Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

आम लोग: "रेल फैनिंग आती नहीं". RailFans: "रेल फैनिंग जाती नहीं" - Md Asif

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat Jul 2 07:27:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Platform Pic; Large Station Board;
Entry# 2322705-0
Night Pic; Platform Pic;
Entry# 4773701-0


SBB/Sahibabad Junction (5 PFs)
صاحب آباد جنکشن     साहिबाबाद जंक्शन

Track: Double Electric-Line

Show ALL Trains
Near MMX Mall, Railway Rd, Gamma 2, Sahibabad Industrial Area Site 4, Sahibabad, Ghaziabad,201005
State: Uttar Pradesh


Zone: NR/Northern   Division: Delhi

No Recent News for SBB/Sahibabad Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 34
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 1.9/5 (27 votes)
cleanliness - average (4)
porters/escalators - poor (3)
food - poor (4)
transportation - average (4)
lodging - average (3)
railfanning - average (3)
sightseeing - poor (3)
safety - poor (3)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 126 News Items  next>>
Jun 30 (22:33) RRTS corridor: Tunnel construction begins from Anand Vihar towards Sahibabad (zeenews.india.com)
Metro
RRTS/Rapid Train
0 Followers
3968 views

News Entry# 490940  Blog Entry# 5396538   
  Past Edits
Jun 30 2022 (22:33)
Station Tag: Sahibabad Junction/SBB added by बिप्लब कागयुगँ/1329476

Jun 30 2022 (22:33)
Station Tag: Anand Vihar Terminal/ANVT added by बिप्लब कागयुगँ/1329476

Jun 30 2022 (22:33)
Station Tag: New Delhi/NDLS added by बिप्लब कागयुगँ/1329476

Jun 30 2022 (22:33)
Station Tag: Meerut City Junction/MTC added by बिप्लब कागयुगँ/1329476

Jun 30 2022 (22:33)
Station Tag: Ghaziabad Junction/GZB added by बिप्लब कागयुगँ/1329476
Tunnel construction has begun on the RRTS corridor that will connect Delhi, Ghaziabad and Meerut through high-speed trains, says NCRTC, reports PTI. 
Trending Photos
To boost urban mobility in and around Delhi-NCR, the National Capital Region Transport Corporation (NCRTC) today (June 27) announced that tunnelling work has begun in the direction of Sahibabad from Anand Vihar station on the Regional Rapid Transit System (RRTS) corridor. The tunnel will connect Delhi, Ghaziabad, and Meerut through high-speed trains. 
The
...
more...
82 km RRTS corridor will have four stations i.e. In Delhi-- Jangpura, Sarai Kale Khan, New Ashok Nagar, and Anand Vihar, of which only Anand Vihar station is underground.
"A Sudarshan (Tunnel Boring Machine) has started tunnelling work in the direction of Sahibabad from Anand Vihar station on the Delhi-Ghaziabad-Meerut RRTS corridor," the National Capital Region Transport Corporation said in a statement.

A 2km-long tunnel will be built from Anand Vihar towards Sahibabad, which will end in front of Vaishali metro station. This is the third Sudarshan (TBM), which has started the construction of a tunnel from Anand Vihar towards Sahibabad, the statement said.
The launching shaft for the third Sudarshan (TBM) has been made at the north of Anand Vihar RRTS Station, from where the construction of the tunnel has commenced. According to the statement, two Sudarshan (TBM) are already working on tunnel construction from Anand Vihar RRTS station towards New Ashok Nagar RRTS station.
Tunnel rings are made underground by TBM with the help of tunnel segments. Seven tunnel segments are generally used to form a tunnel ring, the statement said, adding that the Tunnel Segments are being manufactured at NCRTC's Casting Yard with assured quality control.
Due to the large rolling stock and a high design speed of 180 mph, the width of RRTS tunnels is being constructed as 6.5 m in diameter. Compared to the metro systems, this is for the first time that a tunnel of such a large size is being constructed in the country, NCRTC added.
Jun 21 (13:45) रेल यात्रियों के लिए जरूरी खबर: उत्कल एक्सप्रेस परिवर्तित मार्ग से होगी रवाना, ये ट्रेनें भी रहेंगी प्रभावित (www.naidunia.com)
IR Affairs
SECR/South East Central
0 Followers
11196 views

News Entry# 490082  Blog Entry# 5385804   
  Past Edits
Jun 21 2022 (13:45)
Station Tag: Therubali/THV added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Titlagarh Junction/TIG added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Sambalpur Junction/SBP added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Sahibabad Junction/SBB added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Puri/PURI added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Yog Nagari Rishikesh/YNRK added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Old Delhi Junction/DLI added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Hazrat Nizamuddin/NZM added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Ghaziabad Junction/GZB added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: New Delhi/NDLS added by Adittyaa Sharma/1421836

Jun 21 2022 (13:45)
Station Tag: Raipur Junction/R added by Adittyaa Sharma/1421836
रायपुर।(नईदुनिया प्रतिनिधि)। Indian Railway News: अगर आप रेल यात्रा करते हैं तो आपके लिए लेटेस्‍ट अपडेट है। दरअसल, उत्तर रेलवे स्थित नई दिल्ली-गाजियाबाद खंड में चंदर नगर रेलवे स्टेशन के बी पैनल को जोड़ने का काम किया जा रहा है, जिसके कारण 30 जून को पुरी से हरिद्वार जाने वाली पुरी-हरिद्वार, उत्कल एक्सप्रेस निजामुद्दीन से हरिद्वार के बीच परिवर्तित मार्ग निजामुद्दीन-नई दिल्ली-दिल्ली-साहिबाबाद के मार्ग से गंतव्य को रवाना होगी।
ठीक इसी तरह संबलपुर रेल मंडल के टिटलागढ़-थेरूबाली सेक्शन में ट्रैफिक कम पावर ब्लाक का कार्य किया जाएगा। इस कारण 28 जून को निजामुद्दीन विशाखापटनम सुपर फास्ट एक्सप्रेस निजामुद्दीन से छह घंटे विलंब से रवाना होगी। वहीं, दूसरी तरफ रैक अनुपलब्धता के कारण 21 जून को दुर्ग से रवाना होने वाली दुर्ग-राजेंद्रनगर साऊथ
...
more...
बिहार एक्सप्रेस रद रहेगी।
Jun 15 (11:38) Delhi-Meerut Rapid Rail: First 'Make-in-India' RRTS train reaches Ghaziabad, trials to begin soon (zeenews.india.com)
New/Special Trains
RRTS/Rapid Train
0 Followers
9931 views

News Entry# 489279  Blog Entry# 5379135   
  Past Edits
Jun 15 2022 (11:38)
Station Tag: Savli/SVLI added by बिप्लब कागयुगँ/1329476

Jun 15 2022 (11:38)
Station Tag: Duhai Halt/DXH added by बिप्लब कागयुगँ/1329476

Jun 15 2022 (11:38)
Station Tag: Sahibabad Junction/SBB added by बिप्लब कागयुगँ/1329476

Jun 15 2022 (11:38)
Station Tag: Meerut City Junction/MTC added by बिप्लब कागयुगँ/1329476

Jun 15 2022 (11:38)
Station Tag: Ghaziabad Junction/GZB added by बिप्लब कागयुगँ/1329476

Jun 15 2022 (11:38)
Station Tag: ZZ-Hazrat Nizamuddin/HNZM added by बिप्लब कागयुगँ/1329476
The first train set of RRTS was handed over to the NCRTC on May 7 at an event organised at the manufacturing unit in Savli in the Vadodara district.  
The first train set of RRTS was handed over to the NCRTC on May 7 at an event organised at the manufacturing unit in Savli in the Vadodara district. 
The first set of India-made semi-high speed train under the Rapid Rail Transit System (RRTS) has reached Duhai depot in Ghaziabad. Made by Alstom, the trainset was dispatched from Savli in Gujarat on June 3
...
more...
and has been received by National Capital Region Transport Corporation (NCRTC) on Monday, after travelling by road for 10 days. India's first RRTS, a rail-based, high-speed, high-frequency regional commuter transport system, is being built by NCRTC and will connect Delhi and Meerut on the the Sarai Kale Khan-Ghaziabad-Meerut RRTS corridor.  
"The aerodynamic RRTS train set was loaded on a trailer at the manufacturing factory of Alstom in Gujarat and will be brought to the Duhai Depot in Ghaziabad via road," the NCRTC statement said. The first train set of RRTS was handed over to the NCRTC on May 7 at an event organised at the manufacturing unit in Savli in the Vadodara district.
The statement said the Duhai depot is gearing up for its arrival. "The tracks have been laid out; shades have been prepared for the workshop, and preparations are being made for the testing of the train at the depot. For the operation of the RRTS trains, an administrative building has also been constructed at the depot," the statement read.
It added that for the testing and the maintenance of the RRTS trains, 11 stabling lines, two workshop lines, and three Internal-Bay Lines (IBL) are being constructed. Alstom has been awarded the contract of manufacturing the RRTS trains under Make In India, as per which they would be delivering 40 train sets, including 10 three-car train sets for Meerut Metro, bundled with rolling stock maintenance for 15 years, the statement said.
The 17-km priority section between Sahibabad and Duhai is targeted to be commissioned by 2023 and the full corridor by 2025.
With inputs from PTI

Rail News
10248 views
Jun 15 (11:41)
Biplob Kagyung~   8019 blog posts
Re# 5379135-1            Tags   Past Edits
[RRTS Updates] @OfficialNCRTC has received its first semi-high-speed 'Make in India' train set at Duhai Depot today. The train was supplied by @AlstomIndia and manufactured at Savli Coch Facility Centre, Vadodara, Gujarat.
#RRTS #RollingStock click here
May 28 2021 (14:43) Ghaziabad will be highest station on Delhi-Meerut RRTS Corridor (urbantransportnews.com)
New Facilities/Technology
RRTS/Rapid Train
0 Followers
23673 views

News Entry# 453139  Blog Entry# 4971562   
  Past Edits
May 28 2021 (14:49)
Station Tag: Sahibabad Junction/SBB added by ⭐ ⭐ ⭐ Telangana Express Oops AP Express ⭐ ⭐ ⭐/1366147

May 28 2021 (14:43)
Station Tag: Ghaziabad Junction/GZB added by ⭐ ⭐ ⭐ Telangana Express Oops AP Express ⭐ ⭐ ⭐/1366147
Ghaziabad, India (Urban Transport News): Ghaziabad RRTS station has started taking shape. The station is part of the Priority Section (17 km with 5 stations namely Sahibabad, Ghaziabad, Gudhar, Duhai & Duhai Depot) of the Delhi-Ghaziabad-Meerut Corridor to be commissioned in March 2023. The RRTS alignment coming from Delhi (Sarai Kale Khan) is crossing the Delhi Metro viaduct (Red Line) as well as an existing flyover, just before this station. The platform level of the station is about 24m high, making it the highest RRTS station being constructed on the RRTS network, so far. It is an important regional node and will also facilitate the integration of future corridors of the Phase II RRTS network.
The Ghaziabad RRTS station is being constructed
...
more...
at Meerut Tiraha of Ghaziabad and will be seamlessly integrated with the existing Delhi metro station (Shaheed Sthal New Bus Adda Metro Station), and the Bus Stand of Ghaziabad. Apart from this, there will be three exclusive entry/ exits, of which, two are on the road towards Delhi to Meerut side while the third one is on the other side facilitating easy commuter access. The accessibility will be provided through Foot Over Bridges, with facilities of escalators and lifts for comfortable commuter movement, making it accessible for the elderly and specially-abled. Each platform will be served by 2 escalators, 3 staircases and a lift for commuters’ convenience. All platforms are provided with automatic Platform Screen Doors (PSDs) for the safety of passengers. The lifts provided at RRTS stations have the size & capacity to accommodate stretchers as well, immensely beneficial during occasional medical emergencies. There will be 24x7 CCTV monitoring for enhanced security.
The station will be equipped with state-of-the-art modern amenities including passenger information display boards for real-time information and system maps indicating prominent nearby locations. At the concourse level, apart from ticket vending machines (TVMs), firefighting systems, retail outlets, snack vending machines and facilities like washrooms etc are being provided.
For smooth and systematic vehicular movement in and around station, the traffic integration is being designed to create additional drive-in spaces for all kinds of vehicles. Dedicated pick-up/drop-off zones are also being created to ensure congestion free traffic movement. In pursuit of its vision to contribute towards a clean and green environment, NCRTC is striving to achieve the highest rating of IGBC certifications for Ghaziabad RRTS station. Solar panels for harnessing green energy will be installed on the station roof top. Station infrastructure with aesthetically designed landscape will enhance the overall commuter experience and encourage people to use public transport.
Feb 17 2021 (07:35) आज रेलवे स्टेशनों की बढ़ाई जाएगी सुरक्षा (www.amarujala.com)
Commentary/Human Interest
NR/Northern
0 Followers
31481 views

News Entry# 439499  Blog Entry# 4879577   
  Past Edits
Feb 17 2021 (07:35)
Station Tag: Sahibabad Junction/SBB added by Anupam Enosh Sarkar/401739

Feb 17 2021 (07:35)
Station Tag: Ghaziabad Junction/GZB added by Anupam Enosh Sarkar/401739
साहिबाबाद। किसानों के 18 फरवरी को रेल रोकने के एलान के बाद रेलवे सुरक्षा बल और स्थानीय पुलिस अलर्ट हो गई है। बुधवार से साहिबाबाद और गाजियाबाद रेलवे स्टेशन की सुरक्षा बढ़ाई जाएगी। स्टेशन पर तैनात पुलिसकर्मियों के अलावा अतिरिक्त सुरक्षा बल लगाया जाएगा। यूपी गेट पर किसान कृषि कानूनों के विरोध में पिछले 27 नवंबर से आंदोलन कर रहे हैं। आंदोलनरत किसानों ने 18 फरवरी को देशभर में दिन में 12 से चार के बीच चार घंटे रेल रोककर आंदोलन करने का एलान किया है। किसानों के रेल रोकने के एलान के बाद रेलवे सुरक्षा बल और स्थानीय पुलिस अलर्ट हो गई है। मंगलवार दोपहर साहिबाबाद थाने पर आरपीएफ शाहदरा के इंस्पेक्टर अजय कुमार और एसएचओ विष्णु कौशिक ने सुरक्षा को लेकर बैठक की। साहिबाबाद रेलवे स्टेशन पर बुधवार को अतिरिक्त सुरक्षा बल तैनात किया जाएगा। इसमें आरपीएफ, जीआरपी और सिविल पुलिस के जवान तैनात किए जाएंगे।
गाजियाबाद
...
more...
में गांव के किसान रोकेंगे रेल
भारतीय किसान यूनियन के प्रदेश अध्यक्ष राजवीर सिंह जादौन ने कहा कि गाजियाबाद और उसके आसपास रेलवे स्टेशनों पर निकटवर्ती गांव के किसान रेल का चक्का जाम करेंगे। इसकी सूचना प्रशासन को दी जाएगी। प्रशासन अगर इस दौरान आंदोलनकारी जत्थे को रोकेगा तो किसान वहीं रुक जाएंगे लेकिन किसानों का रुकना भी आंदोलन का हिस्सा माना जाएगा। किसान प्रशासन से कोई संघर्ष नहीं करेगा क्योंकि रेल रोकने के पीछे उनकी मंशा यात्रियों को परेशान करना नहीं है बल्कि सरकार को यह संदेश देना है कि उनका आंदोलन सिर्फ यूपी गेट तक सीमित नहीं है बल्कि पूरे देश में फैल चुका है। उन्होंने कहा कि शांतिपूर्ण तरीके से रेल का चक्का जाम किया जाएगा। इस दौरान रेल यात्रियों की परेशानी का पूरा ख्याल रखा जाएगा।
Page#    Showing 1 to 20 of 126 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy