Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jul 27, 2017 18:24:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jul 27, 2017 18:24:08 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Large TB;
Entry# 568377-0
Details Edit
Large TB;
Entry# 1787922-0
Details Edit
Medium; Front-facing; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 2194599-0

12396/Ziyarat Express
زیارت ایکسپریس     ज़ियारत एक्सप्रेस

AII/Ajmer Junction --> RJPB/Rajendra Nagar Terminal (Patna)

Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
Latest News
(You need to double-check/verify this info yourself)
1.Will Run With LHB Rake From 05.01.2017 2. LHB Compostion - 1 coach 1A CUM 2A , 1 Coach 2AC , 3 coach 3AC, 1 Pantry...
more...
, 2 Generator Van, Sleeper coach 11 and 3 general coach. Total 22 coach Blog entry 2101833
Fri Jan 06, 2017 (05:03PM)
Updated: Sep 30 2016 (15:25) by system
Dep:
Arr:
RSA - Rake Sharing
13282/13281Rajendranagar Tinsukia Express
Rating: 4.4/5 (36 votes)
cleanliness - excellent (6)
punctuality - average (6)
food - excellent (6)
ticket avbl - good (6)
u/r coach - good (6)
railfanning - excellent (6)
safety - excellent (6)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
HA1
  3
 A1
  4
 B3
  5
 B2
  6
 B1
  7
 PC
  8
S11
  9
S10
 10
 S9
 11
 S8
 12
 S7
 13
 S6
 14
 S5
 15
 S4
 16
 S3
 17
 S2
 18
 S1
 19
 GS
 20
 GS
 21
 GS
 22
EOG
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Forum

Page#    144 blog entries  next>>
  
Pic Upload
0 Followers
110 views
Jul 25 2017 (09:39)   12396/Ziyarat Express

Shivangtandon007   1 blog posts
Entry# 2362109            Tags   Past Edits
12396 Entering Agra Fort With MGS WAP-4
Shining LHB Rakes
  
Predictions: 5
confirm: 0
rac: 1
wl: 4
Journey: Fri Jun 02, 2017 @ 02:35
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 50   |   Charting: < 20:00
Travel: JP/Jaipur Junction   to   PNBE/Patna Junction   |   1170 km / 1307 km
12396/Ziyarat Express
Entry# 2302991

Posted by: ★Niket Karan★Trip in Mahamana Exp ★^~   5461 blog posts   12 correct pred (100% accurate)
PNR: 281-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 01 2017 (15:53)
Boarding Point: JP/Jaipur Junction
Resv To: PNBE/Patna Junction
Resv Quota: GN
Passenger 1: RLWL# 7 (GN) (Booking Status: RLWL# 46)
Total Fare:  1415
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 01 2017 (20:24)
Boarding Point: JP/Jaipur Junction
Resv To: PNBE/Patna Junction
Resv Quota: GN
Passenger 1: RLWL# 2 (GN) (Booking Status: RLWL# 46)
Total Fare:  1415
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: Jun 01 2017 (20:24)
Boarding Point: JP/Jaipur Junction
Resv To: PNBE/Patna Junction
Resv Quota: GN
Passenger 1: RLWL# 2 (GN) (Booking Status: RLWL# 46)
Total Fare:  1415
Chart PREPARED

Status as of: Jun 01 2017 (15:52)
Boarding Point: JP/Jaipur Junction
Resv To: PNBE/Patna Junction
Resv Quota: GN
Passenger 1: RLWL# 7 (GN) (Booking Status: RLWL# 46)
Total Fare:  1415
Chart NOT Prepared


  
926 views
Jun 01 2017 (17:02)
★Niket Karan★Trip in Mahamana Exp ★^~   5461 blog posts   12 correct pred (100% accurate)
Re# 2302991-1            Tags   Past Edits
Pl predict the final status as chart will prepare in few hours
  
General Travel
0 Followers
1368 views
May 18 2017 (07:33)   12395/Ziyarat Express

भूत हूँ मैं~   3544 blog posts   3085 correct pred (82% accurate)
Entry# 2280977            Tags   Past Edits
Can anyone tell why ths train is leaving RJPB always in the morning (late by 10+ hours) despite of getting 8 hours of TAT with its pairing train. It had been some 7th or 8th run. Is railways in mood to change its timings?

  
1200 views
May 18 2017 (09:26)
prashantg077~   2171 blog posts
Re# 2280977-1            Tags   Past Edits
For LHB rakes they give more TAT , moreover it's pairing train has travelled a long distance and DNR division never takes risks in giving ample rest to rakes.
I have seen in many replies in Twitter handle of DRMDNR saying unavailability of pit line at RJPB yard, so that also might be one reason

  
1107 views
May 18 2017 (22:35)
भूत हूँ मैं~   3544 blog posts   3085 correct pred (82% accurate)
Re# 2280977-2            Tags   Past Edits
Then why all of a sudden? before these 6 weeks, why didnt the same issue happened for 6-8 months?

  
1029 views
May 18 2017 (23:38)
prashantg077~   2171 blog posts
Re# 2280977-3            Tags   Past Edits
Maybe pit line unavailability due to some engineering works going on
  
General Travel
0 Followers
835 views
May 18 2017 (11:30)   12395/Ziyarat Express

▶ECR⭐ पू म रे डब्ल्यु ए पी 7 गोमो ⭐ECR◽◀   483 blog posts   5 correct pred (48% accurate)
Entry# 2281333            Tags   Past Edits
And one more victim of NCR, ECR controlling ..
LHB toh mil gyaa ..but what's use ..jab on time hi nahi chal paayegi...
Negligible stops in NCR still no good controlling ...
..
HailNCR
...
more...
🙅
And ECR too nowadays becoming worst...
Train rite now running 11:00 hrs late
  
General Travel
0 Followers
955 views
May 03 2017 (20:27)   12395/Ziyarat Express

भूत हूँ मैं~   3544 blog posts   3085 correct pred (82% accurate)
Entry# 2261407            Tags   Past Edits
Its pairing train 13281 is arriving RJPB in Wednesday morning since 4 weeks, and this rake has quite sufficient TAT for Primary Maintenance, then why does 12395 is getting rescheduled regularly since 5 weeks, for about 6+ hours?? Today got rescheduled by 10 hours.
Page#    144 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.