Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon May 6 04:44:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 12863
Posted: Oct 28 2009 (18:28)

No Responses Yet
8968 views
0

Oct 28 2009 (18:28)  
 
Jitesh Chhabra
Jitesh Chhabra   4931 blog posts
Entry# 12863              
This is the method how tdr processed by IRCTC
1) Customer himself can register the case through Online or if the customer not able to register online due to any technical problem, the case will be registered by IRCTC Corporate Office staff on receiving the e-mail from Customer.
2) Claim can be “reject” or “approved” by IRCTC Corporate or Regional/ Zonal Office staffs as per extent Railway Rules Approved Claim cases shall be electronically transferred to the concerned Zonal Railways for further refund process.
3)
...
more...
The case can be register by concerned Zonal Railway through system. 4) Claim will be distributed to concerned dealing Clerk – Manual Process. 5) Verification of Chart and other required documents – Manual Process (Will be automated after implementation of EDR)
6) Claim shall be approved or repudiated by concerned Zonal Railway depend upon the eligibility – Manual Process.
7) Put up the file to the concerned competent Authority for approval – Manual Process.
8) Pay order shall be prepared by concerned Zonal Railway - Manual Process.
9) Update refund detail and pay order detail in system.
10) To take the printout of refund statement from system along with Pay Order to be handed over to concerned IRCTC Regional/Zonal Office. 11) After encashing , the refund amount will be deposited to the IRCTC Corporate Account – Manual Process
12) Refund detail updated in system by IRCTC Regional/Zonal Office/Corporate Office accordingly.
13) If any chargeback has been received from Bank, the refund amount will be held with IRCTC till cases are withdrawn by customer from Bank. Refund file will be generated remaining cases by IRCTC Corporate Office. 14) Refund Advice given to bank.
15) Refund Conformation received from Bank
16) Update Refund file – System Process
17) Refund confirmation mail shall be sent to customer accordingly Customer also can view the status “TDR History” from their end.
Thats the reason it takes too much time to process the refund.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 377HBR~
1870067 ★★★ 223GondwanaExpress^~
3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy