Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 18:35:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 18:35:59 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Large TB;
Entry# 1876455-0

53182⇒31882/Lalgola - Sealdah EMU Passenger
লালগোলা - শিয়ালদহ ইএমইউ প্যাসেঞ্জার     लालगोला - सियालदह ईएमयू पैसेंजर

LGL/Lalgola --> SDAH/Sealdah

Refresh Live Status (1h 37m ago)
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
Will be converted to 12 Coach EMU w.e.f 17/03/2017
Thu Mar 16, 2017 (11:08PM)
Updated: Mar 17 2017 (07:54) by জয়দীপ JOYDEEP जय़दीप*^~
Dep:
Arr:
RSA - Rake Sharing
No RSA
Rating: /5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Forum

Page#    22 blog entries  next>>
  
General Travel
0 Followers
766 views
May 29 2017 (23:17)   31882/Lalgola - Sealdah EMU Passenger | KNJ/Krishnanagar City Junction (5 PFs)

Raja lare Raja se Praja jaye jaan se~   1628 blog posts   1 correct pred (100% accurate)
Entry# 2299195            Tags   Past Edits
NDF/Nabadwip Ghat - KNJ/Krishnanagar City Junction
Broad Gauge Completed. wiring going on
5 Stations
Track Length: 12 km
  
General Travel
0 Followers
794 views
May 29 2017 (20:53)   31873/Sealdah-Lalgola EMU Passenger | KNJ/Krishnanagar City Junction (5 PFs)

Raja lare Raja se Praja jaye jaan se~   1628 blog posts   1 correct pred (100% accurate)
Entry# 2299037            Tags   Past Edits
Some information in SDAH-RHA-KNJ section of ER:-
1. Y link at Naihati/NH is going on in full pace.
2. An [16 coaches] Empty rake of Humsafar having ER marking is standing idle at Kalyani Station.
3. New Bridge over River Churni at Ranaghat Jn. is under construction. Currently up & dn trains are using the down line bridge only for operations.
4.
...
more...
Doubling of KNJ-STB line. Wonder what will happen to NH 34 as from STB to KNJ the line runs parallel with the highway.
5. Electrical wiring works going on in Nabadwip Ghat - Krisnanagar City Jn. section.
  
Info Update
0 Followers
4515 views
Mar 17 2017 (07:09)   31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)

4πu¶am*^~   6020 blog posts   42393 correct pred (87% accurate)
Entry# 2200164            Tags   Past Edits
Conversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.

  
4024 views
Mar 17 2017 (07:30)
Dipanjan Das~   1557 blog posts   64 correct pred (64% accurate)
Re# 2200164-1            Tags   Past Edits
Why 30 Mins Stop At Krishnanagar ?

  
3851 views
Mar 17 2017 (07:48)
Yuva Rahul^~   4010 blog posts   7231 correct pred (80% accurate)
Re# 2200164-2            Tags   Past Edits
2 eloco is rote se Chutti ho gaya ab kahi or use honge

  
2368 views
May 01 2017 (14:55)
Nirmal   11 blog posts
Re# 2200164-3            Tags   Past Edits
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.

  
2238 views
May 01 2017 (15:22)
May i have your attention plzz~   876 blog posts   3 correct pred (100% accurate)
Re# 2200164-4            Tags   Past Edits
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit

  
2239 views
May 01 2017 (15:32)
Nirmal   11 blog posts
Re# 2200164-5            Tags   Past Edits
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.
  
Info Update
0 Followers
4988 views
Mar 24 2017 (06:59)   31873/Sealdah-Lalgola EMU Passenger | REJ/Rejinagar (2 PFs)

4πu¶am*^~   6020 blog posts   42393 correct pred (87% accurate)
Entry# 2208609            Tags   Past Edits
Traffic block on UP & DN Line between Rejinagar & Beldanga stations.
  
Info Update
0 Followers
1749 views
Mar 16 2017 (20:17)   31883/Sealdah - Lalgola EMU Passenger

IR no more Safe^~   23080 blog posts   99676 correct pred (75% accurate)
Entry# 2199898            Tags   Past Edits
Page#    22 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.