Disclaimer   
Search Trains
 ♦ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3E
Type:
 

Train Details
Words:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
2-month Availability Calendar
  Go  
 
Mon Jul 6, 2015 00:54:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Mon Jul 6, 2015 00:54:07 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipModify Search
What is the Electrification progress along the BSB-SLN-LKO route?  
32 Answers
Jan 26 2012 (11:49AM)

General

Entry# 980     
UP44**  
What is the Electrification progress along the BSB-SLN-LKO route?

★★★  Rail Fanning
2 Followers
11576 views
Jan 28 2013 (11:05PM)
Blog Post# 654925-0     
UP44**     Added by: UP44**    Feb 16 2013 (5:36PM)
First Electric ALIVE WAG Loco Spotted at Maharani Pachim Varanasi-Lucknow newly electrified strech
++++++++++++++++++++++++++
THIS was the first catch of electric loco at Maaharani Paschim a small station at BSB-LKO strech.Capturted by me while travelling on Shramjeevi Superfast Express 12391
this loco seems to be WAG 7
++++++++++++++++++++++++++
Speed of Shramjeevi is very high passseed in seceonds

★  
0 Followers
7472 views
Feb 20 2012 (12:03AM)
Blog Post# 353582-0     
Mohd Arif**     Added by: UP44**    Feb 20 2012 (3:44AM)
rare video of DRM spl train at sln jn ,, drm comes sln for seeing progress of electrification work
video shot by me

Dec 29 2011 (1:02AM)
Blog Post# 314287-13     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (11:49AM)
this train[and sum other] comes sln jn for electrification

12226 views
Jan 05 2012 (10:55PM)
Blog Post# 314287-23     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (11:51AM)
ya ,, i think is year me last tak start ho jayege ,,

12173 views
Jan 05 2012 (11:57PM)
Blog Post# 314287-27     
UP44**     Added by: UP44**    Jan 26 2012 (11:52AM)
haan yeh gud news hai
bandhua se aagey tak wiring ka bhi kaam pura ho chuka hai
station pe bhi jaldi hi pura ho jayega
BSB ki taraf kaam slow ho gya the beech me qki cement ki bori chori ho ja rahi thi
par ab sab theek chal raha hai

★  
12113 views
Jan 09 2012 (11:58PM)
Blog Post# 314287-30     
UP44**     Added by: UP44**    Jan 26 2012 (11:53AM)
one more

Jan 12 2012 (9:44PM)
Blog Post# 314287-115     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (11:55AM)
sir i think OHE Inspection Van is here for wiring near sln jn ,, as the Electrical wiring work starts frm last 2-3week near sln jn

★  
12324 views
Jan 12 2012 (10:29PM)
Blog Post# 314287-117     
UP44**     Added by: UP44**    Jan 26 2012 (11:56AM)
latest snap of electrification
how is this

★  
12253 views
Jan 12 2012 (10:32PM)
Blog Post# 314287-119     
UP44**     Added by: UP44**    Jan 26 2012 (11:57AM)
one more

★  
Jan 12 2012 (11:31PM)
Blog Post# 314287-123     
UP44**     Added by: UP44**    Jan 26 2012 (11:58AM)
one clip showing the same
taken today

★  
12315 views
Jan 16 2012 (12:40AM)
Blog Post# 314287-153     
UP44**     Added by: UP44**    Jan 26 2012 (11:59AM)
Subah 6 bje ye haal hai yeh mujhe varanasi jana tha himmat jawab de di

Jan 25 2012 (10:47PM)
Blog Post# 314287-174     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (12:00PM)
now u can see electric poles poles at sln jn. work going on really fast

Jan 25 2012 (10:50PM)
Blog Post# 314287-175     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (12:00PM)
more pic

12092 views
Jan 25 2012 (10:53PM)
Blog Post# 314287-177     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (12:01PM)
RU VAN

12060 views
Jan 25 2012 (11:01PM)
Blog Post# 314287-179     
Mohd Arif**     Added by: UP44**    Jan 26 2012 (12:01PM)
from ground

Jan 25 2012 (11:41PM)
Blog Post# 314287-184     
rangcharylutk**     Added by: UP44**    Jan 26 2012 (12:02PM)
RLY ELECtRIFICATION job is very though job and takes some time due to traffic,the phases involved
1.survey,2,drawing and plans,3,printing of drawing and taking approval (which includes future development of stations,yards etc,4.material ordering,5,pit preparation,concreting,erection of poles,grouting,fixing fixtures to poles inspection of insulators to replace any cracked ones,construction of substations wiring charging (tosafe guard copper from theft) test run and finally allowing to commercial use....

11459 views
Jan 27 2012 (11:04PM)
Blog Post# 314287-197     
Mohd Arif**     Added by: UP44**    Jan 28 2012 (1:55AM)
little video about sln jn electrification work
video taken by me

★  
Jan 28 2012 (2:44AM)
Blog Post# 314287-199     
UP44**     Added by: UP44**    Jan 30 2012 (11:22PM)
kindly see the behind view of the electric pole
wire streching is still pending
a shot of lambhua station (SLN-BSB route)
also can see the single track

★  
Jan 28 2012 (2:52AM)
Blog Post# 314287-200     
UP44**     Added by: UP44**    Jan 30 2012 (11:22PM)
can see the work in progress :)
todays snap

★  
Jan 28 2012 (3:53AM)
Blog Post# 314287-201     
UP44**     Added by: UP44**    Jan 30 2012 (11:22PM)
night view :)

★  
Jan 28 2012 (3:55AM)
Blog Post# 314287-202     
UP44**     Added by: UP44**    Jan 30 2012 (11:24PM)
workers working their best

★  
Jan 28 2012 (3:58AM)
Blog Post# 314287-204     
UP44**     Added by: UP44**    Jan 30 2012 (11:24PM)
old signals present @SLN

★  
10861 views
Jan 28 2012 (4:02AM)
Blog Post# 314287-206     
UP44**     Added by: UP44**    Jan 30 2012 (11:26PM)
new electronic signals are ready to take its new place

★  
10842 views
Jan 28 2012 (4:04AM)
Blog Post# 314287-207     
UP44**     Added by: UP44**    Jan 30 2012 (11:27PM)
one more

★  
Jan 28 2012 (4:05AM)
Blog Post# 314287-208     
UP44**     Added by: UP44**    Jan 30 2012 (11:28PM)
our station board

★  
Jan 28 2012 (4:09AM)
Blog Post# 314287-210     
UP44**     Added by: UP44**    Jan 30 2012 (11:28PM)
can see the poles erected beside the station

★  
Jan 28 2012 (4:10AM)
Blog Post# 314287-211     
UP44**     Added by: UP44**    Jan 30 2012 (11:29PM)
here u can also see some poles

★  
Jan 28 2012 (4:13AM)
Blog Post# 314287-213     
UP44**     Added by: UP44**    Jan 30 2012 (11:29PM)
the space maintained to erect the poles

Jan 28 2012 (12:48PM)
Blog Post# 314287-216     
rangcharylutk**     Added by: UP44**    Jan 30 2012 (11:30PM)
yes i hv seen,,both veidio and your photo with poles, after poles lot of work left,wiring,most erection,earthing,jointing rails or putting spring wires as joints (rails are earthing points) adjusting,seperate wiring for return conductors to avoid distrubance to telephone signals,fixing cautoion boards,fixing counterweights depending upon the weather etc..of work left

★  
Jan 31 2012 (2:22AM)
Blog Post# 314287-227     
UP44**     Added by: UP44**    Feb 20 2012 (3:47AM)
how is this ??
my new creation :)

Feb 04 2012 (10:44PM)
Blog Post# 314287-232     
Mohd Arif**     Added by: UP44**    Feb 20 2012 (3:47AM)
little video about sln jn electrification work [part2]
video taken by me

★  
Feb 19 2012 (11:54PM)
Blog Post# 314287-257     
Mohd Arif**     Added by: UP44**    Feb 20 2012 (3:48AM)
electrification work is nearly completed