Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Aug 8 22:04:39 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
Bi weekly

7015/Σ Mysore gorakhpur superfast ΣChain


Created: Jul 25 2012 (14:26) by guest

Change Departure Station:
Change Arrival Station:

01
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 1179 blog entries  next>>
Info Update
258993 views
1

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   529 blog posts
Entry# 6143019            Tags   Past Edits
1 compliments
Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
Rail Fanning
33458 views
5

Jul 29 (09:50)   12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT) | BV/Babhnan (2 PFs)
kirk781^~   3849 blog posts
Entry# 6139269            Tags  
4 compliments
Great Great Great Great
This also happened nearly two decades ago.We used to go from LJN to home station BV via LJN-BJU Express. That train today has RSA with LJN-JBP Express [though it is not strictly needed given double electrified tracks all along]. But back in the day, it was diesel tracks, much of it single line with a honking WDM-3D/A in tow and worst of all, no RSA. So the rake that used to come, same rake used to reverse from LJN.The turn around time was 2.5 hours but the train used to come terribly late and of course, would need easily ~1 hr for rakes to reverse and more importantly, passengers to board from souce. It didn't help that all trains then coming to NER used to undergo LR at LJN and almost all got higher priority than this crawler.
...
more...

This train often used to depart couple of hours late from source itself and would reach my destination much later in the night. So, what we did was board the Rapti Sagar Express [which doesn't stop at Babhnan], assumed it would over take the GD-GKP passenger somewhere b/w GD and Mankapur and we'll deboard at Mankapur and board the passenger upto our destination 30 kms away. Well, that didn't happen. The Rapti Sagar was slightly late and the passenger wasn't overtaken after Mankapur station had crossed. We OT the passenger and after that had an unscheduled halt ~10 kms before our destination. But of course, Rapti Sagar's next stop was Basti, so we deboarded the train and were then in the middle of two stations at ~2000 hrs. One was "Parsa Tewari", 1 km ahead and other was "Babhan Jyotia", 1 km before. We decided to walk/run with our luggage towards "Babhan Jyotia" since the previous station was newly built and we didn't knew if the passenger will halt there or not. We reached there in ~10 mins or so. Waited a few mins for the passenger and then boarded it. Reached our destination after 20 minutes more.

Translate to English
Translate to Hindi

29212 views
1

Jul 29 (10:32)
kjmwag9hc
kjmwag9hc   893 blog posts
Re# 6139269-1              
Quite an adventure. :D
Translate to English
Translate to Hindi

18385 views
1

Aug 01 (09:43)
kirk781^~   3849 blog posts
Re# 6139269-2              
1 compliments
Useful
It was weird in those days with no double tracks meaning most stations had only 1 main platform and no PF #2 to speak of [and no FOB as well]. I remember another case where Avadh Express was to come at 'Babhnan' . The third , loop line was taken by a goods train. Since it was a single line section, a non stopping train was looped at the FIRST track[main platform] and the train which had the actual stoppage [Avadh Express] came at the middle one. What were the passengers supposed to do? We deboarded on the rail tracks. After waiting for a minute sandwiched b/w two stationery trains, both of them started moving in opposite directions and we were now sandwiched for a minute between 2 MOVING trains, which was worse.
...
more...

The conditions are much better now. With dual platforms, it means the train will always arrive at a proper platform, no matter how bad the station is and there will be a proper FOB to guide you home[ except for at halt stations]. That being said, many people don't bother to use the FOB and would rather still risk the rail tracks in the dead of the night for saving couple of minutes.

Translate to English
Translate to Hindi
General Travel
31902 views
6

Jul 30 (13:30)   12008/Mysuru - MGR Chennai Central Shatabdi Express
nngg0219
nngg0219   87 blog posts
Entry# 6140404            Tags  
Its really pathetic to see the occupancy of Mysuru Chennai Shatabdi post the introduction of Vande Bharat which is also not running with 100% occupancy during weekdays.. Something should be done for this shatabdi..... What can be done??
Translate to English
Translate to Hindi

23 Posts

8298 views
1

Jul 31 (16:48)
Vinay_Mysuru^~
Vinay_Mysuru^~   8144 blog posts
Re# 6140404-24              
Intention of our beloved Rail Minister is to destroy Shatabdi and introduce the useless Vande Bharat. This is fulfilling his ambitions
Translate to English
Translate to Hindi

6676 views
1

Jul 31 (19:35)
SWRailway^~
SWRailway^~   13508 blog posts
Re# 6140404-25              
People are preferring VB over Shatabdi due to advantage in every aspect
Translate to English
Translate to Hindi

6175 views
2

Jul 31 (19:42)
Exynos9611~
Exynos9611~   20712 blog posts
Re# 6140404-26              
1 compliments
Useful
once upon a time mys shatabdi was ruling on mas mys route now getting ruined by vb
Translate to English
Translate to Hindi

5067 views
1

Jul 31 (20:31)
SWRailway^~
SWRailway^~   13508 blog posts
Re# 6140404-27              
When VB offers much VFM it doesn't make sense for people to prefer Shatabdi unless VB is in huge wl
Translate to English
Translate to Hindi

4024 views
0

Jul 31 (20:53)
kjmwag9hc
kjmwag9hc   893 blog posts
Re# 6140404-28              
VB is better in comfort and speed;shtb is unnecessary slow TT
Translate to English
Translate to Hindi
General Travel
49028 views
9

Jul 21 (16:39)   12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT) | KRLA/Koratla (2 PFs) | RPM/WAP-7/30783
Srikar_lucky^~
Srikar_lucky^~   3181 blog posts
Entry# 6132094            Tags   Past Edits
3 compliments
Great Great Great
PDPL-NZB Route Temporarily Diverted Trains (Part-1)
12512 Kochuveli - Gorakhpur Raptisagar SF Express skipping Korutla
Link :- click here
Please do Watch, Like, Share and Subscribe ЁЯЩПЁЯП╗
Translate to English
Translate to Hindi

More Posts
Info Update
493583 views
0

Jun 20 (16:41)   20103/Mumbai LTT - Gorakhpur SF Express (Via Kanpur) (PT) | TH/Tinich (2 PFs)
Kumaon_Tiger^~
Kumaon_Tiger^~   40660 blog posts
Entry# 6101088            Tags   Past Edits
Cancelation, Regulation, Short Termination, Diversion of Trains due to pre-non-interlock from 21st to 24th June, 2024 for NMCL Gatishakti siding connectivity work and non-interlock work on 25th and 26th June, 2024 at Tinich station of Lucknow division for upgradation of passenger facilities and operational ease.
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 1179 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy