Search Trains
 ♦ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3E
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
2-month Availability Calendar
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 14:27:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 14:27:41 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Details Edit
Large TB;
Entry# 1499445-0
Details Edit
Large TB;
Entry# 1326074-0
Details Edit
Small TB; 3 AC; Outside of Train;
Entry# 2359739-0

12104/Lucknow Jn - Pune SF Express (PT)
لکھنؤ پونا ایکسپریس     लखनऊ जं - पुणे सुपरफास्ट एक्सप्रेस

KNW/Khandwa Junction --> PUNE/Pune Junction

Refresh Live Status (23h 18m ago)
Inaugural Run
Sun Oct 08, 2006
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Latest News
(You need to double-check/verify this info yourself)
11.12104 Lucknow-Pune Express will stop at URULI o­n 29.5.2017 in UP direction o­nly.
Mon May 15, 2017 (09:20AM)
Updated: Oct 01 2016 (09:42) by Shubham*^~
Dep:
Arr:
RSA - Rake Sharing
Rating: 3.5/5 (28 votes)
cleanliness - good (5)
punctuality - good (5)
food - good (4)
ticket avbl - poor (5)
u/r coach - average (2)
railfanning - excellent (4)
safety - good (5)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
 A1
  4
 H1
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 10
 S1
 11
 S2
 12
 S3
 13
 S4
 14
 S5
 15
 S6
 16
 S7
 17
 S8
 18
 S9
 19
S10
 20
GEN
 21
SLR
  DD
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Trip Diary

Page#    Showing 1 to 5 of 5 Trips  
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table

1 posts - Sun May 25, 2014 - are hidden. Click to open.

  
4212 views
May 25 2014 (13:27)
monu1306   72 blog posts   125 correct pred (56% accurate)
Re# 1036334-2            Tags   Past Edits
at JHS/Jhansi Junction
Just now i saw toiletcleaning staff roaming in the train hopefully the toilets will soon be cleaner

  
4064 views
May 25 2014 (15:15)
monu1306   72 blog posts   125 correct pred (56% accurate)
Re# 1036334-3            Tags   Past Edits
Finally started to crawl to reach Bina

  
3903 views
May 25 2014 (17:24)
monu1306   72 blog posts   125 correct pred (56% accurate)
Re# 1036334-4            Tags   Past Edits
at SCI/Sanchi
Train is getting late Bhopal yet to com 2 hrs.

  
3526 views
May 26 2014 (06:40)
monu1306   72 blog posts   125 correct pred (56% accurate)
Re# 1036334-5            Tags   Past Edits
at DAH/Dehare
Good morning now the train is late by 3 hrs its most unlike by a weekly sf

  
3548 views
May 26 2014 (06:47)
monu1306   72 blog posts   125 correct pred (56% accurate)
Re# 1036334-6            Tags   Past Edits
This train crawled right from the originating station its almost 24hrs and hasnt reached DD
TRIP HAS ENDED.
Blog  Time-Table

  
4416 views
Feb 23 2014 (07:11)
sanjay   5 blog posts   1 correct pred (100% accurate)
Re# 1004095-1            Tags   Past Edits
at MKG/Manak Nagar
Now

  
4302 views
Feb 23 2014 (08:24)
sanjay   5 blog posts   1 correct pred (100% accurate)
Re# 1004095-2            Tags   Past Edits
at CNB/Kanpur Central
Now

  
4355 views
Feb 23 2014 (09:23)
piyushpkb*^~   2730 blog posts   2666 correct pred (70% accurate)
Re# 1004095-3            Tags   Past Edits
Happy journey.
Page#    Showing 1 to 5 of 5 Trips  

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.