PNR Ref
 PNR Req
 Blank PNRs
 Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEA
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
4-month Availability Calendar
  Go  

Howrah Rajdhani - At 50, the Handsome King 👑 is still ruling the tracks superbly. - Somanko

Full Site Search
  Full Site Search  
 
Sun Nov 29 10:07:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

09115/Sayaji Nagari COVID-19 Special
સયાજી નગરી કોવિડ - 19 વિશેષ     सयाजी नगरी कोविड-१९ विशेष

DDR/Dadar Western --> BHUJ/Bhuj

Latest News
(You need to double-check/verify this info yourself)
▪️Will be short originated from Andheri at 15.19 hrs on 23.09.20▪️CC:- 2S—4, SL—12, 3AC—3, 2AC—1, 1AC—1, SLR/SLRD—2▪️
Wed Sep 23, 2020 (01:53PM)
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✕ E-Catering
Updated: Oct 16 (02:52) by bh4rtiy4r4il^~
Dep:
Arr:
RSA - Rake Sharing
No RSA . 2 Rakes . PM @ BHUJ
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

  0
  L
  1
DL2
  2
 D4
  3
 D3
  4
 H1
  5
 A1
  6
 B1
  7
 B2
  8
 B3
  9
S12
 10
S11
 11
S10
 12
 S9
 13
 S8
 14
 S7
 15
 S6
 16
 S5
 17
 S4
 18
 S3
 19
 S2
 20
 S1
 21
 D2
 22
 D1
 23
DL1
GIMB
First Departure: Wed Sep 23, 2020 from DDR/Dadar Western
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    4 News Items  
मुंबई में पॉवर कट के चलते ठप पड़ी रेलवे की सुविधाओं में लगभग दो घंटे बाद सेंट्रल मेन लाइन को शुरू किया जा सका है. यहां पर मेन लाइन पर बिजली आपूर्ति बहाल हो गई है. टाटा पॉवर में ग्रिड फेल हो जाने के बाद यहां पर ट्रेनों की सुविधा ठप हो गई थी. वेस्टर्न लाइन शुरू होने की अभी जानकारी नहीं है. .पश्चिमी रेलवे ने बिजली जाने के चलते बंद हुई सेवाओं को लेकर कहा था कि यह Tata Power में एक ग्रिड में गड़बड़ी आने के चलते हुआ है. फिलहाल सेंट्रल लाइन शुरू हो गई है. इसके पहले हार्बर लाइन को भी शुरू कर दिया गया था. 
बृहन्मुंबई इलेक्ट्रिसिटी सप्लाई एंड ट्रांसपोर्ट (BEST) ने ट्वीट कर बताया था, 'TATA के बिजली
...
more...
सप्लाई में कुछ गड़बड़ी होने के चलते शहर में बिजली आपूर्ति बाधित हो गई है. असुविधा के लिए खेद है.' बता दें कि पॉवर कट के चलते ट्रेनें जहां-तहां रुक गई थीं और कई इलाकों में ट्रैफिक सिग्नल भी काम नहीं कर रहे थे.वेस्टर्न रेलवे ने बताया है कि लंबी दूरी की पांच ट्रेनों का समय बदला गया है--11.15 बजे वाली 09025 बांद्रा टर्मिनस-अमृतसर क्लोन स्पेशल 1 बजे जाएगी.- 12 बजे वाली 09025 बांद्रा टर्मिनस-अमृतसर पश्चिम एक्सप्रेस 13.15 पर निकलेगी.- 02933 अहमदाबाद-मुंबई सेंट्रल कर्णावती एक्सप्रेस को बोरीवली में टर्मिनेट किया जाएगा, फिर यह वहां से 02934 नंबर से चलेगी.- 09115 सायाजी नगरी एक्सप्रेस को भी बोरिवली से टर्मिनेट किया जाएगा और फिर यह वहां से 09116 नंबर से चलेगी.- 02480 बांद्रा टर्मिनस-जोधपुर सूर्या नगरी एक्सप्रेस, जो 13.30 पर निकलती है, उसका समय बदलकर14.30 कर दिया गया है.सेंट्रल रेलवे ने भी कुछ ट्रेनों का वक्त बदला है- - 01055 LTT- 12 बजे- 01055 LTT- गोरखपुर- 12.15 बजे- 06345 LTT- तिरुवनंतपुर- 12.40 बजे- 01061 LTT- दरभंगा- 13.15 बजे- 01071 LTT- वाराणसी- 13.40 बजे
Mumbai power cut: After a widespread power outage in and around Mumbai for over an hour, supply was gradually restored in a few areas, including Kharghar in Navi Mumbai, Churchgate in South Mumbai and Mumbra in Thane on Monday afternoon. Train services were also fully restored on both Central and Western Railway.

Efforts are underway to resume supply in other affected locations.
...
more...

Taking cognizance of the matter, Maharashtra Chief Minister Uddhav Thackeray called for an immediate probe into the technical fault that led to the outage. “Thackeray discussed the power outage with Minister for Energy Nitin Raut and directed that immediate efforts be made to restore power supply,” a statement from his office read. Follow Mumbai power cut LIVE UPDATES here

Business and daily life in the financial capital came to a grinding halt this morning after a failure in the central grid of TATA Power at Kalwa hit Adani and BEST electricity distribution services in the city. The Brihanmumbai Municipal Corporation (BMC) had said that it would take “45 min to 1 hour to restore the supply”.

While trains were stopped between CSMT and Diva along the Central Railway line, services were also halted between Churchgate and Vasai on Western Railway.

“However, power supply from MSETCL is available at Vasai Road and it has been extended to work essential suburban trains between Borivali and Virar section,” Western Railway had said in a statement.

Emergency helpline: 022-22694727 and 022-22704403

Juhu, Andheri, Mira Road, Navi Mumbai, Thane and Panvel were among the areas that were largely affected. The Brihanmumbai Electric Supply and Transport [BEST] spokesperson confirmed: “Due to grid failure, the supply of power in the city is disrupted.” “The electric supply is interrupted due to TATAs incoming electric supply failure. Inconveniences is regretted,” BEST posted on Twitter.

Adani Electricity later tweeted: “There is a major power grid failure due to which supply is affected in most areas of Mumbai. As per grid safety protocols, Adani Power System has been able to sustain and islanded. Our teams are working to restore the supply in the affected areas at the earliest. We regret the inconvenience caused.”

Tata Power released a statement explaining the reasons for the power outage and expressed regret for the inconvenience caused to the customers. The company stated that the electricity failure started at 10 am in the morning due to tripping of MSETCL’s 400 KV transmission system at Kalwa which supplies to Mumbai and adjoining areas.

“Based on the preliminary assessment of the situation, Tata Power would like to inform that today many parts of Mumbai experienced an unforeseen electricity failure starting at 10 am in the morning due to tripping of MSETCL’s 400 KV transmission system at Kalwa which supplies to Mumbai and adjoining areas. MSETCLs 400kV Pune-Kalwa line was under forced shutdown since yesterday due to R-Y phase fault. It is understood that MSETCL had taken emergency shutdown for 400 KV Kalwa- Padghe line -1 at 6.54hrs today morning to attend fault and was expected to be revived by 09:30hr, but could not revive it. As understood, at 09:58hrs 400kV Kalwa-Padghe-2 carrying 633 MW tripped. The flow on Pune-Kharghar rose upto 900MW and tripped at 10:00hrs resulting in load drop in Mumbai system. Mumbai’s islanding system that saves the city from major power outages was separated, however, it could not hold as additional 900MW load dropped at 10:05hrs.”, the statement added.

In hospitals, while no disruptions were reported so far, authorities immediately began a battery-back up for ventilators and ICUs. They were directed to ensure back-up for four hours. “We have 1,000 litres of diesel in surplus and a generator that will last for 12 hours. We started the generator the minute the electricity supply was cut. We are arranging for additional supply if needed. No patient was inconvenienced,” Dr Rajesh Dere, Dean of BKC jumbo covid facility, said.

Authorities also cautioned citizens against a reduced water supply. “There will be reduced water supply or no supply. So a request to use water judiciously,” a statement by a BMC corporator read.

Sources said BEST takes supply from Tata Power whose major transformer in Kalwa and Pardha has suffered multiple tripping and failed. Tata also supplies power to Adani which then distributes outside city limits, while BEST provides power in the island city. The Kalwa transformer is the main supply line that provides 350MW to Mumbai.

The state’s Common Entrance Test [CET] exam, which began today, was held using power generators. The first shift of the exam was from 9.30 am-12.30 pm. “Due to the power backups, we have been able to continue the exam,” an official from the state CET cell said. The next shift will begin at 2.30 pm.

The final year exams of most colleges, however, were affected. In a notice to students, KC college principal Hemlata Bagla said: “All UG and PG examinations are being rescheduled to Sunday, 18th October, 2020. The timings will remain the same.”

The effect of the power outage was also felt at the Bombay High Court where videoconferencing proceedings were halted till resumption of services, the registrar said.

Operations at the airport remained unaffected. “The airport has backup plans that immediately get activated within seconds in the event of any power issues. Thanks to this, operations at the airport are normal,” a spokesperson from Mumbai International Airport Limited said.

A sharp drop in the grid frequency has been reported after multiple tripping of lines and transformers in the Kalwa-Khargar sections of the western grid, leading to a complete power outage in Mumbai.

The event, at just past 10am, resulted in a 2000MW deficit in the Mumbai region, forcing the grid managers to isolate the city from the western grid. The power supplies to the rest of the western region are reported to be happening normally. The islanding scheme that automatically isolates a specific region after a fault, according to sources, did not work as intended. An official said restoration is under process and will take a couple of hours.

Both the National Stock Exchange and the Bombay Stock Exchange said there is no stoppage in trading despite power failure. Adani Electricity tweeted to inform that AEML is supplying around 385MW to critical services through Adani Electricity Mumbai Limited (AEML) Dahanu. “Our teams are working to restore the supply in the affected areas at the earliest. We regret the inconvenience caused,” it said in a tweet.

1) 09025 Bandra terminus-Amritsar clone special train which departs at 11.15 hrs is rescheduled to depart at 13.00 hrs.2) 02925 Bandra terminus-Amritsar Pashchim Express which departs at 12.00 hrs is rescheduled to depart at 13.15 hrs.3) 02933 Ahmedabad-Mumbai Central Karnavati Exp will be short terminated at Borivali and will depart from Borivali as 029344) 09115 Sayaji Nagri exp will b short terminated at Borivali station and will depart from Borivali as 091165) 02480 Bandra terminus-Jodhpur Surya Nagri exp which departs at 13.30 hrs is rescheduled to depart at 14.30 hrs

1) 01055 LTT-Gorakhpur at 1200 hrs2) 02542 LTT-Gorakhpur at1215 hrs3) 06345 LTT-Thiruvananthapuram at1240 hrs4) 01061 LTT-Darbhanga at 1315 hrs5) 01071 LTT-Varanasi at 1340 hrs

📣 The Indian Express is now on Telegram. Click here to join our channel (@indianexpress) and stay updated with the latest headlines

For all the latest Mumbai News, download Indian Express App.
Sep 21 (18:38) Special Train between Dadar and Bhuj from 22nd September (twitter.com)
New/Special Trains
WR/Western
0 Followers
11492 views

News Entry# 419129  Blog Entry# 4721862   
  Past Edits
Sep 21 2020 (18:38)
Station Tag: Bhuj/BHUJ added by IRI Mera Jaan 😍😍/2086033

Sep 21 2020 (18:38)
Station Tag: Dadar Western/DDR added by IRI Mera Jaan 😍😍/2086033
For the convenience of passengers, Western Railway has decided to run special train between Dadar and Bhuj. This pair of train will run on daily basis.
Train No 09115 Dadar – Bhuj special will leave Dadar w.e.f 23rd Sept, 2020 at 15.00 hrs & will reach Bhuj at 07.00 hrs the next day. Similarly, Train No 09116 Bhuj – Dadar special will leave Bhuj w.e.f 22nd Sept, 2020 at 22.25 hrs & will reach at Dadar at 13.50 hrs the next day. Enroute this train will halt at Borivali, Vapi, Valsad, Navsari, Surat, Ankleshwar Jn., Vadodara Jn., Anand Jn., Ahmedabad Jn., Dhrangadhra and Gandhidham stations in both directions. This train comprises of Ist AC, AC 2 Tier, AC 3 Tier, Sleeper
...
more...
class and Second class seating coaches.
The booking of Train No 09115 & 09116 will open from 21st September, 2020 at nominated PRS counters and on IRCTC website.
Sep 20 (18:43) WESTEREN RAILWAY TO RUN SPECIAL TRAIN BETWEEN DADAR AND BHUJ W.E.F 22nd SEPT. (wr.indianrailways.gov.in)
New/Special Trains
WR/Western
IR Press Release
0 Followers
10012 views

News Entry# 419078  Blog Entry# 4721050   
  Past Edits
This is a new feature showing past edits to this News Post.
WR Press Release No 2020/09Mumbai, 19th Sept, 2020

WESTEREN RAILWAY TO RUN SPECIAL TRAIN BETWEEN DADAR AND BHUJ W.E.F 22nd SEPT.

For the convenience of passengers, Western Railway has decided to run special
...
more...
train between Dadar and Bhuj. This pair of train will run o­n daily basis.

According to a press release issued by Shri Sumit Thakur- Chief Public Relations Officer of Western Rly, Train No 09115 Dadar – Bhuj special will leave Dadar w.e.f 23rd Sept, 2020 at 15.00 hrs & will reach Bhuj at 07.00 hrs the next day. Similarly, Train No 09116 Bhuj – Dadar special will leave Bhuj w.e.f22nd Sept, 2020 at 22.25 hrs & will reach at Dadar at 13.50 hrs the next day. Enroute this train will halt at Borivali, Vapi, Valsad, Navsari, Surat, Ankleshwar Jn., Vadodara Jn., Anand Jn., Ahmedabad Jn., Dhrangadhra and Gandhidham stations in both directions. This train comprises of Ist AC, AC 2 Tier, AC 3 Tier, Sleeper class and Second class seating coaches.

The booking of Train No 09115 & 09116 will open from 21st September, 2020 at nominated PRS counters and o­n IRCTC website.
Page#    4 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy