Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEA
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
4-month Availability Calendar
  Go  

patri ke is taraf ya us taraf, zindagi mein hum sab RailFan ek taraf - Ananya D'Souza

Full Site Search
  Full Site Search  
 
Sat Jul 11 09:23:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search

15742/Alipurduar New Jalpaiguri Express (UnReserved)
আলিপুরদুয়ার নিউ জলপাইগুড়ি     अलीपुर न्यू जलपाईगुड़ी एक्सप्रेस

APDJ/Alipur Duar Junction --> NJP/New Jalpaiguri Junction

Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
Duplicate of 15768
Fri Sep 23, 2011 (10:51AM)
TRAIN IS CANCELLED
Dep:
Arr:
RSA - Rake Sharing
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    1 News Items  
Feb 27 2018 (13:52) CMRL Invites Bids for Chennai Metro PH2’s Detailed Design & Soil Test (themetrorailguy.com)
Other News
CMRL/Chennai Metro
0 Followers
1608 views

News Entry# 330417  Blog Entry# 3151941   
  Past Edits
Feb 27 2018 (13:52)
Station Tag: Chennai Central/MAS added by SWR intrastate trains for Karnataka~/36147
Earlier this month, Chennai Metro Rail Ltd began the initial legwork for executing Chennai’s upcoming 107.55 km Phase 2 metro project. In a series of notices, they’ve bids from global and Indian consultants to prepare the detailed designs of a portion of the upcoming 45.77 km Line-3 and 44.66 km Line-5. In addition, they’ve also invited bids from geotechnical engineering firms for carrying out soil investigations along both lines’ routes.
• Line-3 – Madhavaram – SIPCOT (45.77 km) with 50 stations
• Line-5 – Madhavaram – Sholinganallur (44.66 km) with 46 stations
Rough
...
more...
alignments of Line-3 (shown in Purple) and Line-5 (shown in Red) –
The appointed detailed design consultant (DDC) for each section will be responsible for reviewing the design of all viaducts, tunnels & stations, and is expected to produce & propose alternate designs of all architectural, building services, electrical and mechanical works for the depot, staff quarters, operations control centre (OCC) and auxiliary structures.
Notice Inviting Tenders – Line-3
DDC Package No – P2C3/01
Engagement of detailed design consultant (DDC) for the works and services of the detailed design and drawings for the alignment, civil, architectural, MEP, TVS, VAC & track works covering the alignment and underground stations from Madhavaram Milk colony to Thousand lights CH:(-)383 to CH: 15742, in Corridor 3 of phase- II of Chennai metro rail project
– link to notice
DDC Package No- P2C3/02
Engagement Of Detailed Design Consultant (DDC) for the Works and Services of the Detailed Design and Drawings for the Alignment, Civil, Structural Architectural, MEP, TVS, VAC & Track Works covering the Alignment and Underground Stations from Thousand Lights to Taramani Road Junction (excluding Thousands Lights UG station), Ramp & Elevated Stations from Nehru Nagar to Sholinganallur ( CH:15742 to CH:35,414) in Corridor 3 of Phase- II of Chennai Metro Rail Project
– link to notice
Notice Inviting Tenders – Line-5
DDC Package No- P2C5/03
Engagement Of Detailed Design Consultant (DDC) for the Works And Services of The Detailed Design And Drawings for the Alignment, Civil, Structural, Architectural, MEP, TVS, VAC & Track Works Covering The Alignment, Ramp and Elevated Stations from Madhavaram Milk Colony To Shastri Nagar (excluding Madhavaram Milk Colony UG station), Ramp and UG stations from Retteri to CMBT CH:(-)386 to CH:15,339 including Depot at Madhavaram, in corridor 5 of Phase- II of Chennai Metro Rail Project
– link to notice
CMRL also published 6 notices for carrying out geotechnical soil investigations, via boreholes, along Line-3 and Line-5’s routes. The data captured through this activity will serve two purposes – (1) help determine optimal line alignments, especially in the underground sections, and (2) help infrastructure companies submit accurate financial bids during the bidding stage and use appropriate machinery, methods & technology during construction.
Notice Inviting Tenders – Line-3
Package P2C3/Geo-01/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports from MADHAVARAM MILK COLONY to PATTALAM of Corridor-3 (Total Length = 8.04 KM (CH: (-95.00) to CH:7947.00) ) for UNDER GROUND section of Phase II Chennai Metro Rail Limited.
– link to notice
Package P2C3/Geo-02/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports from PATTALAM to Thousand lights of Corridor-3 (Total Length = 7.79 KM (CH:7947.00 to CH:15742.00 ) for UNDER GROUND section of Phase II Chennai Metro Rail Limited.
– link to notice
Package P2C3/Geo-03/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports from THOUSAND LIGHTS to THARAMANI ROAD Junction of Corridor-3 (Total Length = 10.07 KM (CH:15742.00 to CH:25813.00) for UNDER GROUND section of Phase II Chennai Metro Rail Limited.
– link to notice
Package P2C3/ GEO-04/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports for Elevated Section from Tharamani Road Junction to Shollinganallur (Total Length 9.60 Km) CH:25813 to CH:35414 in Corridor 3 of Phase- II of Chennai Metro Rail Project.
– link to notice
Notice Inviting Tenders – Line-5
Package P2C5/ GEO-01/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports from Madhavaram Milk Colony to Shastri Nagar including Madhavaram Depot (Total Length 5.2 Km) CH: 95.00 to CH:5295 in Corridor 5 of Phase- II of Chennai Metro Rail Project
– link to notice
Package P2C5/ GEO-02/2018
Detailed Geotechnical Investigation by Drilling Bore holes and collecting and testing the samples and submission of Geotechnical reports for Under Ground Section from Shastri Nagar to CMBT(Total Length 10.04 Km) CH:5295.00 –CH:15339.00 in Corridor 5 of Phase- II of Chennai Metro Rail Project
– link to notice
The above tender notices only cover a portion of both Line-3 and Line-5’s planned routes, so more notices for the remaining portions in addition to notices for Line-4 (Light House – Poonamallee, 25 km) are expected to be published in the coming months.
Phase 2 has been estimated to cost Rs. 85,000 crore and its detailed project report (DPR) is currently being revised to conform with the new Metro Rail Policy of 2017 after which it’ll be placed before the central government’s cabinet for approval. There’s still no clarity on the project’s funding pattern or whether the Japan International Cooperation Agency (JICA) will provide another loan or not.

1 Public Posts - Tue Feb 27, 2018

2788 views
Feb 27 2018 (13:59)
venki~   4802 blog posts
Re# 3151941-2            Tags   Past Edits
Sipcot - Taramani is very much needed.

2683 views
Feb 27 2018 (14:21)
Thanjavur smart city~   906 blog posts
Re# 3151941-3            Tags   Past Edits
Is this red line goes via perumbakam

2581 views
Feb 27 2018 (14:38)
venki~   4802 blog posts
Re# 3151941-4            Tags   Past Edits
I am taking about Purple line via Sholinganallur, which is very much useful for IT crowd.

2411 views
Feb 27 2018 (14:58)
Thanjavur smart city~   906 blog posts
Re# 3151941-5            Tags   Past Edits
Perubakam I have my home so I am happy it comes and easy tranport

2333 views
Feb 27 2018 (15:13)
venki~   4802 blog posts
Re# 3151941-6            Tags   Past Edits
oh yes...Its very much helpful once its ready.
Page#    1 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy