It will be a Longer Route, as Boisar to Aurangabad is 354 Kms ( Even Shorter ) , as Compared to Running via UDN-JL-MMR, which will be approximately 742 Kms . Once the Dahanu-Nashik Rail Line gets Green Signal, train From H.S Nanded to Boisar/Bandra Terminus will be Practical.