Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 08:35:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
Convenient timings and safe buffer at xfer

5266/Σ Shri Ganganagar- Dibrugarh link ΣChain


Created: Mar 24 2012 (19:56) by KrisGopal^~

Change Departure Station:
Change Arrival Station:

22
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 465 blog entries  next>>
Rail News
6590 views
0

IR Affairs
NER/North Eastern
Sep 11 (11:12)   Gonda Train Accident: Initial Report Points to Track Malfunction, Recommendations Issued

AdittyaaSharma^~   73345 news posts
Entry# 6186339   News Entry# 568967         Tags   Past Edits
ट्रैक में खराबी से पलटी थीं बोगियां, सामने आई गोण्डा ट्रेन हादसे की शुरुआती रिपोर्ट

An initial investigation report regarding the train accident in Gonda, Uttar Pradesh has been released. The Commissioner of Railway Safety (CRS) report indicates that the accident was caused by a track malfunction. The report, released on September 5th, includes several key recommendations. The report suggests that three to four individuals could...
more...
be held responsible, including the operations department. The station master at the accident site is also blamed for failing to take necessary precautions. Detailed information will be provided in the final report. On July 18th, the Chandigarh-Dibrugarh Express derailed near Jhilahi in Gonda, with six coaches overturning. The accident resulted in four deaths and 25 injuries. Following the accident, rescue operations were initiated, and a CRS investigation was ordered. The investigation involved questioning officials and staff related to railway safety, security, signaling, engineering, mechanical, and traffic. Train number 15904, departing from Chandigarh on the night of July 17th at 11:59 PM, was traveling at a speed of 90 kilometers per hour. It reached Gonda railway station at 2:25 PM on July 18th and left at 2:28 PM. The train derailed and overturned at 2:41 PM, between Motiganj and Jhilahi Bazaar, around 18 kilometers from Gonda headquarters. Of the train's 24 coaches, 14 derailed, including six AC coaches and two coaches following the engine.

Gonda, Uttar Pradesh mein train accident ki shuruati jaanch report aa gayi hai. Commissioner of Railway Safety (CRS) ki report ke anusar track mein gadbadi ke karan hadsa hua tha. 5 September ko jaari report mein CRS dwara kuchh ahem sifarishen bhi ki gayi hain. Bataaya ja raha hai ki teen...
more...
se chaar log isme zimmedar thahraaye ja sakte hain. Shuruati report mein parichalan vibhag ko bhi zimmedar mana gaya hai. Report mein bataya gaya hai ki ghatna sthala ke station master ne caution lene mein tatparta nahin dikhayi. Vishtrit jaankari final report mein aayegi. 18 July ko Gonda ke Jhilahi ke paas Chandigarh-Dibrugarh Express durghnatnagrast ho gayi thi, jiski chhe bogियां palat gayi thi. Hadse mein chaar yaatriyon ki maut ho gayi thi, jabki 25 ghayal ho gaye the. Hadse ke turant baad bachhav kaam shuru karne ke sath hi CRS jaanch ke aadesh bhi jaari kar diye gaye the. Jaanch mein railway suraksha, suraksha, signal, engineering, yaantrik aur traffic se jude adhikariyon aur karmachariyon se poochhtaach ki gayi thi. 90 kilometer pratighante thi raftaar Train number 15904 Chandigarh se 17 July ki raat 11.59 baje ravana hui thi. 18 July ko train Gonda railway station par dopahar 2.25 baje pahunchi aur 2.28 baje yahaan se nikli. Jaankari ke anusar, hadse ke samay train ki raftaar 90 km pratighante se adhik thi. Track se utar gaye the 6 coach Train Gonda railway station par dopahar 2.25 baje pahunchi aur 2.28 baje yahaan se nikli. Gonda muख्यालय se karib 18 kilometer door Motiganj-Jhilahi bazaar ke beech 2.41 baje train bepatri ho kar palat gayi. 24 coach wali train ke ek-ek kar 14 coach patri se utar gaye, jinmen se engine ke baad lage do coach samay AC ki chhe bogियां palat gayi thi.
Rail Fanning
16079 views
4

Aug 31 (10:36)   15904/Chandigarh - Dibrugarh Express (PT) | LKO/Lucknow Charbagh NR (9 PFs)
kirk781^~   4140 blog posts
Entry# 6174042            Tags  
1 compliments
Great:The EMD liveries of AMV. Beautiful.
DBRT bound train standing at PF#1 of LKO NR.
Translate to English
Translate to Hindi
Rail News
46245 views
0

IR Affairs
Sep 01 (07:06)   Track Repairs to Disrupt Train Services in Bareilly

Track_diaries^~   4801 news posts
Entry# 6174918   News Entry# 567518         Tags   Past Edits
Railway News: दो दिन मेगा ब्लॉक... 21 ट्रेनों का रूट बदला, राजधानी समेत चार गाड़ियां देरी से चलेंगी

Due to track repairs on the Gonda-Gorakhpur railway line, 25 trains passing through Bareilly will be affected on September 3rd and 4th. 21 trains will be rerouted, and four trains, including the Rajdhani Express, will be delayed by four hours.

Gonda-Gorakhpur railway line pe track repair ke kaam ki wajah se, Bareilly se guzarne wali 25 trains 3 aur 4 September ko affect honge. 21 trains ko route change kiya jayega, aur Rajdhani Express samit 4 trains 4 ghanta late chalenge.
Rail News
21633 views
0

IR Affairs
NFR/Northeast Frontier
Aug 31 (19:53)   Katihar Chamber Demands Restoration of Train Services and Halts at Stations

Exynos9611~   19232 news posts
Entry# 6174471   News Entry# 567446         Tags   Past Edits
कटिहार : सालमारी व्यवसायी हित के लिए चैम्बर प्रतिबद्ध : भुवन अग्रवाल

The Katihar North Eastern Bihar Chamber of Commerce and Industry has submitted a memorandum to the General Manager of NF Railway demanding the restoration of various train services and halts at stations. The chamber's General Secretary highlighted issues faced by business travelers, specifically the discontinuation of the Katihar-Barsoi 75747/75748 train pair,...
more...
the removal of stops for the Katihar-Siliguri-Katihar Intercity Express 15719/15720 at Sudhani and Telta, and the discontinuation of stops for the Uttar Bang Express and Kamrup Express 15960/15959 at Barsoi Junction, and Kanchanjangha Express at Azamnagar Road station. The chamber also requested the immediate commencement of the Katihar-Anand Vihar Terminal train announced on March 15, 2024, and urged for halts at Salmari station for trains like Dibrugarh-Chandigarh 15903/15904, Kamrup-Anand Vihar 15621/15622, Devghar-Agartala 15625/15626, and Vande Bharat 22233/22234. They also demanded the reconstitution of the Salmari Station Advisory Committee.

Katihar North Eastern Bihar Chamber of Commerce and Industry ne NF Railway ke General Manager ko ek memorandum submit kiya hai, jisme unhone alag alag train services ko restore karne aur stations par halts dene ki demand ki hai. Chamber ke General Secretary ne business travelers ko aane wali problems ko...
more...
highlight kiya, jaise ki Katihar-Barsoi 75747/75748 train pair ka band hona, Katihar-Siliguri-Katihar Intercity Express 15719/15720 ka Sudhani aur Telta par stops hatana, aur Uttar Bang Express aur Kamrup Express 15960/15959 ka Barsoi Junction aur Kanchanjangha Express ka Azamnagar Road station par stops hatana. Chamber ne yeh bhi demand kiya ki 15 March, 2024 ko announce kiya gaya Katihar-Anand Vihar Terminal train ka operation jaldi se start kiya jaaye, aur Salmari station par Dibrugarh-Chandigarh 15903/15904, Kamrup-Anand Vihar 15621/15622, Devghar-Agartala 15625/15626, aur Vande Bharat 22233/22234 jaise trains ke liye halts diye jaaye. Unhone Salmari Station Advisory Committee ko reconstitute karne ki bhi demand ki.
यूपी में महीनेभर में दो ट्रेन डिरेल हुई। 18 जुलाई की दोपहर गोंडा में चंडीगढ़-डिब्रूगढ़ एक्सप्रेस की 21 बोगियां पटरी से उतर गईं। फिर 17 अगस्त...
UP में ट्रेन गुजरने से पहले ट्रैक चेक होंगे:हादसों के बाद सुपर चेक्स टीम बनाई, देखेंगे पटरी पर कोई खतरा तो नहीं; वीडियो भी बनाना होगा
Page#    Showing 1 to 5 of 465 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy