Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Sun Apr 20, 2014 02:21:46 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
What is the Electrification progress along the BSB-SLN-LKO route?  
32 Answers
Jan 26 2012 (11:49AM)

General

Entry# 980     
н ∂ ק**  
What is the Electrification progress along the BSB-SLN-LKO route?

Jan 28 2013 (11:05PM)
Blog Post# 654925-0       
н ∂ ק**     Added by: н ∂ ק**    Feb 16 2013 (5:36PM)
First Electric ALIVE WAG Loco Spotted at Maharani Pachim Varanasi-Lucknow newly electrified strech
++++++++++++++++++++++++++
THIS was the first catch of electric loco at Maaharani Paschim a small station at BSB-LKO strech.Capturted by me while travelling on Shramjeevi Superfast Express 12391
this loco seems to be WAG 7
++++++++++++++++++++++++++
Speed of Shramjeevi is very high passseed in seceonds

Feb 20 2012 (12:03AM)
Blog Post# 353582-0       
Mohd Arif**     Added by: н ∂ ק**    Feb 20 2012 (3:44AM)
rare video of DRM spl train at sln jn ,, drm comes sln for seeing progress of electrification work
video shot by me

Dec 29 2011 (1:02AM)
Blog Post# 314287-13       
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (11:49AM)
22122011042.jpgthis train[and sum other] comes sln jn for electrification

11850 views
Jan 05 2012 (10:55PM)
Blog Post# 314287-23     
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (11:51AM)
ya ,, i think is year me last tak start ho jayege ,,

11799 views
Jan 05 2012 (11:57PM)
Blog Post# 314287-27       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:52AM)
haan yeh gud news hai
bandhua se aagey tak wiring ka bhi kaam pura ho chuka hai
station pe bhi jaldi hi pura ho jayega
BSB ki taraf kaam slow ho gya the beech me qki cement ki bori chori ho ja rahi thi
par ab sab theek chal raha hai

11739 views
Jan 09 2012 (11:58PM)
Blog Post# 314287-30       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:53AM)
61.jpgone more

Jan 12 2012 (9:44PM)
Blog Post# 314287-115     
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (11:55AM)
sir i think OHE Inspection Van is here for wiring near sln jn ,, as the Electrical wiring work starts frm last 2-3week near sln jn

11944 views
Jan 12 2012 (10:29PM)
Blog Post# 314287-117       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:56AM)
e1.jpglatest snap of electrification
how is this

11881 views
Jan 12 2012 (10:32PM)
Blog Post# 314287-119       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:57AM)
e2.jpgone more

Jan 12 2012 (11:31PM)
Blog Post# 314287-123       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:58AM)
one clip showing the same
taken today

11937 views
Jan 16 2012 (12:40AM)
Blog Post# 314287-153       
н ∂ ק**     Added by: н ∂ ק**    Jan 26 2012 (11:59AM)
mrng.jpgSubah 6 bje ye haal hai yeh mujhe varanasi jana tha himmat jawab de di

Jan 25 2012 (10:47PM)
Blog Post# 314287-174       
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (12:00PM)
25012012103.jpgnow u can see electric poles poles at sln jn. work going on really fast

Jan 25 2012 (10:50PM)
Blog Post# 314287-175       
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (12:00PM)
25012012104.jpgmore pic

11716 views
Jan 25 2012 (10:53PM)
Blog Post# 314287-177       
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (12:01PM)
25012012105.jpgRU VAN

11683 views
Jan 25 2012 (11:01PM)
Blog Post# 314287-179       
Mohd Arif**     Added by: н ∂ ק**    Jan 26 2012 (12:01PM)
25012012107.jpgfrom ground

Jan 25 2012 (11:41PM)
Blog Post# 314287-184       
rangcharylutk**     Added by: н ∂ ק**    Jan 26 2012 (12:02PM)
RLY ELECtRIFICATION job is very though job and takes some time due to traffic,the phases involved
1.survey,2,drawing and plans,3,printing of drawing and taking approval (which includes future development of stations,yards etc,4.material ordering,5,pit preparation,concreting,erection of poles,grouting,fixing fixtures to poles inspection of insulators to replace any cracked ones,construction of substations wiring charging (tosafe guard copper from theft) test run and finally allowing to commercial use....

11083 views
Jan 27 2012 (11:04PM)
Blog Post# 314287-197       
Mohd Arif**     Added by: н ∂ ק**    Jan 28 2012 (1:55AM)
little video about sln jn electrification work
video taken by me

Jan 28 2012 (2:44AM)
Blog Post# 314287-199       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:22PM)
40025715647790446443410000306677541820920015198292.jpgkindly see the behind view of the electric pole
wire streching is still pending
a shot of lambhua station (SLN-BSB route)
also can see the single track

Jan 28 2012 (2:52AM)
Blog Post# 314287-200       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:22PM)
image1515.jpgcan see the work in progress :)
todays snap

Jan 28 2012 (3:53AM)
Blog Post# 314287-201       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:22PM)
sn.jpgnight view :)

Jan 28 2012 (3:55AM)
Blog Post# 314287-202       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:24PM)
image1516.jpgworkers working their best

Jan 28 2012 (3:58AM)
Blog Post# 314287-204       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:24PM)
image1517.jpgold signals present @SLN

10475 views
Jan 28 2012 (4:02AM)
Blog Post# 314287-206       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:26PM)
image1518.jpgnew electronic signals are ready to take its new place

10455 views
Jan 28 2012 (4:04AM)
Blog Post# 314287-207       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:27PM)
image1519.jpgone more

Jan 28 2012 (4:05AM)
Blog Post# 314287-208       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:28PM)
image1520.jpgour station board

Jan 28 2012 (4:09AM)
Blog Post# 314287-210       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:28PM)
image1521.jpgcan see the poles erected beside the station

Jan 28 2012 (4:10AM)
Blog Post# 314287-211       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:29PM)
image1522.jpghere u can also see some poles

Jan 28 2012 (4:13AM)
Blog Post# 314287-213       
н ∂ ק**     Added by: н ∂ ק**    Jan 30 2012 (11:29PM)
image1523.jpgthe space maintained to erect the poles

Jan 28 2012 (12:48PM)
Blog Post# 314287-216     
rangcharylutk**     Added by: н ∂ ק**    Jan 30 2012 (11:30PM)
yes i hv seen,,both veidio and your photo with poles, after poles lot of work left,wiring,most erection,earthing,jointing rails or putting spring wires as joints (rails are earthing points) adjusting,seperate wiring for return conductors to avoid distrubance to telephone signals,fixing cautoion boards,fixing counterweights depending upon the weather etc..of work left

Jan 31 2012 (2:22AM)
Blog Post# 314287-227       
н ∂ ק**     Added by: н ∂ ק**    Feb 20 2012 (3:47AM)
how is this ??
my new creation :)

Feb 04 2012 (10:44PM)
Blog Post# 314287-232       
Mohd Arif**     Added by: н ∂ ק**    Feb 20 2012 (3:47AM)
little video about sln jn electrification work [part2]
video taken by me

Feb 19 2012 (11:54PM)
Blog Post# 314287-257       
Mohd Arif**     Added by: н ∂ ק**    Feb 20 2012 (3:48AM)
19022012057.jpgelectrification work is nearly completed
Scroll to Top
Scroll to Bottom