Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue May 21 20:09:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by ghi
Page#    293 Blog Entries  <<prev  next>>
1 Followers
General Travel
14775 views
1

Oct 28 2020 (22:00)   12019/Howrah - Ranchi Shatabdi Express
ghij950
ghij950   738 blog posts
Entry# 4761331            Tags   Past Edits
20 th extension day and 19 years of extension has been completed. Extended on 28 th October 2001 between Bokaro Steel City and Ranchi. Two time tables were announced together during announcement of extension first one for shortwhile to avoid problems of passengers those who had already bought tickets having printed earlier departure time of their boarding stations than second and the time of first schedule was same as before extension between Howrah and Gomoh schedule in this direction only and advanced reservation period was of 30 days then. First timetable was for shortwhile like this: HWH 0645 RNC 1330, RNC 1400 HWH 2115. The original timetable was announced together was like this:
HWH 0605 (subsequently changed to 0615)
DGR
...
more...
0745/0747
RNG No halt
ASN 0817/0820 (might have been 0814/0817 - mostprobably not)
DHN 0906/0910 (unchanged when HWH departure susequently changed to 0615)
GMO 0930/0945
CRP No halt
BKSC 1027/1032
MURI 1130/1132 (halting time 2 minutes same arrival/ departure might have been +/- 1 minute)
RNC 1310
---
RNC 1340
MURI 1515/1517
BKSC 1620/1625 (might have been 1625/1630)
CRP No halt
GMO 1710/1725
DHN 1746/1750
ASN 1832/1835
RNG No halt
DGR 1900/1902
HWH 2115
Times of India - the heading was different when it was viewed by me by google search - may be because of technical reason and being old page: Oct 29, 2001 — this story is from October 29, 2001 ... shatabdi to ranchi the route of 2019 up howrah- bokaro shatabdi express has been extended and will go up to ranchi from monday. the 2020 dn ranchi-kolkata ... october 28.

Translate to English
Translate to Hindi

12335 views
0

Oct 28 2020 (23:37)
ghij950   738 blog posts
Re# 4761331-1              
Then: EC of 46 seats each: 0 (subsequently 1), CC of 67/70 seats each: 5 (Subsequently 6), EOG 2
Now: EC of 56 seats each: 2, CC of 78 seats each: 7, EOG 2
Then: Seating capacity: EC: 0 (subsequently 46) , CC: 335-350 (subsequently 402-420)
Now: Seating capacity: EC: 112, CC: 546
Then:
...
more...
5000 HP WAP-4 loco
Now: 6000 HP WAP-7 loco
Then: Max. Permissible Speed 130 kmph between HWH GMO
Now: MPS 130 kmph between HWH DHN avoids GMO
Then: Coaches capable of 130 kmph
Now: Coaches capable of 160 kmph
Then: Loco cpable of 140 kmph for certain weight and number of loco(s)
Now: Loco cpable of 140 kmph for certain weight and number of loco(s)

Translate to English
Translate to Hindi
3 Followers
General Travel
24564 views
7

Nov 24 2019 (18:50)   12027/MGR Chennai Central - KSR Bengaluru Shatabdi Express
ghij950
ghij950   738 blog posts
Entry# 4496409            Tags  
There was a long time between the first and the last day of making the list because average time was below 10 minutes per day without hampering normal work. If you take only the days of activity it is below 30 minutes per day in average and very few day it crossed an hour in a day and never crossed 2 hours in a day. Don't be addicted to this kind of activity - if you want to spent time being interested, please make your own plan to restrict the wastage of time.
List of maximum. permissible speed (km/h). Max permissible speed by RDSO is either more than or equals to original max permissible speed depending on areas and either less than
...
more...
or equals to potential speed permitted by the permanent way structures depending on areas. RDSO speeds are indicated for some routes but all RDSO certified speeds for a certain route are not indicated but it is tried to include atleast highest ever certified speed by RDSO for the respective route but highest ever certified speed may not be mentioned if it is too old and some other RDSO speeds including it in some cases.Speed restrictions are not mentioned but these will be applicable on mentioned speed.

Translate to English
Translate to Hindi

3351 views
3

Nov 24 2019 (19:03)
ghij950   738 blog posts
Re# 4496409-1               Past Edits
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
NDLS CYZ 29 km length 110 (NDLS - New Delhi, CYZ - Chipyana Buzrung). RDSO has been requested to corroborate the track quality fit for raising sectional speed to 130 kmph.
CYZ NEWC
...
more...
130
NEWC PKA Except Gurpa Gaghandi 130 (PKA - Pradhankhunta)
PKA HWH 130 via Dankuni because 250 km (HWH – Howrah)
Source (may be wrong): Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019
----------------------
Gurpa (Gaya end) – Gujhandi (Dhanbad end) is a 22 km long Ghat section ... Trains pass through this Ghat section at a maximum permissible speed of 80 kmph – inside tunnels at restricted speed of 65 kmph. The trains also touch the speed of 100 kmph in a short stretch of approximately 03 km distance …
Source after last margine (May be wrong): East Central Railway Facebook About ECR 11 July 2019
----------------------
PERMISSIBLE MAXIMUM SPEED IN DIFFERENT SECTION
SDAH NORTH
SDAH-NH-SDAH SUB LINE : UP LINE 95 KMPH, DN LINE KMPH 95 KMPH, MAIN LINE [+ COM/LINE ] : UP LINE 90 KMPH DN LINE 90 KMPH SDAH – DDJ is its part. (SDAH - Sealdah, NH – Naihati Jn, DDJ – Dum Dum Jn)
DDJ-DKAE-DDJ MAIN LINE [+ COM/LINE ] : UP LINE 90 KMPH DN LINE 90 KMPH (DDJ – Dum Dum Jn, DKAE - Dankuni)
Source after last margine (May be wrong): Eastern railway Website - chalak Patra Apr June 2019, ELECTRIC/OPERATION/SDAH
-----------------------
Mughalsarai (Presently DD Upadhaya Jn) Patna Hathidah (near Mokama) Sitarampur Jn (near Asansol)
: 110 confirmed by SIMRAN in 2011-12 (certified by RDSO for 120 in 1993 with a request for giving attention for some parts. Upto RJPB : 110 by RDSO in April 2012). Maybe As per Times Of India Jan, 9, 2020 PATNA: The East Central Railway (ECR) has approved the proposal of Danapur division to increase the speed limit of all mail and express trains up to 130 kmph on the Jhajha-Patna Junction-Pt Deendayal Upadhaya Junction mainline section from April 30. The Railway Board has given its nod to the proposal. At present all mail and express trains, including Rajdhani Express, are running at the speed limit of 110 kmph between Jhajha and Pt Deendayal Upadhaya Junction route. Sources after last margine wrong?
_____________
Section Line Maximum sectional speed
LKO CNB UP 100 (LKO – Lucknow, CNB – Kanpur)
CNB LKO DN 100
Source after last margine (May be wrong): NCR website - Wagon - Sanction for regular operation of roller rake composed of 21BRN/BRNA/BRNAHS wagons carrying … over all BG sections of N.C.Rly at a maximum speed of 60 kmph. - Track BridgeJSC RDSO Speed Cert. 2015
---------------------
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
NDLS TKD120 (Tuglakabad TKD) 120 RDSO has been requested to corroborate the track quality fit for raising sectional speed to 130 kmph
TKD PWL 160
PWL MTJ 160
MTJ) NAD 130 (Mathura - MTJ, Nagda - NAD)
NAD RTM 130 (Ratlam RTM)
RTM LIMKHEDA 100
LIMKHEDA GODHRA 110
GODHRA VIRAR 130
VIRAR BORIVALI 26 km length 110
BORIVALI BCT/MMCT/ Mumbai Central 30 km stretch 100
Source after last margine (May be wrong): Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019

Translate to English
Translate to Hindi

4947 views
3

Nov 24 2019 (19:09)
ghij950   738 blog posts
Re# 4496409-2               Past Edits
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
Chatrapati Shivaji Mahraj Terminus – Kasara 105. As per The Indian express Jun 13, 2018 (may be wrong), the CR plans to increase the sectional speed limit to 110 kmph by 2018-19. As per a source (maybe wrong) about "... PUSH PULL OPERATION ..." of September 2019: 105 KMPH
Kasara – Igatpuri 16 km stretch 55 (60)
Igatpuri
...
more...
Wardha 110
Wardha Nagpur 120
Nagpur Jharsuguda 110 Proposed for 130 kmph sectional speed. It is being tried and proposal may be fulfill in future.
Jharsuguda Howrah 110 /130 (Kharagpur – Andul increased to 130 later - not written in the source, rest 110) (via Tatanagar but not written in source)
Proposed for raising of speed to 130 kmph from Andul to Kharagpur & from Kharagpur to Tata sent to CRS on 28.11.19 & 11.11.19 respectively.
Source (may be wrong) after last margine for Wardha Nagpur: Railway Board: Raising maximum permissible speed of sections. 21 March 2018 and source for other: Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019
----------------
20-09-2020
SOUTH EASTERN RAILWAY ACCELERATES SECTIONAL SPEED LIMIT
दक्षिणपूर्वरेलवे
SOUTH EASTERN RAILWAY
प्रेसविज्ञप्ति
PRESS RELEASE
SOUTH EASTERN RAILWAY ACCELERATES SECTIONAL SPEED LIMIT
Kolkata, 20thSeptember, 2020:
South Eastern Railway,in a bid to make high-speed movement of train services for reaching the passengers and goods totheir destinations faster,has decided to accelerate the maximum permissible sectionalspeed limitfrom 110 kmph to 130 kmph in up, down and middle lines between Andul and Kharagpur stations (102 km)on Howrah-KharagpurSection in Kharagpur Division.
Source of the above information after last margin may be wrong
------------------------------------
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
Howrah Bhadrak 110 (Primary proposal for 130 kmph sectional speed)
Bhadrak Duvada (DVD) (via Palasa but not written in source) 110 Track Strengthening work under progress for 130 kmph sectional speed
Duvvada Vijayawada 110 Track Strengthening work under progress for 130 kmph sectional speed
Vijayawada Gudur 110 Track Strengthening work under progress for 130 kmph sectional speed
Gudur Chennai 110 (Awaiting speed certificate for COCR trial)
Source after last margine (May be wrong): Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019
---------------------------------
As such, including both the Up and Down lines in these sections, a total of 2,824 kms (1412Rkms)has now been made fit to run at a speed of 130 kmph. This covers the entire GQ-GD route over SCR, except Vijayawada - Duvvada section, where signaling up-gradation work is in progress.
Source after last margine (May be wrong): Indian Railway enhances Speed to 130 Kmph Along the Golden Quadrilateral & Golden Diagonal sections

A total of 2824 Kms (including Up &Down Lines)over South Central Railway Zone is now fit to run at 130 Kmph speed
Posted On: 09 JAN 2021 5:53PM by PIB Delhi. Posted on FB on same day.
----------------------------
Existing Max Permissible Sectional Speed (in Kmph);
BHC- KUR 110 (BHC – Bhadrak, KUR – Khurda Road)
KUR - PSA 110 (PSA-Palasa)
KUR - PUI (Puri. PUI is not a station code for passenger) 110 Speed from 95 to 110 raised in 2014-15 & SIL-DEG DN raised from 75 to 110kmph in 2015-16
Source (May be wrong): ECR - About us of engineering Dept, Time – maybe just after FY 2017-18 as some other data of that year in that document
-------------------------------------
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
AGC LAR part of TKD LAR 130 (AGC Agra Cantt, LAR – Lalitpur)
LAR BINA 120 (Proposal for raising of speed upto 130 kmph, CRS has given observation
BINA JHP (Jujharpur) (Near Itarsi) 120 (Proposal for raising of speed upto 130 kmph is under preparation)
JHP BPQ (Balharshah) except Dharakhoh Maramijhiri, Chichonda Teegaon not written in source 120(65 Ghat)
BPQ - KZJ (Kazipet) 120 (Proposed for enhancement of speed to 130 kmph. It is being tried and proposal may be fulfill in future.)
KZJ-BZA (Vijayawada) 120 (Track strengthening work under progress for130 kmph sectional speed)
BZA Gudur (GDR) 110 (Track strengthening work under progress for130 kmph sectional speed)
GDR Chennai Central (MAS) 110 (Awaiting speed certificate for COCR trial)
Source after last margine (May be wrong): Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019
---------------------------------------
Dharakhoh Maramijhiri & Teegaon Chichonda: ascending the ghat: – unknown but by RDSO: a) 60 for ICF rake on 21.7.11 which is amendment of 29.1.10. b) 65 for ICF rake in May 2011.
Maramijhri- Dharkhoh & Chichonda- Teegaon descending the ghat section: unknown but 75 by RDSO in February 2012
Sources after last margine may be wrong
---------------------------------------
SECTION WISE DETAILS OF MAX PERMISSIBLE SECTIONAL SPEEDs
Existing Max Permissible Sectional Speed:
BIN-LARDN 120
LAR-BIN UP 120
LAR-DHO DN 130
DHO-LAR UP 130
Source after last margin: NCR website - ENGINEERING _ ETKMs & ITKMs:

North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 03-07-2020
BIN (inernal code – not for passengers?) – BINA JN, LALITPUR JN – LAR, DHAULPUR - DHO
---------------------------------------
Accordingly, the South Central Railway zone has received sanction to enhance the maximum speed limits to 130 kmph:
i. Ballarshah to Kazipet – 234 Rkm
ii. Kazipet-Vijayawada-Gudur – 510 Rkm
Sourceafter last margin (Maybe wrong): Indian Railway enhances Speed to 130 Kmph Along the Golden Quadrilateral & Golden Diagonal sections

A total of 2824 Kms (including Up &Down Lines)over South Central Railway Zone is now fit to run at 130 Kmph speed
Posted On: 09 JAN 2021 5:53PM by PIB Delhi. Posted on FB on same day.
----------------------
SECTIONAL SPEED:
NZM-AGC:160KMPH,AGC-LAR:130KMPH,LAR-BPL:120KMPH,BPL-IGP:110KMPH,IGPKSA:
60KMPH,KSA-CSTM:105KMPH
NZM - HAZRAT NIZAMUDDIN, AGC AGRA CANTT, LAR- LALITPUR, BPL – BHOPAL JN, IGP – IGATPURI, KSRA/ KSA – KSARA, CSTM CST MUMBAI (later CSMT – C SHIVAJI MAHARAJ T)
Source (May be wrong): COMPENDIUM ON PUSH PULL OPERATION OF WAP5/WAP7 LOCOMOTIVES OVER INDIAN RAILWAYS
Issued in – September 2019
-----------------------------
Whichever is higher between Speed of fastest train running in the section (kmph) and maximum permissible sectional speed:
Kalyan Karjat 105
Karjat Palasdari 3 km length 80
Palasdari Lonavala 25 km stretch 60 (Ghat)
Lonavala Pune 110
Pune Daund 110
Daund Solapur 110
Solapur Wadi 110
Wadi Gooty 130
Gooty Renigunta 130
Renigunta Chennai 105 Track Strengthening work under progress for 130 kmph sectional speed (As per other source AJJ-RU 110 target year 2011-12, As per other source Chennai Central – Arakkonam in all parts at least for two lines: 105 in 9.13)
Source (May be wrong) after last margine (Except Wadi Gooty, Gooty Renigunta): Railway Board: Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17 Dec 2019
---------------------------
Accordingly, the South Central Railway zone has received sanction to enhance the maximum speed limits to 130 kmph: along the following routes:
i. Renigunta to Gooty - 281 Rkm
ii. Gooty to Wadi - 255Rkm
Source after last margin (Maybe wrong): Indian Railway enhances Speed to 130 Kmph Along the Golden Quadrilateral & Golden Diagonal sections

A total of 2824 Kms (including Up &Down Lines)over South Central Railway Zone is now fit to run at 130 Kmph speed
Posted On: 09 JAN 2021 5:53PM by PIB Delhi. Posted on FB on same day.
----------------------------
Increase in max permissible sectional speed:-
Increasing sectional speed from 105 to 110 kmph DAUND JN (DD)- SOLAPUR JN (SUR) BG section. sanction dt. 06.07.2018.
Increasing sectional speed from 105 to 110 kmph DAUND JN (DD)-MANMAD JN (MMR) BG section. sanction dt. 02.07.2018.
Increasing sectional speed from 100 to 110 kmph KURDUVADI (KWV) – MIRAJ JN (MRJ)BG section. sanction dt. 02.07.2018.
Source after last margine (May be wrong) : Central Railway / Indian Railways Portal CMS Team Last Reviewed on: 15-03-2019
-------------------------------------
The Indian express Jun 13, 2018 (Source may be wrong)
We have already increased speed limit between Itarsi-Balharshah on the Delhi-Chennai sector to 120 kmph, while work on the remaining sections is on,” a senior CR official said.
In a presentation made by the CR General Manager D K Sharma to the Railway Board on May 30, the CR plans to increase the sectional speed limit to 110 kmph by 2018-19.
These sections include Diva-Panvel-Roha, .., Pune-Miraj-Kolhapur, .., Manmad to Solapur, Chhatarapati Shivaji Maharaj Terminus-Kasara and Boisar-Diva.

Translate to English
Translate to Hindi

3569 views
2

Nov 24 2019 (19:15)
ghij950   738 blog posts
Re# 4496409-3               Past Edits
Hathidah (near Mokama) Guwahati/ Dibrugarh Town: Barsoi to New Jalpaiguri is mostprobably 100, New Jalpaiguri to Guwahati is mostprobably 100 or 105 or varies between 100 & 105 or something between 100 & 105 by SIMRAN (certified for other than c&M1 Vol I in Hathidah Guwahati/ Dibrugarh Town by RDSO is 105)
-------------
Kazipet Secunderabad: Already, the maximum speed limits in the High-Density Network (HDN) between Secunderabad – Kazipet (132 Kms distance) had been enhanced to 130 kmph.
Source
...
more...
after last margin (Maybe wrong): Indian Railway enhances Speed to 130 Kmph Along the Golden Quadrilateral & Golden Diagonal sections

A total of 2824 Kms (including Up &Down Lines)over South Central Railway Zone is now fit to run at 130 Kmph speed
Posted On: 09 JAN 2021 5:53PM by PIB Delhi. Posted on FB on same day.
RDSO Certified: 120 on 29.1.02 which was amended on 11.12.2006
-------------
Secunderabad Vikrabad: up: less than or exactly 105 km/h, , Dn: less than or exactly 110 km/h, (By RDSO: i) 120 on 9.6.1994, one line then? ii) up 105 km/h, Dn 110 km/h on 29.1.02 which was amended on 11.12.2006)
Vikrabad Wadi: less than or exactly 105 (105 by RDSO)
Wadi Gooty: 130 Source (may be wrong) of 09 JAN 2021 written in other place
Gooty Dharmavaram: less than or exactly 105 (105 by RDSO)
Dharmavaram Penukonda Jn mostprobably not via SSPN : as per unofficial website 120 (By RDSO: i) 120 January 2000, ii) 130 on 29.1.02 which was amended on 11.12.2006)
Penukonda Jn Yelahanka: 120? (By RDSO: i) 120 January 2000, ii) 130 on 29.1.02 which was amended on 11.12.2006)
Yelahanka Bangalore: actual speed is unknown (130 by RDSO on 29.1.02 which is amended on 11.12.2006)
New Delhi- Naya Azadpur: unknown but not more than 100 by SIMRAN
Sources of above may be wrong
-------------------------------------------------------
Naya Azadpur- Ambala -Jalandhar City – Amritsar: 110 was confirmed by SIMRAN and going to be increased upto130 soonupto Ludhiana , or maybe already 130 upto Ludhiana with the introduction of Vandhe Bharat(?) in New delhi – Ambala – Ludhiana [By RDSO: i) Naya Azadpur Ambala: 130 July 2011 ii) Ambala Ludhiana: 130 in July 2011 iii) Ludhiana- Jalandhar City- Amritsar: 120 September 2003]
Ambala Chandigarh: 110 by SIMRAN (120 by RDSO in 10.9.98, September 2003).
As per TIMES OF INDIA (Source may be wrongI: TNN | Updated: Aug 12, 2019, 11:34 IST: The New Delhi-Ambala and Ambala-Ludhiana sections are certified for 130 kmph, but the approval is yet to be received for Ambala-Chandigarh route.
Apr 18, 2017 Hindustan Times At present, the Shatabdi Express covers the distance in 3.30 hours, running at a speed of 110 kmph. “We have sent a proposal to the commission of railway safety, asking it to reduce the travel time of Shatabdis running between Chandigarh and Delhi. As per our proposal, the train will run at 130 kmph between Ambala and Delhi …
Above sources after last margin may be wrong
------------------------------------------------------
Jalandhar City Pathankot- unknown (110 by RDSO in September 2003)
12951 / 12952 New Delhi – Mumbai Central Rajdhani Express, 12953 /12954 A. K. Rajdhani Express, 12009 / 12010 Ahmedabad – Mumbai Central Shatabdi Express will run at 130 kmph o¬n Virar - Godhra & Virar – Ahmedabad sections from 120 kmph, due to improvement in infrastructure.Source (May be wrong): Western Railway website, 29-09-2015. Mostprobably Maximum Permissible Speed of Vadodara – Ahmedabad was 110 kmph and not 120 kmph so, increasing of speed upto 130 kmph from 120 kmph mentioned in this source mostprobably excludes Vadodara – Ahmedabad part of Virar – Ahmedabad section though Vadodara – Ahmedabad may be certified for 130 kmph by RDSO, which may be higher than operational mostprobably 110 kmph.
Vadodara Ahmedabad: 110 (By RDSO: i) 130 in Oct 1997, July 2008, August 2008, (130 by RDSO 8.4.16) ii) 110 in November 2002) june july 2012 speed in curves may be less than 120 but shall not exceed 120 for AC Double Decker
Ahmedabad Godhra: actual is unknown. (130 by RDSO in July 2008, August 2008)
Chhatrapati Shivaji Terminus –Roha: unknown (120 by RDSO in December 2004). As per The Indian express Jun 13, 2018 (May be wrong), the CR plans to increase the sectional speed limit of Diva- Panvel- Roha to 110 kmph by 2018-19
Roha Madgaon: mainly 110, maybe slightly more in a part or some parts but not more than 115 by SIMRAN. 120 at past (By RDSO: i) 120 April 2002, December 2004 ii) 150 in March 2003)
Madgaon Thokur: Mainly 110 is confirmed by SIMRAN, maybe slightly more in a part or some parts but not more than 115 (120 by RDSO April 2002, December 2004)
Thokur Mangalore: less than or exactly 120 (120 by RDSO December 2004)
Patelnagar Rewari: Mostprobably 110 (110 by RDSO in May 2012,110 by RDSO in June 1995 between Delhi Cantt & Rewari)
Above sources after last margin may be wrong
-------------------------------------------------------------------
MAX.P.SPEED
RE-AWR(DN) 110 [REWARI (RE)]
RE-AWR(uP) 110
AWR.BKI 110
BKI-JP (UP) 100 [JAIPUR (JP)]
BKI-JP (DN) 110
JP-FL (UP) 110
JP-FL (DN) 110
FL-MD (UP) 110 [MADAR (MD)]
FL-MD(DN) 100
R.P.C. 100 Mostprobably, R.P.C. 215 Km is Rewari - Phulera Chord (RPC) via Ringas
NORTH WESTERN RAILWAY JAIPUR DIVISION COMMERCIAL/ MAINTENANCE FACILITIES MAP - comparing with a map of 01.40.2017, it can be told that it is clearly before 01.04.2017 as some under construction work in this map is completed in the Jaipur Division System Map of 01.04.2017. As RDSO certified is 110 in 07.05.2012 and RDSO certified is greater than or equal to Max P Speed, sections having 110 kmph as per mentioned above had 110 kmph Max P speed at least sometime during may 07.05.2012 to 01.04.2017. (Maybe wrong)
--------------------------------------------------------
MAX. SECTIONAL SPEED.
SECTION KMPH
MADAR-PALANPUR (Excl) 110 MADAR is near AJMER
AJMER-MADAR(DN) 90
Source (May be wrong): ORGANISATION OF ENGINEERING DEPARTMENT AT AJMER, time is not mentioned but some other subject of the source was upto 31.3.13
-------------------------------------------------------------
Ahmedabad Palanpur: unknown (130 by RDSO 8.4.’16)(source wrong?)

Translate to English
Translate to Hindi

3065 views
1

Nov 24 2019 (19:19)
ghij950   738 blog posts
Re# 4496409-4               Past Edits
Naganahalli-Mysore (BG New Double line) Present Speed.(kmph) 70, Proposed speed
(kmph)100, Sanction under process at Hqrs. TDC – 31.7.2016
Birur – Ajjampura (New Down Line) Present Speed.(kmph) 80, Proposed speed
(kmph)100 Speed in Sept 2014 increased
Ajjampura-Hosadurga
...
more...
(New Down Line) Present Speed.(kmph) 80, Proposed speed
(kmph)100 Proposal submitted to Hqrs on 06.10.2015. TDC – 31.8.2016
Hosdurga-Chikjajur (New Down Line) Present Speed.(kmph) 100, Proposed speed
(kmph)100 Residual works in progress. CRS sanction to be processed. TDC – 30.9.2016
Source (May be wrong): South Western Railway CMS Team Last Reviewed on: 20-12-2017
-----
SWR website:
Civil Engineering Branch
STATUS OF INCREASING OF SECTIONAL SPEED (2020-21):
RRB-JRU 110 05.11.2020
SPGR-ASK (ASK-RDI = 100 RDI-SPGR = 95) Pro speed 110 Speed trial conducted on 05.10.2020.
Above source after last mergine may be wrong
CHIKJAJUR JN- JRU
BIRUR JN- RRB
SAMPIGE ROAD- SPGR
ARSIKERE JN- ASK
Source : South Western Railway CMS Team Last Reviewed on: 23-11-2020
-----
Thiruvananthapuram Kollam: 95 in some parts, 100 in some parts by SIMRAN around 2012 (wrong source?)
--------------
AJJ-RU 110 (target year 2011-12) as per another source (maybe wrong), Railway Board: Raising maximum permissible speed of sections. 21 March 2018 it is still 105
VANIYAMBADI (VN) – JOLARPETTAI (JTJ) 100 to 110 target in 2011-12 Raising of speed
IRUGUR (IGU)- COIMBATOREJN (CBE) 70 to 90 target in 2011-12 Raising of speed
SHORANUR JN (SRR) – MANGALORE (MAQ): 100 TO 110 target in 2011-12 (done) Raising of speed
MAQ – THOKUR (TOK): 65 (guessed by seeing some of other parts of the document, the time was2011)
ERNAKULAM JN (ERS) – ALAPPUZHA (ALLP): 90 (guessed by seeing some of other parts of the document, the time was2011)
SRR – ERS: 80 (guessed by seeing some of other parts of the document, the time was2011)
ALAPPUZHA (ALLP) – KAYANKULAM (KYJ): 90 (guessed by seeing some of other parts of the document, the time was2011)
Source (May be wrong): Raising of Maximum Permissible Speed by searching in Southern railway website
----------------------------------------------------------
Shoranur Mangalore: at least some parts 110, rest part unknown but not more than 110 by SIMRAN around 2012
Muzaffarnagar Meerut city: 110 by SIMRAN around 2012
Moradabad Lucknow: at least some parts 105
Lucknow Sultanpur Varanasi: at least some parts 110 by SIMRAN around 2012
Sealdah Dumdum Jn: unknown but nowhere more than 110 by SIMRAN around 2012
Haridwar Dehradun: 65 or 70 (SIMRAN around 2012)
Sabzi Mandi- Naya Azadpur: presently it is unknown but mostprobably not more than 100 (SIMRAN around 2012), earlier, according to Delhi Div map (1/4/2004), it was 110
Above sources after last margin maybe wrong
---------------------------------------------------------------
Chennai Central – Arakkonam Jn. Up Fast 105, Dn fast 105, (Chennai Central - PATTABIRAM Dn Slow105; Up Slow 105, PATTABIRAM - Thiruvallur 3rd Line 105; 4th Line at first 105 afterthat 100 thereafter 105, Thiruvallur - Arakkonam Jn. 3rd Line 70, TIRUVALANGADU - Arakkonam Jn. 4th Line 90)
Arakkonam Jn. – THALANGAI Dn 105, Up 105
THALANGAI - WALAJAH ROAD JN Dn 105, Up 105
WALAJAH ROAD - JOLARPETTAI JN Dn 105, Up 105 As per other source (may be wrong) - Raising of Maximum Permissible Speed by searching in Southern railway website - VANIYAMBADI (VN) – JOLARPETTAI (JTJ) 100 to 110 target in 2011-12 Raising of speed
Arakkonam Jn. - Renigunta Jn. (including Malpakkam Bypass) Dn 105, Up 105
Source after last mergin (May be wrong): Joint Safety Certificate 9.13 – a part of CRS Speed Certificate (.ppt file) not earlier than 2018 and not later than 2019
-------------------
Jolarpettai yard (Chennai Div/SR) has been modified & upgraded Now, speed increase at 110 kmph instead of existing 15 kmph. Source(May be wrong): Ministry of railways, Government of India, facebook, 3.6.20
------------------------
Chennai – Jolarpettai, Chennai – Renigunta and Chennai – Ongole section speed to be increased to 130 kmph from 110 kmph
Source after last mergin (May be wrong): THE NEW INDIAN EXPRESS: 27th March 2018

Translate to English
Translate to Hindi

2570 views
0

Nov 25 2019 (22:41)
ghij950   738 blog posts
Re# 4496409-5              
Please give rate to the blogs those you like
Translate to English
Translate to Hindi

3 Public Posts - Mon Nov 25, 2019

3674 views
1

Nov 27 2019 (22:21)
ghij950   738 blog posts
Re# 4496409-9              
SIMRAN (Satellite Imaging for Rail Navigation) developed by IIT-Kanpur and IR which was discontinued, and later IR decided to create a similar website on its own. SIMRAN was active during 2011 or 2011-12 as a pilot project. Information of some trains was shown including speed, location, current place late when info taken, Kms, Map (a software shold be downloded for map it can be done from that website also). HWH/ BCT (including AK)/ DBRG, DBRT/ TVC Raj, 12259/12260 SDAH Duronto, BPL/ ASR/ KLK/ LKO/ CNB Shatabdis were there.
Translate to English
Translate to Hindi

9882 views
0

Nov 27 2019 (22:24)
ghij950   738 blog posts
Re# 4496409-10              
Maybe ADI BRC: MPS 110 KMPH (mostprobably 130 kmph certified by RDSO which was earlier 110), VR BRC 130 KMPH
Translate to English
Translate to Hindi

1 Public Posts - Fri Nov 29, 2019

8554 views
0

Nov 30 2019 (21:33)
ghij950   738 blog posts
Re# 4496409-12              
I think there is no website like SIMRAN presently that shows speed.
Translate to English
Translate to Hindi

8351 views
0

Jan 05 2020 (22:17)
ghij950   738 blog posts
Re# 4496409-13              
Please give rate to the blogs those you like: Blogs about max permissible speed of some important routes.
Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 06, 2020
General Travel
6052 views
0

Oct 28 2019 (14:43)   12019/Howrah - Ranchi Shatabdi Express
ghij950
ghij950   738 blog posts
Entry# 4471424            Tags   Past Edits
18 years of extension has been completed today - an adulthood like a human. Last year 18 th day of extension was informed and today it is 19 th day of extension. 2019 Howrah Bokaro steel cIty Shatabdi was extended to ranchi on 28.10.2001. On that time a schedule was announced for shortwhile and another schedule was announced together which would replace the first after a shortwhile. First schedule having unchanged schedule like before extension between HWH GMO for RNC direction to avoid problem of passengers for new schedule having earlier depurture between HWH GMO for RNC direction and maybe without knowing second schedule some tickets had been sold. Maybe faster first schedule was not punctual (I was informed some days) - HWH 0645, RNC 1330, RNC 1400, HWH 2115. it was also announced same time that it will be replace by the schedule:
2019:
...
more...

HWH 0605 (subsequently 0615)
DGR 0745/0747
RNG ../.. No Halt
ASN 0817/0820 (Maybe 0814/0817)
DHN 0906/0910
GMO 0930/0945
CRP .../... No halt
BKSC 1027/1032
MURI 1131/1133 (Maybe 1129/1131)
RNC 1310
----------
2020:
RNC 1340
MURI 1515/1517
CRP .../... No halt
BKSC 1620/1625
GMO 1710/1725
DHN 1746/1750
ASN 1832/1835
RNG .../... No halt
DGR 1900/1902
HWH 2115
---
Structure EC 0 (Subsequently 1), CC 5 (subsequently 6), EOG 2, ICF rake. One EC had 46 seats, One CC had 70 or 67 depending on coach (maybe 67 only on that time).

Translate to English
Translate to Hindi
1 Followers
Poll
498109 views
98 votes
0

Nov 08 2018 (15:58)   22119/Mumbai CSMT - Madgaon Tejas Express
ghij950
ghij950   738 blog posts
Entry# 3984813            Tags   Past Edits
Which is your most travelled route since 2013 among these with mentioned conditions and classes of accomodation? ASR/DLI LDH should be edited as/ read as ASR LDH. All Non AC coaches like Non AC Sleeper, Non AC Second class (both reserved and unreserved) are NOT eligible. If by AC Chair Car (Not Garib Rath or Yuva type or 3/3 seats in all or most of the rows each) of Shatabdi, Duronto, Gatiman, Tejas, Super AC or similar standard only and not of any other. .. If by Anubhuti, AC First, AC Executive Chair, AC 2 T, AC 3 T (Except Garib rath, Yuva. If AC 3 T has side middle only Duronto is acceptable), 3 AC Economy (3 AC Economy of Duronto only) then any train. Route should be covered completely and not partially or not beyond the route but if your boarding/ deboarding station is not in the list, you...
more...
can vote for another station of same city/ urban agglomeration. If both ends of a journey are in UP then Ghaziabad passengers should vote for GZB and not for a station of Delhi - otherwise for Delhi. Gurgaon, Faridabad should vote for Delhi. Raniganj, Asansol are shown together. Passengers from stations around Panchkula town, SAS Nagar (Mohali) town can vote for CDG. All of these routes are connected by Shatabdi/ Shatabdi and Gatiman but other passengers also can vote as mentioned where nominated classes are not cheaper than Shatabdi AC Chair Car excluding catering charge (however there may be exception in first and initial few stages). Any station in Chandigarh, Panchkula, SAS Nagar (Mohali) to PNP could be included among the options. If you are willing to vote for this route, you can give reply post as new option inclusion is not possible.

Translate to English
Translate to Hindi
NO vote
NDLS/DLI ASR
5%
5
NDLS/DLI Jalandhar
5%
5
NDLS/DLI LDH
5%
5
ASR/DLI LDH
0%
0
NDLS/DLI KLK
0%
0
NDLS/DLI CDG
4%
4
NDLS/DLI PNP
1%
1
NDLS/ANVT/DLI - KGM/Haldwani
0%
0
NDLS/ANVT/DLI MB
1%
1
KGM/Haldwani MB
1%
1
GZB MB
2%
2
NDLS/GZB/DLI DDN
1%
1
NDLS/GZB/DLI Haridwar
1%
1
NDLS/DLI Saharanpur
0%
0
DDN Meerut
0%
0
GZB Saharanpur
0%
0
Meerut Haridwar
0%
0
NDLS/ANVT/DLI Kanpur
3%
3
NDLS/ANVT/DLI - LKO/LJN
1%
1
GZB Kanpur
2%
2
GZB LKO/LJN
2%
2
Aligarh Kanpur
1%
1
Aligarh LKO/LJN
0%
0
NDLS/NZM/DLI Mathura
2%
2
NDLS/NZM/DLI Agra Cantt
1%
1
NDLS/NZM/DLI GWL
0%
0
NDLS/NZM/DLI/Delhi Sarai Rohilla JHS
2%
2
NDLS/NZM/DLI/ Delhi Sarai Rohilla - BPL/HBJ
4%
4
BPL/HBJ Agra Cantt
0%
0
BPL/HBJ GWL
0%
0
NDLS/GGN JP/Gandhinagar Jaipur
4%
4
NDLS/GGN Ajmer/Dauri
2%
2
Ajmer/Dauri JP/Gandhinagar Jaipur
0%
0
HWH/SDAH/Kolkata NJP/Siliguri Jn
2%
2
HWH/SDAH/Kolkata Malda town
0%
0
HWH/SDAH/Kolkata Bolpur
1%
1
NJP/Siliguri Jn Malda Town
0%
0
HWH/SDAH/Kolkata DGR
2%
2
HWH/SDAH/Kolkata/SHM - ASN/RNG
3%
3
HWH/SDAH/Kolkata DHN
1%
1
HWH/Santragachi Bokaro St'l City
0%
0
HWH/Santragachi - RNC/Hatia
3%
3
RNC/Hatia DHN
1%
1
RNC/Hatia ASN/RNG
0%
0
RNC DGR
0%
0
HWH/santragachi/SHM BLS
0%
0
HWH/Santragachi/SHM CTC
2%
2
HWH/Santragachi/SHM BBS
0%
0
HWH/Santragachi/SHM PURI
0%
0
BBS BLS
0%
0
Mumbai Central/BDTS/Borivali/ADH ADI
5%
5
Mumbai Central/BDTS/Borivali/ADH Vadodara
0%
0
Mumbai Central/BDTS/Borivali/ADH Bharuch
0%
0
Mumbai Central/BDTS/Borivali/ADH Surat
1%
1
ADI Bharuch
0%
0
ADI Surat
1%
1
Surat Vadodara
0%
0
Secunderabad/Begumpet/HYB Kulbargi (Gulbarga)
3%
3
Secunderabad/Begumpet/HYB Solapur
1%
1
Secunderabad/Begumpet/HYB PUNE
0%
0
PUNE Solapur
2%
2
PUNE Kulbargi (Gulbarga)
2%
2
Chennai Central/PER KPD/Vellore Cantt
1%
1
Chennai Central/PER - KSR Bengaluru City/ Bengaluru Cant/YPR
17%
17
Chennai Central/PER MYS
0%
0
KSR Bengaluru City/ Bengaluru Cant - MYS
0%
0
KSR Bengaluru City/ Bengaluru Cant/YPR - KPD/Vellore Cantt
0%
0
Chennai Central/PER Salem
0%
0
Chennai Central/PER Erode
0%
0
Chennai Central/PER Tiruppur
0%
0
Chennai Central/PER Coimbatore
0%
0
Coimbatore Salem
0%
0
Coimbatore KPD/Vellore Cantt
0%
0

2 Public Posts - Thu Nov 08, 2018

1 Public Posts - Sun Nov 11, 2018

31334 views
0

Nov 12 2018 (21:37)
ghij950   738 blog posts
Re# 3984813-4               Past Edits
All of selected routes are connected by Shatabdi where nominated classes are not cheaper than Shatabdi AC Chair Car (however there may be exception in first and initial few stages) that means if a person opted for a class having at least Shatabdi AC Chair car fare excluding catering charge(or higher) or not.
Translate to English
Translate to Hindi

1 Public Posts - Wed Nov 14, 2018

1 Public Posts - Mon Mar 04, 2019

78414 views
0

Mar 05 2019 (21:45)
ghij950   738 blog posts
Re# 3984813-9              
After crossing 60 votes (64), MAS/PER to SBC/YPR is leading among most no of times travelled route by a voter since 2013 by Shatabdi CC or higher fare class (excluding catering charge) by Shatabdi or any train in Shatabdi routes and their parts . More votes are needed to get clear picture. Some popular routes are yet to open accounts.
Translate to English
Translate to Hindi

1 Public Posts - Wed Mar 06, 2019

1 Public Posts - Mon Mar 25, 2019

75277 views
0

Mar 26 2019 (21:57)
ghij950   738 blog posts
Re# 3984813-12               Past Edits
Mumbai Goa route was not included as cheaper 12051 JS can spoil vote for dearer classes but poll is created for classes having at least Shatabdi CC (exluding catering charge) fare or more but JS CC is cheaper. This route is not given only for The King of JS
Translate to English
Translate to Hindi
1 Followers
General Travel
274798 views
4

Feb 09 2019 (21:56)   12127/Mumbai CSMT - Pune Intercity SF Express
ghij950
ghij950   738 blog posts
Entry# 4224060            Tags   Past Edits
Former Shatabdi Express trains:
Note: Some stoppages may be missed. Some important non-stopping stations might not be always non-stopping and some stoppages might not be always stoppages.
2025/2026 Bangalore city Hubli during 1995-96 with halt at Arsikere. Announcement may be in Rail Budget 1995 online.
New Delhi - Kathgodam in 1995 and/or1996 was most probably existed as it was in fare structure of
...
more...
TRAINS AT A GLANCE 1996 but not in table and most probably fare table was before time table session. (present one was introduced after a long time of withdrawing).
203x/203x (x=?) Secunderabad Rajhmundry (during 1999) with halts at Vijayawada, Eluru and used to skip Warangal.
2023/2024 Chennai central Coimbatore during 1995-2000) with halts at Salem, Erode, Tiruppur and used to skip Katpadi, Jolerpettai. Its announcement may be in Rail Budget 1995 online.. (present one was introduced after a long time of withdrawing with Duronto service pattern and later service pattern was changed to Shatabdi). Maybe according to a web link maybe of The Hindu: Jul 1, 2000 - The General Manager said the Chennai-Coimbatore Inter- City Express would replacethe Coimbatore Shatabdi Express
New Delhi Bhatinda. (in 2002). Maybe according to a web link maybe of hindustan times: Amid suspense over train route, … Oct 28, 2014 - In 2002, the Delhi-bound Shatabdi express was flagged off... It had five stops at Barnala, Dhuri, Patiala, Rajpura and Ambala during its to and fro journey.
New Delhi Breilly during 2002 and/or 2003. Maybe as per Outlook web link: Introduced and Cancelled: Dec 8, 2018 - The New Delhi-Bareilly Shatabdi had only a short life of a few months, …
2021/2022 Howrah Rourkela, (between Howrah and Rourkela during 1995-2002, between Howrah and Tatanagar during 2002-03 with halts at Kharagpur, Tatanagar, Chakradharpur (Chakradharpur was before making the route shorter). Its announcement may be in Rail Budget 1995 online.
Maybe according to a web link maybe of The Telegraph: Green nod to new Jan Shatabdi destination - Telegraph India May 8, 2003 - The South Eastern Railway has decided to extend the existing Howrah-Tata Jan Shatabdi Express to Barbil from May 15. … The Shatabdi Express which was running between Howrah and Tata was withdrawn in March after the railways incurred a huge loss. The Jan Shatabdi Express was instead introduced from March 2.
CAG website (maybe) Review on Passenger Revenue Management in Indian Railways: Train Nos.2021/ 2022 which was earlier running as Shatabdi Express between Howrah -Rourkela was converted to run as Jan Shatabdi Express from 2 March 2003 between Howrah - Tata. With a view to improve the occupancy of the train, its run was extended up to Barbil with effect from 15 May 2003
2023/2024 Howrah Patna (2001-2003) with halts at Durgapur, Asansol, Madhupur, Jasidih, Lakshisarai, Mokama (At first no halt at Durgapur, Madhupur) and used to skip Bardhaman, Raniganj. Maybe according to a weblink maybe of: THE TIMES OF INDIA Patna-Howrah Shatabdi may be replaced by Janshatabdi Jan 30, 2003 DANAPUR: The Patna-Howrah Shatabdi Express, launched with launched with much fanfare by railway minister Nitish Kumar barely 14 months ago, is likely to be replaced by a Janshatabdi Express in the next financial year.
Maybe according to a web link maybe of THE HINDU: Thursday, Oct 02, 2003 A Shatabdi service grinds to a halt PATNA OCT.1. The 2023 and 2024 pair of Shatabdi Express between Howrah and Patna is, perhaps, the only one of this super category chain of trains to have been withdrawn after a two-year run.
2027/2028 Mumbai CST Pune (1995-2004) with halts at Dadar, Lonavala (at first no commercial halt) and used to skip Kalyan. Maybe according to a web link maybe of TIMES OF INDIA Good news for Shatabdi commuters Mar 4, 2004 - PUNE: Commuters have welcomed the Central Railway (CR) decision to introduce the Mumbai-Pune superfast intercity express in place of the Mumbai-Pune Shatabdi express. Started in 1995,
12035/12036 Jaipur - Agra Fort (2012-2018) with halts at Gandhi Nagar Jaipur (at first no halt at Gandhi Nagar Jaipur), Bharatpur. Maybe according to a web link maybe of Press Information Mumbai (Govt link? Nov 21, 2012 - The new trains will be flagged off from respective railway stations within next ... 12035/12036 Jaipur-Agra Shatabdi Express (6 days a week). Maybe according to a web link maybe of hindustan times Apr 13, 2018 - The Jaipur-Agra Fort-Jaipur Shatabdi Express will be replaced by a new train Ajmer-Agra Fort-Ajmer Superfast Express from May 1.
Chennai central - Tirupati was in time table 1999 but most probably was not introduced. Its announcement may be in Rail Budget 1998 online.

Translate to English
Translate to Hindi

107069 views
3

Mar 05 2019 (21:38)
ghij950   738 blog posts
Re# 4224060-1               Past Edits
Probably - List of withdrawn Shatabdi (without brief discussion and source):
2025/2026 Bangalore city Hubli during 1995-96
New Delhi - Kathgodam in 1995 and/or1996 (present one was introduced after a long time of withdrawing).
203x/203x (x=?) Secunderabad Rajhmundry (during 1999)
2023/2024
...
more...
Chennai central Coimbatore during 1995-2000)
New Delhi Bhatinda via Ambala Cantt. (in 2002).
New Delhi Breilly during 2002 and/or 2003
2021/2022 Howrah Rourkela, (between Howrah and Rourkela during 1995-2002, between Howrah and Tatanagar during 2002-03
2023/2024 Howrah Patna (2001-2003)
2027/2028 Mumbai CST Pune (1995-2004).
12035/12036 Jaipur - Agra Fort (2012-2018).
Chennai central - Tirupati was in time table 1999 but most probably was not introduced. Its announcement may be in Rail Budget 1995 online.

Translate to English
Translate to Hindi

1 Public Posts - Thu Oct 10, 2019

1 Public Posts - Mon Dec 23, 2019
Page#    293 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5955786 ★★★ 32fanof12801~
4166957 ★★★ 233AvishekRay~
6009800 ★★ 25jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy