In one of the PDFs named statusofprojectssurvey, in point iv on pg 12, they have mentioned in red as
'Due to land constraint at Malad (East),Cut connections for all existing 5 lines (4 suburban & 1 mail express) is required to be done at both Malad South and Malad North.'
What does it mean?