Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Fri Sep 19, 2014 19:20:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Posts by Rohit Sharma
Page#    Showing 1 to 3 of 3 blog entries  
Predictions: 18
confirm: 17
rac: 0
wl: 1
Journey: Thu Jun 28, 2012 @ 09:00
12920/Malwa Express
Entry# 465978
   Posted by: Rohit Sharma   0 blog posts   10 correct pred (66% accurate)
PNR: 233-xxxxxxx (E-Ticket)   |   Sleeper - SL   |   Tot Seats: Avbl 144   |   Charting: < 05:31   |   Similar PNRs
JAT/Jammu Tawi   to   NDLS/New Delhi   |   577 km / 1544 km
Original Status as of: Jun 27 2012 (11:01AM)
Passenger 1: Waitlist# 13 (Booking Status: W/L 21,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 27 2012 (8:30PM)
Passenger 1: SEC,9 (Booking Status: W/L 21,CK)
Chart PREPARED

818 views
Jun 27 2012 (8:30PM)        

rdb**   20616 blog posts   252522 correct pred (77% accurate)  
Re# 465978-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
SEC....

2 posts - Wed Jun 27, 2012 - are hidden. Click to open.

1 posts - Thu Jun 28, 2012 - are hidden. Click to open.
Predictions: 16
confirm: 9
rac: 0
wl: 7
Journey: Wed Jun 27, 2012 @ 09:00
12920/Malwa Express
Entry# 465323
   Posted by: Rohit Sharma   0 blog posts   10 correct pred (66% accurate)
PNR: 270-xxxxxxx (E-Ticket)   |   Sleeper - SL   |   Tot Seats: Avbl 144   |   Charting: < 05:30   |   Similar PNRs
JAT/Jammu Tawi   to   INDB/Indore Junction BG   |   1544 km / 1544 km
Original Status as of: Jun 26 2012 (2:33PM)
Passenger 1: Waitlist# 30 (Booking Status: W/L 30,CK)
Passenger 2: Waitlist# 31 (Booking Status: W/L 31,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 26 2012 (8:44PM)
Passenger 1: SX3,6 (Booking Status: W/L 30,CK)
Passenger 2: SX3,7 (Booking Status: W/L 31,CK)
Chart PREPARED

771 views
Jun 26 2012 (8:32PM)        

Soumitra Chawathe**   27213 blog posts   66396 correct pred (69% accurate)  
Re# 465323-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
SX3....My God!!

2 posts - Tue Jun 26, 2012 - are hidden. Click to open.
Predictions: 17
confirm: 12
rac: 0
wl: 5
Journey: Tue Jun 26, 2012 @ 19:40
12426/Jammu Tawi-New Delhi Rajdhani Express
Entry# 465126
   Posted by: Rohit Sharma   0 blog posts   10 correct pred (66% accurate)
PNR: 233-xxxxxxx (E-Ticket)   |   AC 3-tier - 3A   |   Tot Seats: Avbl 166   |   Charting: < 11:45   |   Similar PNRs
JAT/Jammu Tawi   to   NDLS/New Delhi   |   577 km / 577 km
Original Status as of: Jun 26 2012 (12:12PM)
Passenger 1: Waitlist# 33 (Booking Status: W/L 67,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 26 2012 (5:39PM)
Passenger 1: BE,44/Coach Position:12 (Booking Status: W/L 67,CK)
Chart PREPARED

292 views
Jun 26 2012 (6:37PM)        

rdb**   20616 blog posts   252522 correct pred (77% accurate)  
Re# 465126-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
BE
Page#    3 blog entries  

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Sep 29, 2014
Trains with ARP 30 Dep on: Sun Oct 19, 2014
Trains with ARP 60 Dep on: Tue Nov 18, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom