur-Ranebennur railway project would be implemented without fail.
Referring to the project, he said Chief Minister B S Yediyurappa has consented to allot land at free of cost to the department for the execution of
...
more...
Shivamogga-Ranebennur railway project worth Rs 994 crore. Besides, the chief minister has promised to bear 50% cost of the project. Similarly, the government has promised to allot land for the construction of double track between Davangere and Bengaluru. The railway department is all set to commence the project work after the land is handed over to the officials concerned.
 Presiding over the programme at PESIT college auditorium, Shivamogga MP B Y Raghavendra said two lifts have been constructed in Shivamogga railway station at a cost of Rs 1 crore and it would become beneficial for senior citizens and passengers with physical disabilities.
 Malgudi museum
He said in order to pay tribute to the actor-director the late Shankar Nag, who had shot the scenes of teleserial Malgudi Days at Arasalu railway station in the 1980s, the old railway station has been developed into the museum at a cost of Rs 25 lakh and has been named as Malgudi museum. The teleserial was based on the collections of short stories written by famous Indian novelist R K Narayan in his books Malgudi Days. The platform in the Arasalu railway station has been extended. With this, train with 28 coaches can stop in the station against earlier 12 coaches. The place will be developed into a tourist spot in the coming days.
 He said the government requires Rs 245 crore to acquire land for the Shivamogga-Ranebennur railway route and it would be completed in two months. Similarly, the proposed projects namely Shivamogga-Harihar, doubling work of Birur-Shivamogga, Talaguppa-Siddapura and Shivamogga-Mangaluru via Sringeri have to to be executed in the coming days. The long-pending 100 feet ring road work in Shivamogga is expected to be completed in two months.
On rail over bridges, he said the railway minister has already approved construction of rail overbridges at Vidyanagar, Kashipura and Savalanga road in Shivamogga  and at Kadadakatte in Bhadravathi town and the works are expected to be started soon.

Rail News
57470 views
Aug 09 2020 (22:30)
irifan2015
irifan2015   1185 blog posts
Re# 4683863-1            Tags   Past Edits
Shimoga Ranebennur and Shimoga Harihar both lines are referred. Doubtful whether Harihar line will be laid. Clarity will help.

Also, Talaguppa Honnavara should be executed to connect Malnad region to Coastal/ Konkan railway.

55948 views
Aug 13 2020 (23:45)
ⲎⲀ🅂H
HA5H~   2273 blog posts
Re# 4683863-2            Tags   Past Edits
Talguppa honnavar 80km shelved due to high cost. And according to article quoting swr official said now with smet rnr Smet-hrr is redundant
Jun 29 2020 (15:08) BENGALURU– BELAGAVI – BENGALURU DAILY SUPERFAST EXPRESS SPECIAL (allaboutbelgaum.com)
New/Special Trains
SWR/South Western
0 Followers
113549 views

News Entry# 412634  Blog Entry# 4659206   
  Past Edits
Jun 29 2020 (15:09)
Station Tag: Ranibennur/RNR added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Harihar/HRR added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Arsikere Junction/ASK added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Birur Junction/RRB added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Yesvantpur Junction/YPR added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Tumakuru (Tumkur)/TK added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Davangere/DVG added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Haveri/HVR added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Hubballi Junction (Hubli)/UBL added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Dharwad/DWR added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Station Tag: Belagavi (Belgaum)/BGM added by Covid break an reforming opportunity to IR~/48335

Jun 29 2020 (15:09)
Train Tag: Belagavi - KSR Bengaluru Covid - 19 SF Special/06550 added by Covid break an reforming opportunity to IR~/48335
South Western Railway has decided to run Train No. 06549/06550 KSR Bengaluru-Belagavi-KSR Bengaluru Daily Superfast Express Special with effect from 26.06.2020 from KSR Bengaluru and 27.06.2020 from Belagavi. Shri Suresh Angadi, Hon’ble Minister of State of Railways insisted to run a special overnight train between KSR Bengaluru and Belagavi as the overnight train which was running between KSR Bengaluru and Belagavi before the lockdown was very popular and convenient to public. Accordingly, this train is being run with effect from today from Bengaluru and tomorrow from Belagavi.
Accordingly, Train No. 06549 KSR Bengaluru – Belagavi Daily Superfast Express Special will depart from KSR Bengaluru at 21:00 hrs and arrive Belagavi at 07:25 hrs. on the next day.
Enroute
...
more...
this train will arrive/depart Yesvantpur – 21:09/21:10 hrs, Tumakuru – 21:59/22:00 hrs, Arsikere – 23:15/23:20 hrs, Birur – 23:55/23:56 hrs, Chikjajur – 00:50/00:51 hrs, Davangere – 01:35/01:37 hrs, Harihar – 01:52/01:53 hrs, Ranibennur – 02:13/02:14 hrs, Haveri – 02:45 / 02:46 hrs, Hubballi – 04:05/04:10 hrs and Dharwad – 04:31/04:32 hrs.
In return direction Train No. 06550 Belagavi – KSR Bengaluru Daily Superfast Express Special will depart from Belagavi at 21:00 hrs and arrive KSR Bengaluru at 07:25 hrs. on the next day.
Enroute this train will arrive/depart Dharwad – 23:10/23:11 hrs, Hubballi – 23:45/23:50 hrs, Haveri – 01:05 / 01:06 hrs, Ranibennur – 01:34/01:35 hrs, Harihar – 01:53/01:54 hrs, Davangere – 02:08/02:10 hrs, Chikjajur – 02:49/02:50 hrs, Birur – 03:50/03:51 hrs, Arsikere – 04:30/04:35 hrs, Tumakuru – 06:10/06:11 hrs. and Yesvantpur – 07:05/07:06 hrs .
The train composition will have 18 coaches comprising of ONE First AC coach, ONE AC 2-tier coach, ONE AC 3-tier coach, TEN Sleeper Class coaches, Three Second Class Coaches and TWO Luggage-cum-Brakevan with disabled-friendly compartment.
Consequent to running of this train, the services of Train No.06597/06598 KSR Bengaluru-Belagavi-KSR Bengaluru Tri-weekly Superfast Express Special is cancelled with effect from 29.06.2020 from Bengaluru and 30.06.2020 from Belagavi.
Jan 08 2020 (03:46) Land acquisition for railway project to be completed soon (www.thehindu.com)
IR Affairs
SWR/South Western
0 Followers
18748 views

News Entry# 398382  Blog Entry# 4534224   
  Past Edits
Jan 08 2020 (03:47)
Station Tag: Kotegangur/KGH added by 12649⭐️ KSK ⭐️12650^~/1203948

Jan 08 2020 (03:47)
Station Tag: Ranibennur/RNR added by 12649⭐️ KSK ⭐️12650^~/1203948

Jan 08 2020 (03:47)
Station Tag: Shivamogga Town (Shimoga)/SMET added by 12649⭐️ KSK ⭐️12650^~/1203948
The land acquisition process for Shivamogga-Shikaripur-Ranebennur railway project would be completed in four months, B.Y. Raghavendra, Shivamogga MP, has said.
The project would be implemented at a cost of ₹994 crore. It has been planned to acquire 1,365 acres of land from 49 villages for laying the railway track and to create the infrastructure. The State government has created the post of a special land acquisition officer for the purpose and the survey work has already commenced, he said at a press conference here on Tuesday.
The Railway officials have finalised Kotegangur for
...
more...
establishment of a railway coach terminal. A sum of ₹62 crore was allocated for establishment of a terminal in Shivamogga district. The spot inspections were conducted in Kotegangur as well as in Talaguppa. Mr. Raghavendra said that considering factors such as availability of land and expansion of the railway infrastructure in the district in future, the Railway officials decided to establish the terminal in Kotegangur.
On the land required for the project, he said that Railways own 16 acres in Kotegangur and another 10 acres would be acquired. The Centre has sanctioned ₹79 lakh for survey on providing rail link between Talaguppa and Hubballi via Siddpaur, Sirsi, Mundagod and Tadasa.
Regarding the progress of the work related to Shivamogga airport, he said that a survey has commenced and the project report would be ready by the first week of February.
Later, Mr. Raghavendra visited the airport project site with K.B. Sivakumar, Deputy Commissioner, and collected details on the progress of the work.
Page#    Showing 1 to 11 of 11 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy